Notice of Availability of the Final Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, NM, 28453-28454 [E8-11007]
Download as PDF
Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the Natural Gas Act
(NGA) (18 CFR 157.205) a protest to the
request. If no protest is filed within the
time allowed therefor, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to Section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 C. 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–11020 Filed 5–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Supplemental Notice Announcing
Revised Treatment of Initial Electric
Market-Based Rate Authorization
Filings That Also Request Blanket
Section 204 Authorization
sroberts on PROD1PC70 with NOTICES
May 8, 2008.
On April 3, 2008, the Commission
issued a notice stating that, effective
April 3, 2008, it would issue a separate
combined notice of filing for initial
electric market-based rate authorization
filings.
Upon further consideration, and
effective upon the date of issuance of
this supplemental notice, the
Commission instead will include initial
electric market-based rate authorization
filings along with other filings in a
combined notice of filing. However,
once it is determined that an initial
electric market-based rate authorization
filing includes a request for blanket
authorization, pursuant 18 CFR Part 34,
of future issuances of securities and
assumptions of liability, it will issue a
separate supplemental notice.
By this initiative, the Commission
seeks to expedite the process for
noticing initial electric market-based
VerDate Aug<31>2005
16:18 May 15, 2008
Jkt 214001
rate authorization filings, while also
providing notice of requests for blanket
authorizations for future issuances of
securities and assumptions of liabilities.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10964 Filed 5–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
National Nuclear Security
Administration
Notice of Availability of the Final SiteWide Environmental Impact Statement
for Continued Operation of Los
Alamos National Laboratory, Los
Alamos, NM
U.S. Department of Energy
(DOE), National Nuclear Security
Administration (NNSA).
ACTION: Notice of Availability.
AGENCY:
SUMMARY: NNSA announces the
availability of the Final Site-Wide
Environmental Impact Statement for
Continued Operation of Los Alamos
National Laboratory, Los Alamos, New
Mexico (Final SWEIS) (DOE/EIS–0380).
The Final SWEIS analyzes the potential
environmental impacts of continuing to
operate Los Alamos National Laboratory
(LANL) and addresses public comments
received on the Draft SWEIS. NNSA’s
Preferred Alternative for LANL, as
identified in the Draft and Final SWEIS,
is the Expanded Operations Alternative.
The Final SWEIS also evaluates a No
Action Alternative and a Reduced
Operations Alternative.
DATES: NNSA will not issue Records of
Decision based on the SWEIS before 30
days have passed from the publication
of this notice of availability.
ADDRESSES: A copy of the Final SWEIS
may be obtained by writing to: U.S.
Department of Energy, National Nuclear
Security Administration, Los Alamos
Site Office, Attn: NEPA Compliance
Officer, Environmental Operations, 528
35th Street, Los Alamos, New Mexico
87544.
Requests for copies of the document
may also be sent by facsimile ((505)
845–4239); or by E-mail
(LANL_SWEIS@doeal.gov) or
LASO.SWEIS@doeal.gov. The Final
SWEIS will also be available on the
NNSA Los Alamos Site Office’s NEPA
Web site at: https://www.doeal.gov/laso/
NEPASWEIS.aspx. Copies of the Final
SWEIS are also available for review at
the following locations: The Los Alamos
Research Library, West Jemez Road, Los
Alamos National Laboratory, Los
Alamos, New Mexico; the Office of the
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
28453
Northern New Mexico Citizens
Advisory Board, 1660 Old Pecos Trail,
Suite B, Santa Fe, New Mexico; and, the
Zimmerman Library, Central Avenue,
University of New Mexico,
Albuquerque, New Mexico.
FOR FURTHER INFORMATION CONTACT: For
general information on NNSA’s NEPA
process, please contact: Ms. Alice C.
Williams, NA–50, NEPA Compliance
Officer, U.S. Department of Energy,
National Nuclear Security
Administration, 1000 Independence
Avenue, SW., Washington, DC 20585, or
telephone 1–202–586–6847. For general
information about the DOE NEPA
process, please contact: Ms. Carol
Borgstrom, Director, Office of NEPA
Policy and Compliance (GC–20), U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585, (202) 586–4600,
or leave a message at 1–800–472–2756.
SUPPLEMENTARY INFORMATION: The
primary purpose and need for continued
operation of LANL is to provide support
for DOE and NNSA core missions as
directed by Congress and the President.
NNSA’s need to continue operating
LANL arises from its obligation to
ensure a safe and reliable nuclear
weapons stockpile. LANL is also needed
to support other Federal agencies,
including the Department of Homeland
Security. The Final SWEIS analyzed the
environmental impacts of operating
LANL at different levels. LANL is
located in north-central New Mexico
and covers an area of about 40 square
miles (104 square kilometers). It was
established in 1943 as ‘‘Project Y’’ of the
Manhattan Project with a single
mission—to build the world’s first
nuclear weapons. After World War II
ended, Project Y was designated a
permanent research and development
laboratory and its work was expanded to
incorporate a wide variety of
assignments in support of other
government and civilian programs.
LANL is now a multi-disciplinary,
multipurpose institution engaged in
theoretical and experimental research
and development.
DOE issued a Final SWEIS and
Record of Decision in 1999 for the
continued operation of the laboratory.
DOE regulations implementing NEPA
require the evaluation of site-wide
NEPA analyses every five years to
determine their continued applicability;
such a five-year evaluation was initiated
for the 1999 SWEIS in 2004, and NNSA
subsequently decided to prepare a new
SWEIS. A new Draft SWEIS was issued
in July 2006 for public review and
comment over a 75-day period. NNSA
considered the comments received on
E:\FR\FM\16MYN1.SGM
16MYN1
28454
Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices
the Draft SWEIS in preparing the Final
SWEIS.
The alternatives evaluated in the
Final SWEIS represent a range of
operational levels from the minimal
reasonable activity levels (Reduced
Operations Alternative) to the highest
reasonable activity levels that could be
supported by current facilities
combined with expansion and
construction of new facilities (Expanded
Operations Alternative). The No Action
Alternative would continue current
mission support work at LANL and
includes actions, facility construction,
and other activities for which NEPA
analyses have already been completed.
All alternatives assumed that NNSA
will continue to operate LANL as a
national security laboratory for the
foreseeable future.
Subsequent Document Preparation:
NNSA will consider the environmental
impact analysis presented in the Final
LANL SWEIS, along with other
information, in making decisions
regarding the continued operation of
LANL. NNSA will wait to issue a ROD
for at least 30 days following
publication in the Federal Register of
this notice of availability. It is
anticipated that several RODs may be
issued based on the Final SWEIS over
the next several years. NNSA will
publish all RODs in the Federal
Register.
Signed in Washington, DC, this 4th day of
April, 2008.
Thomas P. D’Agostino,
Administrator, National Nuclear Security
Administration.
[FR Doc. E8–11007 Filed 5–15–08; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8567–1, EPA–HQ–OW–2008–0238]
Draft National Pollutant Discharge
Elimination System (NPDES) General
Permit for Stormwater Discharges
From Construction Activities
Environmental Protection
Agency (EPA).
ACTION: Notice of proposed permit
issuance.
sroberts on PROD1PC70 with NOTICES
AGENCY:
SUMMARY: EPA Regions 1, 2, 3, 5, 6, 7,
8, 9, and 10 today are proposing for
public comment the issuance of their
2008 National Pollutant Discharge
Elimination System general permits for
stormwater discharges from new
VerDate Aug<31>2005
16:18 May 15, 2008
Jkt 214001
dischargers engaged in large and small
construction activities. Hereinafter,
these NPDES general permits will be
referred to as ‘‘permit’’ or ‘‘2008
construction general permit’’ or ‘‘2008
CGP.’’ ‘‘New dischargers’’ are those who
did not file a notice of intent (‘‘NOI’’) to
be covered under the 2003 construction
general permit (‘‘2003 CGP’’) before it
expired. Existing dischargers who
properly filed an NOI to be covered
under the 2003 CGP continue to be
authorized to discharge under that
permit according to its terms. This draft
2008 CGP contains the same limits and
conditions as the Agency’s 2003 CGP
with the exception of a few minor
modifications which are detailed below.
As proposed, EPA is issuing this CGP
for a period not to exceed two (2) years
and will make the permit available to
new construction activities and
unpermitted ongoing activities only.
In addition to proposing this draft
CGP, EPA is also requesting comments
on the criteria to be used by the Agency
to incorporate, by reference, ‘‘qualifying
local program requirements’’ for erosion
and sediment control as provided for in
EPA’s regulations. Approved qualifying
local program requirements can then be
incorporated by reference into the
Agency’s construction general permit. A
construction site operator with
construction activities within the
jurisdiction of the qualifying local
program can follow local erosion and
sediment control requirements in lieu of
complying with comparable erosion and
sediment control requirements in EPA’s
CGP.
DATES: Comments on EPA’s proposal,
including the draft permit, must be
postmarked by June 16, 2008.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–HQ–
OW–2008–0238, by one of the following
methods:
• www.regulations.gov: Follow the
on-line instructions for submitting
comments.
• E-mail: ow-docket@epa.gov.
• Mail: Water Docket, Environmental
Protection Agency, Mailcode: 2822T,
1200 Pennsylvania Ave., NW.,
Washington, DC 20460.
• Hand Delivery: EPA Docket Center,
Public Reading Room, EPA
Headquarters West Building, Room
3334, 1301 Constitution Ave., NW.,
Washington, DC 20460. Such deliveries
are only accepted during the Docket’s
normal hours of operation, and special
arrangements should be made for
deliveries of boxed information.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Instructions: A copy of the draft 2008
CGP and its accompanying fact sheet is
available at www.epa.gov/npdes/
stormwater/cgp. Direct your comments
to Docket ID No. EPA–HQ–OW–2008–
0238. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through www.regulations.gov
or e-mail. The www.regulations.gov Web
site is an ‘‘anonymous access’’ system,
which means EPA will not know your
identity or contact information unless
you provide it in the body of your
comment. If you send an e-mail
comment directly to EPA without going
through www.regulations.gov your
e-mail address will be automatically
captured and included as part of the
comment that is placed in the public
docket and made available on the
Internet. If you submit an electronic
comment, EPA recommends that you
include your name and other contact
information in the body of your
comment and with any disk or CD–ROM
you submit. If EPA cannot read your
comment due to technical difficulties
and cannot contact you for clarification,
EPA may not be able to consider your
comment. Electronic files should avoid
the use of special characters, any form
of encryption, and be free of any defects
or viruses.
Docket: All documents in the docket
are listed in the www.regulations.gov
index. Although listed in the index,
some information is not publicly
available, e.g., CBI or other information
whose disclosure is restricted by statute.
Certain other material, such as
copyrighted material, will be publicly
available only in hard copy. Publicly
available docket materials are available
either electronically in
www.regulations.gov or in hard copy at
the Water Docket, EPA/DC, EPA West,
Room 3334, 1301 Constitution Ave.,
NW., Washington, DC. The Public
Reading Room is open from 8:30 a.m. to
4:30 p.m., Monday through Friday,
excluding legal holidays. The telephone
number for the Public Reading Room is
(202) 566–1744, and the telephone
number for the Water Docket is (202)
566–2426.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 73, Number 96 (Friday, May 16, 2008)]
[Notices]
[Pages 28453-28454]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-11007]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
National Nuclear Security Administration
Notice of Availability of the Final Site-Wide Environmental
Impact Statement for Continued Operation of Los Alamos National
Laboratory, Los Alamos, NM
AGENCY: U.S. Department of Energy (DOE), National Nuclear Security
Administration (NNSA).
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: NNSA announces the availability of the Final Site-Wide
Environmental Impact Statement for Continued Operation of Los Alamos
National Laboratory, Los Alamos, New Mexico (Final SWEIS) (DOE/EIS-
0380). The Final SWEIS analyzes the potential environmental impacts of
continuing to operate Los Alamos National Laboratory (LANL) and
addresses public comments received on the Draft SWEIS. NNSA's Preferred
Alternative for LANL, as identified in the Draft and Final SWEIS, is
the Expanded Operations Alternative. The Final SWEIS also evaluates a
No Action Alternative and a Reduced Operations Alternative.
DATES: NNSA will not issue Records of Decision based on the SWEIS
before 30 days have passed from the publication of this notice of
availability.
ADDRESSES: A copy of the Final SWEIS may be obtained by writing to:
U.S. Department of Energy, National Nuclear Security Administration,
Los Alamos Site Office, Attn: NEPA Compliance Officer, Environmental
Operations, 528 35th Street, Los Alamos, New Mexico 87544.
Requests for copies of the document may also be sent by facsimile
((505) 845-4239); or by E-mail (LANL_SWEIS@doeal.gov) or
LASO.SWEIS@doeal.gov. The Final SWEIS will also be available on the
NNSA Los Alamos Site Office's NEPA Web site at: https://www.doeal.gov/
laso/NEPASWEIS.aspx. Copies of the Final SWEIS are also available for
review at the following locations: The Los Alamos Research Library,
West Jemez Road, Los Alamos National Laboratory, Los Alamos, New
Mexico; the Office of the Northern New Mexico Citizens Advisory Board,
1660 Old Pecos Trail, Suite B, Santa Fe, New Mexico; and, the Zimmerman
Library, Central Avenue, University of New Mexico, Albuquerque, New
Mexico.
FOR FURTHER INFORMATION CONTACT: For general information on NNSA's NEPA
process, please contact: Ms. Alice C. Williams, NA-50, NEPA Compliance
Officer, U.S. Department of Energy, National Nuclear Security
Administration, 1000 Independence Avenue, SW., Washington, DC 20585, or
telephone 1-202-586-6847. For general information about the DOE NEPA
process, please contact: Ms. Carol Borgstrom, Director, Office of NEPA
Policy and Compliance (GC-20), U.S. Department of Energy, 1000
Independence Avenue SW., Washington, DC 20585, (202) 586-4600, or leave
a message at 1-800-472-2756.
SUPPLEMENTARY INFORMATION: The primary purpose and need for continued
operation of LANL is to provide support for DOE and NNSA core missions
as directed by Congress and the President. NNSA's need to continue
operating LANL arises from its obligation to ensure a safe and reliable
nuclear weapons stockpile. LANL is also needed to support other Federal
agencies, including the Department of Homeland Security. The Final
SWEIS analyzed the environmental impacts of operating LANL at different
levels. LANL is located in north-central New Mexico and covers an area
of about 40 square miles (104 square kilometers). It was established in
1943 as ``Project Y'' of the Manhattan Project with a single mission--
to build the world's first nuclear weapons. After World War II ended,
Project Y was designated a permanent research and development
laboratory and its work was expanded to incorporate a wide variety of
assignments in support of other government and civilian programs. LANL
is now a multi-disciplinary, multipurpose institution engaged in
theoretical and experimental research and development.
DOE issued a Final SWEIS and Record of Decision in 1999 for the
continued operation of the laboratory. DOE regulations implementing
NEPA require the evaluation of site-wide NEPA analyses every five years
to determine their continued applicability; such a five-year evaluation
was initiated for the 1999 SWEIS in 2004, and NNSA subsequently decided
to prepare a new SWEIS. A new Draft SWEIS was issued in July 2006 for
public review and comment over a 75-day period. NNSA considered the
comments received on
[[Page 28454]]
the Draft SWEIS in preparing the Final SWEIS.
The alternatives evaluated in the Final SWEIS represent a range of
operational levels from the minimal reasonable activity levels (Reduced
Operations Alternative) to the highest reasonable activity levels that
could be supported by current facilities combined with expansion and
construction of new facilities (Expanded Operations Alternative). The
No Action Alternative would continue current mission support work at
LANL and includes actions, facility construction, and other activities
for which NEPA analyses have already been completed. All alternatives
assumed that NNSA will continue to operate LANL as a national security
laboratory for the foreseeable future.
Subsequent Document Preparation: NNSA will consider the
environmental impact analysis presented in the Final LANL SWEIS, along
with other information, in making decisions regarding the continued
operation of LANL. NNSA will wait to issue a ROD for at least 30 days
following publication in the Federal Register of this notice of
availability. It is anticipated that several RODs may be issued based
on the Final SWEIS over the next several years. NNSA will publish all
RODs in the Federal Register.
Signed in Washington, DC, this 4th day of April, 2008.
Thomas P. D'Agostino,
Administrator, National Nuclear Security Administration.
[FR Doc. E8-11007 Filed 5-15-08; 8:45 am]
BILLING CODE 6450-01-P