Download as PDF jlentini on PROD1PC65 with NOTICES Federal Register / Vol. 73, No. 98 / Tuesday, May 20, 2008 / Notices for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Project: The proposed project would utilize the existing U.S. Army Corps of Engineers’ Coralville Lake Dam and would consist of: (1) Two 70-foot-long, 180-inch diameter proposed penstocks; (2) a proposed powerhouse containing two generating units with a total installed capacity of 5.7-megawatts; (3) a proposed transmission line; and (4) appurtenant facilities. The proposed project would have an estimated annual generation of 50-gigawatts and would be sold to a local utility. l. Location of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Competing Preliminary Permit— Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30 and 4.36. o. Competing Development Application—Any qualified development applicant desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a VerDate Aug<31>2005 18:23 May 19, 2008 Jkt 214001 notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30 and 4.36. p. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. q. Proposed Scope of Studies Under Permit—A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. r. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. s. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘NOTICE OF INTENT TO FILE COMPETING APPLICATION’’, ‘‘COMPETING APPLICATION’’, ‘‘PROTEST’’, and ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 29129 application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. t. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–11198 Filed 5–19–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP08–389–000] Coastal Bend Gas Storage, LLC; Notice of Application May 13, 2008. Take notice that on May 7, 2008, Coastal Bend Gas Storage, LLC (CBGS), 400, 607—8th Avenue, SW., Calgary, AB, T2P 0A7, Canada, filed in Docket No. CP08–389–000, a petition for Exemption of Temporary Acts and Operations from Certificate Requirements, pursuant to Rule 207(a)(5) of the Commission’s Rules of Practice and Procedure, and section 7(c)(1)(B) of the Natural Gas Act, seeking approval of an exemption from certificate requirements to perform temporary activities designed to determine the feasibility of developing an underground natural gas storage facility in San Patricio and Refugio Counties, Texas, as more fully set forth in the petition which is open to the public for inspection. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, E:\FR\FM\20MYN1.SGM 20MYN1 jlentini on PROD1PC65 with NOTICES 29130 Federal Register / Vol. 73, No. 98 / Tuesday, May 20, 2008 / Notices in the docket number field to access the document. For assistance, call (202) 502–8659 or TTY, (202) 208–3676. Any questions regarding this application should be directed to counsel for CBGS, Douglas F. John, John & Hengerer, 1730 Rhode Island Avenue, NW., Suite 600, Washington, DC 20036, or via telephone at (202) 429–8800, facsimile number (202) 429–8805, or email djohn@jhenergy.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition VerDate Aug<31>2005 18:23 May 19, 2008 Jkt 214001 to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: May 28, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–11201 Filed 5–19–08; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 May 14, 2008. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP08–372–000. Applicants: Ozark Gas Transmission, L.L.C. Description: Ozark Gas Transmission, LLC modifies its FERC Gas Tariff to permit Ozark and a firm transportation service customer to negotiate the fuel retention percentage that will be applicable to customers. Filed Date: 05/12/2008. Accession Number: 20080513–0195. Comment Date: 5 p.m. Eastern Time on Tuesday, May 27, 2008 Docket Numbers: RP08–373–000. Applicants: Wyoming Interstate Company, Ltd. Description: Wyoming Interstate Co, Ltd submits Second Revised Sheet 6 et al. to FERC Gas Tariff, Second Revised Volume 2, to become effective 6/10/08. Filed Date: 05/12/2008. Accession Number: 20080513–0194. Comment Date: 5 p.m. Eastern Time on Tuesday, May 27, 2008. Docket Numbers: RP08–374–000. Applicants: Maritimes & Northeast Pipeline, L.L.C. Description: Maritimes & Northeast Pipeline LLC submits First Revised Sheet 268 et al. to FERC Gas Tariff, First Revised Volume 1, to become effective 6/11/08. Filed Date: 05/12/2008. Accession Number: 20080513–0100. Comment Date: 5 p.m. Eastern Time on Tuesday, May 27, 2008. Docket Numbers: RP08–375–000. Applicants: Energy West Development, Inc. Description: Energy West Development, Inc submits First Revised Sheet 1 et al. to its FERC Gas Tariff, Volume 1, to become effective 6/12/08. Filed Date: 05/12/2008. Accession Number: 20080513–0196. Comment Date: 5 p.m. Eastern Time on Tuesday, May 27, 2008. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously E:\FR\FM\20MYN1.SGM 20MYN1

Agencies

[Federal Register Volume 73, Number 98 (Tuesday, May 20, 2008)]
[Notices]
[Pages 29129-29130]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-11201]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. CP08-389-000]


Coastal Bend Gas Storage, LLC; Notice of Application

May 13, 2008.
    Take notice that on May 7, 2008, Coastal Bend Gas Storage, LLC 
(CBGS), 400, 607--8th Avenue, SW., Calgary, AB, T2P 0A7, Canada, filed 
in Docket No. CP08-389-000, a petition for Exemption of Temporary Acts 
and Operations from Certificate Requirements, pursuant to Rule 
207(a)(5) of the Commission's Rules of Practice and Procedure, and 
section 7(c)(1)(B) of the Natural Gas Act, seeking approval of an 
exemption from certificate requirements to perform temporary activities 
designed to determine the feasibility of developing an underground 
natural gas storage facility in San Patricio and Refugio Counties, 
Texas, as more fully set forth in the petition which is open to the 
public for inspection. This filing may also be viewed on the 
Commission's Web site at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits,

[[Page 29130]]

in the docket number field to access the document. For assistance, call 
(202) 502-8659 or TTY, (202) 208-3676.
    Any questions regarding this application should be directed to 
counsel for CBGS, Douglas F. John, John & Hengerer, 1730 Rhode Island 
Avenue, NW., Suite 600, Washington, DC 20036, or via telephone at (202) 
429-8800, facsimile number (202) 429-8805, or e-mail 
djohn@jhenergy.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and 14 copies of the protest or intervention to the 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: May 28, 2008.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-11201 Filed 5-19-08; 8:45 am]
BILLING CODE 6717-01-P