DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER08–638–000; ER08–638–
001]
Crafton LLC; Notice of Issuance of
Order
jlentini on PROD1PC65 with NOTICES
May 23, 2008.
Crafton LLC (Crafton LLC) filed an
application for market-based rate
authority, with an accompanying rate
schedule. The proposed market-based
rate schedule provides for the sale of
energy and capacity at market-based
rates. Crafton also requested waivers of
various Commission regulations. In
particular, Crafton requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by Crafton.
On May 23, 2008, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the requests
for blanket approval under part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
Crafton, should file a protest with the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426, in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure. 18 CFR 385.211,
385.214 (2004). The Commission
encourages the electronic submission of
protests using the FERC Online link at
https://www.ferc.gov.
Notice is hereby given that the
deadline for filing protests is June 23,
2008.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, Crafton is
authorized to issue securities and
assume obligations or liabilities as a
guarantor, indorser, surety, or otherwise
in respect of any security of another
person; provided that such issuance or
assumption is for some lawful object
within the corporate purposes of
Crafton, compatible with the public
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of Crafton’s issuance of
securities or assumptions of liability.
VerDate Aug<31>2005
19:06 May 30, 2008
Jkt 214001
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at
https://www.ferc.gov, using the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See, 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–12210 Filed 5–30–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR08–23–000]
Worsham-Steed Gas Storage, L.P.;
Notice of Petition for Rate Approval
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
Wednesday, June 4, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–12207 Filed 5–30–08; 8:45 am]
BILLING CODE 6717–01–P
May 23, 2008.
Take notice that on May 12, 2008,
Worsham-Steed Gas Storage, L.P.
(Worsham-Steed), an intrastate naturalgas storage company, filed a petition for
rate approval of market based rates for
transportation services pursuant to
section 284.123(b)(2) of the
Commission’s Regulations. WorshamSteed requests that the Commission
authorize it to charge market-based rates
for its transportation services pursuant
to section 311 of the Natural Gas Policy
Act of 1978.
Any person desiring to participate in
this rate proceeding must file a motion
to intervene or to protest this filing must
file in accordance with Rules 211 and
214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214). Protests will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Any person wishing to become a party
must file a notice of intervention or
motion to intervene, as appropriate.
Such notices, motions, or protests must
be filed on or before the date as
indicated below. Anyone filing an
intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER02–2001–007, et al.]
Electric Quarterly Reports, etc.; Notice
of Revocation of Market-Based Rate
Tariffs
May 23, 2008.
In the matter of: Electric Quarterly Reports,
Docket No. ER02–2001–007; Dunhill Power,
L.P., Docket No. ER07–430–000; Exel Power
Sources, LLC, Docket No. ER07–591–000.
On April 30, 2008, the Commission
issued an order announcing its intent to
withdraw the market-based rate
authority of two public utilities that had
failed to file their required Electric
Quarterly Reports.1 The Commission
gave the utilities fifteen days in which
to file their overdue Electric Quarterly
Reports or face revocation of their
market-based rate tariffs.
In Order No. 2001, the Commission
revised its public utility filing
requirements and established a
requirement for public utilities,
including power marketers, to file
Electric Quarterly Reports summarizing
the contractual terms and conditions in
1 Electric Quarterly Reports, 123 FERC ¶ 61,102
(2008) (April 30 Order).
E:\FR\FM\02JNN1.SGM
02JNN1
31461
Federal Register / Vol. 73, No. 106 / Monday, June 2, 2008 / Notices
their agreements for all jurisdictional
services (including market-based power
sales, cost-based power sales, and
transmission service) and providing
transaction information (including rates)
for short-term and long-term power
sales during the most recent calendar
quarter. 2
In the April 30 Order, the
Commission directed the public utilities
it had identified to file the required
reports within 15 days of the date of
issuance of the order or face revocation
of their authority to sell power at
market-based rates and termination of
their electric market-based rate tariffs.3
The time period for compliance with
the April 30 Order has elapsed. The two
companies identified in the April 30
Order (Dunhill Power, L.P. and Exel
Power Sources, LLC) have failed to file
their delinquent Electric Quarterly
Reports.
The Commission hereby withdraws
the market-based rate authority and
terminates the electric market-based rate
tariff for each of the 90 companies
captioned above in this Notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–12209 Filed 5–30–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Setting Forth Timeline
May 22, 2008.
PSEG Energy Resources & Trade LLC ..........................................................................................................................
Public Service Electric and Gas Company ...................................................................................................................
PSEG Power Connecticut LLC ......................................................................................................................................
PSEG Fossil LLC ............................................................................................................................................................
PSEG Nuclear LLC .........................................................................................................................................................
Allegheny Power ............................................................................................................................................................
Allegheny Energy Supply Company, LLC ...................................................................................................................
Green Valley Hydro, LLC ..............................................................................................................................................
Buchanan Generation, LLC ...........................................................................................................................................
PPL Electric Utilities Corporation ................................................................................................................................
Lower Mount Bethel Energy, LLC ................................................................................................................................
PPL
PPL
PPL
PPL
PPL
PPL
Brunner Island, LLC ..............................................................................................................................................
Holtwood, LLC .......................................................................................................................................................
Marlins Creek, LLC ................................................................................................................................................
Montour, LLC .........................................................................................................................................................
Susquehanna, LLC .................................................................................................................................................
University Park, LLC .............................................................................................................................................
PPL EnergyPlus, LLC .....................................................................................................................................................
PPL Edgewood Energy, LLC ..........................................................................................................................................
PPL Shoreham Energy, LLC ..........................................................................................................................................
PPL Great Works, LLC ...................................................................................................................................................
PPL Maine, LLC .............................................................................................................................................................
PPL Wallingford Energy LLC ........................................................................................................................................
Atlantic City Electric Company ....................................................................................................................................
Delmarva Power & Light Company ..............................................................................................................................
Potomac Electric Power Company ................................................................................................................................
Conectiv Energy Supply, Inc. .......................................................................................................................................
Conectiv Bethlehem, LLC ..............................................................................................................................................
Pepco Energy Services, Inc. ..........................................................................................................................................
jlentini on PROD1PC65 with NOTICES
Bethlehem Renewable Energy, LLC ..............................................................................................................................
Eastern Landfill Gas, LLC .............................................................................................................................................
Potomac Power Resources, LLC ....................................................................................................................................
Fauquier Landfill Gas, LLC ...........................................................................................................................................
Dominion Energy Marketing, Inc. .................................................................................................................................
2 Revised Public Utility Filing Requirements,
Order No. 2001, 67 Fed. Reg. 31043, FERC Stats. &
Regs. ¶ 31,127 (April 25, 2002), reh’g denied, Order
VerDate Aug<31>2005
19:06 May 30, 2008
Jkt 214001
No. 2001–A, 100 FERC ¶ 61,074, reconsideration
and clarification denied, Order No. 2001–B, 100
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
Docket
008
Docket
Docket
Docket
Docket
Docket
005
Docket
Docket
006
Docket
005
Docket
008
Docket
003
Docket
Docket
Docket
Docket
Docket
Docket
005
Docket
003
Docket
003
Docket
003
Docket
005
Docket
003
Docket
004
Docket
013
Docket
011
Docket
009
Docket
019
Docket
Docket
015
Docket
Docket
003
Docket
Docket
Docket
No. ER99–3151–
No.
No.
No.
No.
No.
ER97–837–007
ER03–327–002
ER08–447–000
ER08–448–000
ER98–1466–
No. ER00–814–006
No. ER00–2924–
No. ER02–1638–
No. ER00–1712–
No. ER02–2408–
No.
No.
No.
No.
No.
No.
ER00–744–006
ER00–744–006
ER00–744–006
ER00–744–006
ER00–744–006
ER02–1327–
No. ER00–1703–
No. ER02–1749–
No. ER02–1747–
No. ER99–4503–
No. ER00–2186–
No. ER01–1559–
No. ER96–1361–
No. ER99–2781–
No. ER98–4138–
No. ER00–1770–
No. ER02–453–010
No. ER98–3096–
No. ER07–903–002
No. ER05–1054–
No. ER01–202–008
No. ER04–472–007
No. ER01–468–008
FERC ¶ 61,342, order directing filings, Order No.
2001–C, 101 FERC ¶ 61,314 (2002).
3 3 April 30 Order at Ordering Paragraph A.
E:\FR\FM\02JNN1.SGM
02JNN1
Agencies
[Federal Register Volume 73, Number 106 (Monday, June 2, 2008)]
[Notices]
[Pages 31460-31461]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-12209]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER02-2001-007, et al.]
Electric Quarterly Reports, etc.; Notice of Revocation of
Market-Based Rate Tariffs
May 23, 2008.
In the matter of: Electric Quarterly Reports, Docket No. ER02-
2001-007; Dunhill Power, L.P., Docket No. ER07-430-000; Exel Power
Sources, LLC, Docket No. ER07-591-000.
On April 30, 2008, the Commission issued an order announcing its
intent to withdraw the market-based rate authority of two public
utilities that had failed to file their required Electric Quarterly
Reports.\1\ The Commission gave the utilities fifteen days in which to
file their overdue Electric Quarterly Reports or face revocation of
their market-based rate tariffs.
---------------------------------------------------------------------------
\1\ Electric Quarterly Reports, 123 FERC ] 61,102 (2008) (April
30 Order).
---------------------------------------------------------------------------
In Order No. 2001, the Commission revised its public utility filing
requirements and established a requirement for public utilities,
including power marketers, to file Electric Quarterly Reports
summarizing the contractual terms and conditions in
[[Page 31461]]
their agreements for all jurisdictional services (including market-
based power sales, cost-based power sales, and transmission service)
and providing transaction information (including rates) for short-term
and long-term power sales during the most recent calendar quarter. \2\
---------------------------------------------------------------------------
\2\ Revised Public Utility Filing Requirements, Order No. 2001,
67 Fed. Reg. 31043, FERC Stats. & Regs. ] 31,127 (April 25, 2002),
reh'g denied, Order No. 2001-A, 100 FERC ] 61,074, reconsideration
and clarification denied, Order No. 2001-B, 100 FERC ] 61,342, order
directing filings, Order No. 2001-C, 101 FERC ] 61,314 (2002).
---------------------------------------------------------------------------
In the April 30 Order, the Commission directed the public utilities
it had identified to file the required reports within 15 days of the
date of issuance of the order or face revocation of their authority to
sell power at market-based rates and termination of their electric
market-based rate tariffs.\3\
---------------------------------------------------------------------------
\3\ 3 April 30 Order at Ordering Paragraph A.
---------------------------------------------------------------------------
The time period for compliance with the April 30 Order has elapsed.
The two companies identified in the April 30 Order (Dunhill Power, L.P.
and Exel Power Sources, LLC) have failed to file their delinquent
Electric Quarterly Reports.
The Commission hereby withdraws the market-based rate authority and
terminates the electric market-based rate tariff for each of the 90
companies captioned above in this Notice.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-12209 Filed 5-30-08; 8:45 am]
BILLING CODE 6717-01-P