Environmental Impacts Statements; Notice of Availability, 28461 [E8-11009]
Download as PDF
Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices
fully assess and mitigate all potential
impacts of the management actions.
Dated: May 13, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–11069 Filed 5–15–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6698–8]
sroberts on PROD1PC70 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed May 5, 2008 Through May 9, 2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080181, Draft EIS, FAA, OH,
Port Columbus International Airport
(CMH) Project, Replacement of
Runway 10R/28L, Development of a
New Passenger Terminal and other
Associated Airport Projects, Funding,
City of Columbus, OH, Comment
Period Ends: 07/11/2008, Contact:
Katherine Jones 734–229–2958.
EIS No. 20080182, Final EIS, AFS, NM
Perk-Grindstone Fuel Reduction
Project, To Protect Life, Property, and
Natural Resources, Village of Ruidoso,
Lincoln National Forest, Lincoln
County, New Mexico, Wait Period
Ends: 06/16/2008, Contact: Ron
Hannan 575–434–7245.
EIS No. 20080183, Final EIS, FHW, 00,
US–131 Improvement Study, from the
Indiana Toll Road (I–80/90) to a Point
One Mile North of Cowling Road, U.S.
Army COE Section 404 Permit, St.
Joseph County, MI and Elkhart
County, IN, Wait Period Ends: 06/16/
2008, Contact: David T. Williams
517–702–1820.
EIS No. 20080184, Draft EIS, FHW, IA,
I–29 Improvements in Sioux City,
Construction from Burlington
Northern Santa Fe Rail Road (BNSF)
Bridge over the Missouri River to
Existing Hamilton Boulevard
Interchange, Woodbury County, IA,
Comment Period Ends: 06/30/2008,
Contact: Philip Barnes 515–233–7300.
EIS No. 20080185, Draft Supplement,
FSA, 00, Programmatic—Expansion of
the Emergency Conservation Program,
To Restore Farmland (Cropland,
Hayland and Pastureland) to a Normal
Productive State after a Natural
Disaster, Comment Period Ends: 06/
VerDate Aug<31>2005
16:18 May 15, 2008
Jkt 214001
30/2008, Contact: Matthew Ponish
202–720–6853.
EIS No. 20080186, Draft EIS, FAA, NV,
City of Mesquite, Proposed
Replacement General Aviation
Airport, Implementation, Clark
County, NV, Comment Period Ends:
07/03/2008, Contact: Barry Franklin
650–876–2778.
EIS No. 20080187, Final EIS, AFS, MT,
Marten Creek Project, Proposed
Timber Harvest, Prescribed Fire
Burning, Watershed Restoration, and
Associated Activities, Cabinet Ranger
District, Kootenai National Forest,
Sanders County, MT, Wait Period
Ends: 06/16/2008, Contact: John Head
406–827–3533.
EIS No. 20080188, Final EIS, IBW, CA,
Programmatic—Tijuana River Flood
Control Project, Proposing a Range of
Alternatives for Maintenance
Activities and Future Improvements,
San Diego County, CA, Wait Period
Ends: 06/16/2008, Contact: Daniel
Borunda 915–832–4767.
EIS No. 20080189, Final EIS, NSA, NM,
Continued Operations of Los Alamos
National Laboratory, Proposal to
Expand Overall Operational Levels,
(DOE/EIS–0380), Site Wide, Los
Alamos County, NM, Wait Period
Ends: 06/16/2008, Contact: Elizabeth
Withers 505–665–0308.
EIS No. 20080190, Draft Supplement,
USA, 00, Programmatic—Army
Growth and Force Structure
Realignment, Evaluation of
Alternatives for Supporting the
Growth, Realignment, and
Transformation of the Army to
Support Operations in the Pacific
Theater, Implementation, Nationwide
and the Pacific Region of AK, HI,
Comment Period Ends: 06/30/2008,
Contact: Mike Ackerman 410–436–
2522.
EIS No. 20080191, Final Supplement,
AFS, MT, Fishtrap Project, Updated
Information on Past Maintenance/
Restorative Treatments within Old
Growth Stands, Timber Harvest,
Prescribed Burning, Road
Construction and Other Restoration
Activities, Lolo National Forest,
Plains/Thompson Falls Ranger
District, Sanders County, MT, Wait
Period Ends: 06/30/2008, Contact:
Randy Hojem 406–826–4308.
EIS No. 20080192, Draft EIS, AFS, MT,
Sheppard Creek Post-Fire Project,
Timber Salvage, Implementation,
Flathead National Forest, Flathead
and Lincoln Counties, MT, Comment
Period Ends: 07/01/2008, Contact:
Bryan Donner 406–758–3508.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
28461
Amended Notices
EIS No. 20080106, Draft EIS, AFS, CO,
Long Draw Reservoir Project, Re-Issue
a Special-Use-Authorization to Water
Supply and Storage to Allow the
Continued Use of Long Draw
Reservoir and Dam, Arapaho and
Roosevelt National Forests and
Pawnee National Grassland, Grand
and Larimer Counties, CO, Comment
Period Ends: 06/11/2008, Contact:
Ken Tu 970–295–6623. Revision of FR
Notice Published 03/28/2008:
Extending Comment Period from 05/
12/2008 to 06/11/2008.
EIS No. 20080163, Draft EIS, AFS, AK,
Withdrawn—Spencer Mineral
Materials Project, Proposal to Develop
and Extract Quarry Rock and Gravel
from a Site near Spencer Glacier,
Chugach National Forest, Kenal
Borough, AK, Comment Period Ends:
06/16/2008, Contact: Alice Allen 605–
673–4853. Revision to FR Notice
Published 05/02/2008: Officially
Withdrawn by the Preparing Agency.
EIS No. 20080171, Draft EIS, NOA, WA,
Proposed Authorization of the Makah
Indian Tribe’s Request to Hunt Gray
Whales in the Tribe’s Usual and
Accustomed Fishing Grounds off the
Coast of Washington, Comment
Period Ends: 07/08/2008, Contact:
Donna Darm 206–526–6150. Revision
to FR Notice Published 05/09/2008:
Correction to Title and Comment
Period from 07/07/2008 to 07/08/
2008.
Dated: May 13, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–11009 Filed 5–15–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2008–0046; FRL–8361–6]
Notice of Filing of Pesticide Petitions
for Residues of Pesticide Chemicals in
or on Various Commodities
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: This notice announces the
initial filing of pesticide petitions
proposing the establishment or
modification of regulations for residues
of pesticide chemicals in or on various
commodities.
DATES: Comments must be received on
or before June 16, 2008.
ADDRESSES: Submit your comments,
identified by docket identification (ID)
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 73, Number 96 (Friday, May 16, 2008)]
[Notices]
[Page 28461]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-11009]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6698-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed May 5, 2008 Through May 9, 2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080181, Draft EIS, FAA, OH, Port Columbus International
Airport (CMH) Project, Replacement of Runway 10R/28L, Development of a
New Passenger Terminal and other Associated Airport Projects, Funding,
City of Columbus, OH, Comment Period Ends: 07/11/2008, Contact:
Katherine Jones 734-229-2958.
EIS No. 20080182, Final EIS, AFS, NM Perk-Grindstone Fuel Reduction
Project, To Protect Life, Property, and Natural Resources, Village of
Ruidoso, Lincoln National Forest, Lincoln County, New Mexico, Wait
Period Ends: 06/16/2008, Contact: Ron Hannan 575-434-7245.
EIS No. 20080183, Final EIS, FHW, 00, US-131 Improvement Study, from
the Indiana Toll Road (I-80/90) to a Point One Mile North of Cowling
Road, U.S. Army COE Section 404 Permit, St. Joseph County, MI and
Elkhart County, IN, Wait Period Ends: 06/16/2008, Contact: David T.
Williams 517-702-1820.
EIS No. 20080184, Draft EIS, FHW, IA, I-29 Improvements in Sioux City,
Construction from Burlington Northern Santa Fe Rail Road (BNSF) Bridge
over the Missouri River to Existing Hamilton Boulevard Interchange,
Woodbury County, IA, Comment Period Ends: 06/30/2008, Contact: Philip
Barnes 515-233-7300.
EIS No. 20080185, Draft Supplement, FSA, 00, Programmatic--Expansion of
the Emergency Conservation Program, To Restore Farmland (Cropland,
Hayland and Pastureland) to a Normal Productive State after a Natural
Disaster, Comment Period Ends: 06/30/2008, Contact: Matthew Ponish 202-
720-6853.
EIS No. 20080186, Draft EIS, FAA, NV, City of Mesquite, Proposed
Replacement General Aviation Airport, Implementation, Clark County, NV,
Comment Period Ends: 07/03/2008, Contact: Barry Franklin 650-876-2778.
EIS No. 20080187, Final EIS, AFS, MT, Marten Creek Project, Proposed
Timber Harvest, Prescribed Fire Burning, Watershed Restoration, and
Associated Activities, Cabinet Ranger District, Kootenai National
Forest, Sanders County, MT, Wait Period Ends: 06/16/2008, Contact: John
Head 406-827-3533.
EIS No. 20080188, Final EIS, IBW, CA, Programmatic--Tijuana River Flood
Control Project, Proposing a Range of Alternatives for Maintenance
Activities and Future Improvements, San Diego County, CA, Wait Period
Ends: 06/16/2008, Contact: Daniel Borunda 915-832-4767.
EIS No. 20080189, Final EIS, NSA, NM, Continued Operations of Los
Alamos National Laboratory, Proposal to Expand Overall Operational
Levels, (DOE/EIS-0380), Site Wide, Los Alamos County, NM, Wait Period
Ends: 06/16/2008, Contact: Elizabeth Withers 505-665-0308.
EIS No. 20080190, Draft Supplement, USA, 00, Programmatic--Army Growth
and Force Structure Realignment, Evaluation of Alternatives for
Supporting the Growth, Realignment, and Transformation of the Army to
Support Operations in the Pacific Theater, Implementation, Nationwide
and the Pacific Region of AK, HI, Comment Period Ends: 06/30/2008,
Contact: Mike Ackerman 410-436-2522.
EIS No. 20080191, Final Supplement, AFS, MT, Fishtrap Project, Updated
Information on Past Maintenance/Restorative Treatments within Old
Growth Stands, Timber Harvest, Prescribed Burning, Road Construction
and Other Restoration Activities, Lolo National Forest, Plains/Thompson
Falls Ranger District, Sanders County, MT, Wait Period Ends: 06/30/
2008, Contact: Randy Hojem 406-826-4308.
EIS No. 20080192, Draft EIS, AFS, MT, Sheppard Creek Post-Fire Project,
Timber Salvage, Implementation, Flathead National Forest, Flathead and
Lincoln Counties, MT, Comment Period Ends: 07/01/2008, Contact: Bryan
Donner 406-758-3508.
Amended Notices
EIS No. 20080106, Draft EIS, AFS, CO, Long Draw Reservoir Project, Re-
Issue a Special-Use-Authorization to Water Supply and Storage to Allow
the Continued Use of Long Draw Reservoir and Dam, Arapaho and Roosevelt
National Forests and Pawnee National Grassland, Grand and Larimer
Counties, CO, Comment Period Ends: 06/11/2008, Contact: Ken Tu 970-295-
6623. Revision of FR Notice Published 03/28/2008: Extending Comment
Period from 05/12/2008 to 06/11/2008.
EIS No. 20080163, Draft EIS, AFS, AK, Withdrawn--Spencer Mineral
Materials Project, Proposal to Develop and Extract Quarry Rock and
Gravel from a Site near Spencer Glacier, Chugach National Forest, Kenal
Borough, AK, Comment Period Ends: 06/16/2008, Contact: Alice Allen 605-
673-4853. Revision to FR Notice Published 05/02/2008: Officially
Withdrawn by the Preparing Agency.
EIS No. 20080171, Draft EIS, NOA, WA, Proposed Authorization of the
Makah Indian Tribe's Request to Hunt Gray Whales in the Tribe's Usual
and Accustomed Fishing Grounds off the Coast of Washington, Comment
Period Ends: 07/08/2008, Contact: Donna Darm 206-526-6150. Revision to
FR Notice Published 05/09/2008: Correction to Title and Comment Period
from 07/07/2008 to 07/08/2008.
Dated: May 13, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E8-11009 Filed 5-15-08; 8:45 am]
BILLING CODE 6560-50-P