Combined Notice of Filings #1, 28444-28446 [E8-10999]

Download as PDF 28444 Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices Issue Scoping Document 1 for comments—June 2008. Request Additional Information—July 2008. Issue Scoping Document 2—August 2008. Notice of application is ready for environmental analysis—October 2008. Notice of the availability of the draft EA—April 2009. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E8–10957 Filed 5–15–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP06–9–001] Florida Gas Transmission Company, LLC; Notice of Application To Amend Authorization sroberts on PROD1PC70 with NOTICES May 8, 2008. Take notice that on May 2, 2008, Florida Gas Transmission Company, LLC (FGT), 5444 Westheimer Road, Houston, Texas 77056, filed in Docket No. CP06–9–001, an application, pursuant to section 7 of the Natural Gas Act (NGA), for an order amending its authorization granted by the Commission in Docket No. CP06–9–000 on May 30, 2006 in order to continue the existing certificate authority for its 18-inch and 24-inch pipelines located in Broward County, Florida and hold in abeyance the abandonment authority for these facilities until newly identified conflicts with planned construction by the Florida Department of Transportation/Florida Turnpike Enterprise are resolved, or for a period not to exceed 36 months, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing is accessible on-line at https:// www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate Aug<31>2005 16:18 May 15, 2008 Jkt 214001 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Any questions regarding this application should be directed to Michael T. Langston, Senior Vice President of Government and Regulatory Affairs, Florida Gas Transmission Company, LLC, 5444 Westheimer Road, Houston, Texas 77056 at (713) 989– 7610. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: May 29, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–10965 Filed 5–15–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 May 1, 2008. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC08–83–000. Applicants: Iberdrola Renewables, Inc., PPM Wind Energy LLC, Aeolus Wind Power IV LLC, Klondike Wind Power III LLC. Description: Application for Order Under Section 203 of the FPA Authorizing Disposition of Jurisdictional Facilities, and Request for Waivers, Confidential Treatment of Transaction Document and 21-Day Comment Period. Filed Date: 04/30/2008. Accession Number: 20080430–5245. Comment Date: 5 p.m. Eastern Time on Wednesday, May 21, 2008. E:\FR\FM\16MYN1.SGM 16MYN1 sroberts on PROD1PC70 with NOTICES Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices Take notice that the Commission received the following electric rate filings: Docket Numbers: ER98–1466–005; ER00–814–006; ER00–2924–006; ER02– 1638–005. Applicants: Allegheny Power; Allegheny Energy Supply Company; Green Valley Hydro, LLC; Buchanan Generation, LLC. Description: Allegheny Power submits a Supplemental Affidavit of Julie R Solomon re their combined triennial market power analysis submitted on 1/ 14/08. Filed Date: 04/21/2008. Accession Number: 20080430–0200. Comment Date: 5 p.m. Eastern Time on Tuesday, May 6, 2008. Docket Numbers: ER98–4421–008; ER98–4421–009; ER04–543–004; ER04– 543–005; ER99–791–006; ER99–791– 005; ER99–3677–007; ER99–3677–008; ER01–570–008; ER01–570–009; ER00– 2187–003; ER99–806–005; ER99–806– 006; ER00–2187–004. Applicants: Consumers Energy Company; CMS Energy Resource Management Company; Grayling Generating Station L.P.; CMS Generation Michigan Power, L.L.C.; Dearborn Industrial Generation, L.L.C.; CMS Distributed Power, L.L.C.; Genesee Power Station, LP. Description: Consumers Energy Company et al submit a notice of nonmaterial change in status and Original Sheet 1 et al to FERC Electric Tariff, Third Revised Volume 8. Filed Date: 04/23/2008. Accession Number: 20080429–0073. Comment Date: 5 p.m. Eastern Time on Wednesday, May 14, 2008. Docket Numbers: ER05–1089–004; ER06–1027–001; EL05–136–002. Applicants: Wisconsin Public Service Corporation. Description: Algoma Group et al submits an amended Stipulation to the Stipulation filed on 9/20/07. Filed Date: 04/24/2008. Accession Number: 20080430–0164. Comment Date: 5 p.m. Eastern Time on Thursday, May 8, 2008. Docket Numbers: ER08–676–000. Applicants: Winnebago Windpower LLC. Description: Winnebago Windpower LLC requests to withdraw their application for order accepting initial tariff, providing for shortened comment period, waiving regulations, and granting blanket approvals which was filed on 3/17/08. Filed Date: 04/28/2008. Accession Number: 20080429–0207. Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008. VerDate Aug<31>2005 16:18 May 15, 2008 Jkt 214001 Docket Numbers: ER08–765–001. Applicants: KD Power Marketing Services, LLC. Description: KD Power Marketing Services LLC submits an amended application for market-based rate authority. Filed Date: 04/28/2008. Accession Number: 20080430–0035. Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008. Docket Numbers: ER08–867–000. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc submits an Agreement to Amend Joint Operating Agreement Among with PJM Interconnection, LLC etc. Filed Date: 04/23/2008. Accession Number: 20080428–0114. Comment Date: 5 p.m. Eastern Time on Wednesday, May 14, 2008. Docket Numbers: ER08–876–000. Applicants: Wisconsin Public Service Corporation. Description: Wisconsin Public Service Corporation submits an executed BackUp Service Agreement with Eagle River Light and Water Commission designated as Rate Schedule FERC 82, effective 4/ 22/08. Filed Date: 04/28/2008. Accession Number: 20080430–0037. Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008. Docket Numbers: ER08–877–000. Applicants: Southern California Edison Company. Description: Southern California Edison Company submits a Notice of Cancellation of the Firm Transmission Service Agreement with the City of Vernon. Filed Date: 04/28/2008. Accession Number: 20080430–0038. Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008. Docket Numbers: ER08–878–000. Applicants: Wisconsin Power and Light Company. Description: Wisconsin Power and Light Power Company et al submits the proposed Balancing Area Operations Coordination Agreement designated as Rate Schedule FERC 500 etc, effective 6/ 27/08. Filed Date: 04/28/2008. Accession Number: 20080430–0036. Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008. Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA08–112–000. Applicants: Idaho Power Company. Description: Idaho Power Co submits compliance filing proposing to amend PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 28445 its Open Access Transmission Tariff to include a methodology for distributing penalty revenues associated with Imbalance Penalties, Late Study Penalties etc. Filed Date: 04/21/2008. Accession Number: 20080424–0125. Comment Date: 5 p.m. Eastern Time on Monday, May 12, 2008. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov or call E:\FR\FM\16MYN1.SGM 16MYN1 28446 Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–10999 Filed 5–15–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4656–020] Boise-Kuna Irrigation District, Nampa & Meridian Irrigation District, New York; Irrigation District, Wilder Irrigation District, and Big Bend Irrigation District; Notice of Availability of Environmental Assessment sroberts on PROD1PC70 with NOTICES May 9, 2008. An environmental assessment (EA) is available for public review. The EA was prepared for an application filed by Boise-Kuna Irrigation District, et al. (licensee) on August 1, 2007, requesting Commission approval of: (1) An extension of time for the commencement of project construction to December 13, 2009, pursuant to Public Law 109–383; (2) changes to dates or time periods specified in license articles relating to actions that would be affected by an amendment; and (3) amendments to project design. The licensee proposes to install two 7.5megawatt (MW) generating units with a total installed capacity of 15 MW, instead of two, 30–MW generating units with a total installed capacity of 60 MW, as authorized in the March 27, 1989 Order Issuing License. The licensee also proposes to decrease the length of the licensed project’s transmission line. Finally, the licensee requests deletion or revision of certain license articles that are related to the proposed design changes. The project would be located at the U.S. Bureau of Reclamation’s (Reclamation) existing Arrowrock Dam on the Boise River, in Elmore and Ada Counties, Idaho. Parts of the project would occupy lands managed by Reclamation, the U.S. Corps of Engineers, and the U.S. Forest Service within Boise National Forest. The EA concludes that the proposed amendment, with staff-recommended mitigation measures, would not constitute a major federal action significantly affecting the quality of the human environment. Any comments should be filed within 30 days from the date of this notice and should be addressed to Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First VerDate Aug<31>2005 16:18 May 15, 2008 Jkt 214001 Street, NE., Washington, DC 20426. A copy of the EA is available for review at the Commission in the Public Reference Room, or it may be viewed on the Commission’s Web site at https:// www.ferc.gov using the e-Library link. Enter the docket number ‘‘P–4656’’ in the docket number field to access the document. For assistance, call (202) 502–8222 or (202) 502–8659 (for TTY). For further information regarding this notice, please contact B. Peter Yarrington at (202) 502–6129. Kimberly D. Bose, Secretary. [FR Doc. E8–11027 Filed 5–15–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP08–32–000] Natural Gas Pipeline Company of America; Notice of Availability of the Environmental Assessment for the Proposed Herscher-Galesville Expansion Project May 9, 2008. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the natural gas pipeline facilities proposed by Natural Gas Pipeline Company of America (Natural) in the abovereferenced docket. The EA was prepared to satisfy the requirements of the National Environmental Policy Act (NEPA) of 1969. The staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major Federal action significantly affecting the quality of the human environment. The EA assesses the potential environmental effects of the construction and operation of the proposed project. Natural proposes to add new and modify existing natural gas storage field facilities, and add compression to Compressor Station 201, at its existing Herscher-Galesville Gas Storage Field in Kankakee County, just south of the Town of Herscher, Illinois. Specifically, the project would include: • Construction of 15 new water withdrawal wells with pumps; • Construction of 11 new water disposal wells; • Construction of three booster pumps at existing water disposal wells; • Up to four lateral recompletions at existing water disposal wells; PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 • Construction of workover/ extensions on five existing gas withdrawal/injection wells; • Construction of a new 8,180 horsepower (hp) gas-fired engine compressor unit within Compressor Station 201; and • Replacement, looping or extension of 12 waterlines with 8- to 13-inchdiameter plastic pipelines. The purpose of this project is to increase the Herscher-Galesville Gas Storage Field’s working gas capacity by 10 billion cubic feet and increase the peak day withdrawal capacity. Natural would achieve this increased capacity by constructing facilities to remove water from the field. Reworking of five existing gas withdrawal/injection wells, and construction of the new compressor unit within its existing adjacent Compressor Station 201, would enable Natural to increase peak day withdrawal capacity. The EA has been placed in the public files of the FERC. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 502–8371. Copies of the EA have been mailed to Federal, state and local agencies, public interest groups, interested individuals, newspapers, and parties to this proceeding. Any person wishing to comment on the EA may do so. To ensure consideration prior to a Commission decision on the proposal, it is important that we receive your comments before the date specified below. Please note that the Commission strongly encourages electronic filing of any comments or interventions or protests to this proceeding. See 18 Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on the Commission’s Internet Web site at https://www.ferc.gov under the link to ‘‘Documents and Filings’’ and ‘‘eFiling.’’ eFiling is a file attachment process and requires that you prepare your submission in the same manner as you would if filing on paper, and save it to a file on your hard drive. New eFiling users must first create an account by clicking on ‘‘Sign up’’ or ‘‘eRegister.’’ You will be asked to select the type of filing you are making. This filing is considered a ‘‘Comment on Filing.’’ In addition, there is a ‘‘Quick Comment’’ option available, which is an easy method for interested persons to submit text only comments on a project. The Quick-Comment User Guide can be viewed at https://www.ferc.gov/docsfiling/efiling/quick-comment-guide.pdf. E:\FR\FM\16MYN1.SGM 16MYN1

Agencies

[Federal Register Volume 73, Number 96 (Friday, May 16, 2008)]
[Notices]
[Pages 28444-28446]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10999]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

May 1, 2008.
    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC08-83-000.
    Applicants: Iberdrola Renewables, Inc., PPM Wind Energy LLC, Aeolus 
Wind Power IV LLC, Klondike Wind Power III LLC.
    Description: Application for Order Under Section 203 of the FPA 
Authorizing Disposition of Jurisdictional Facilities, and Request for 
Waivers, Confidential Treatment of Transaction Document and 21-Day 
Comment Period.
    Filed Date: 04/30/2008.
    Accession Number: 20080430-5245.
    Comment Date: 5 p.m. Eastern Time on Wednesday, May 21, 2008.


[[Page 28445]]


    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER98-1466-005; ER00-814-006; ER00-2924-006; ER02-
1638-005.
    Applicants: Allegheny Power; Allegheny Energy Supply Company; Green 
Valley Hydro, LLC; Buchanan Generation, LLC.
    Description: Allegheny Power submits a Supplemental Affidavit of 
Julie R Solomon re their combined triennial market power analysis 
submitted on 1/14/08.
    Filed Date: 04/21/2008.
    Accession Number: 20080430-0200.
    Comment Date: 5 p.m. Eastern Time on Tuesday, May 6, 2008.

    Docket Numbers: ER98-4421-008; ER98-4421-009; ER04-543-004; ER04-
543-005; ER99-791-006; ER99-791-005; ER99-3677-007; ER99-3677-008; 
ER01-570-008; ER01-570-009; ER00-2187-003; ER99-806-005; ER99-806-006; 
ER00-2187-004.
    Applicants: Consumers Energy Company; CMS Energy Resource 
Management Company; Grayling Generating Station L.P.; CMS Generation 
Michigan Power, L.L.C.; Dearborn Industrial Generation, L.L.C.; CMS 
Distributed Power, L.L.C.; Genesee Power Station, LP.
    Description: Consumers Energy Company et al submit a notice of non-
material change in status and Original Sheet 1 et al to FERC Electric 
Tariff, Third Revised Volume 8.
    Filed Date: 04/23/2008.
    Accession Number: 20080429-0073.
    Comment Date: 5 p.m. Eastern Time on Wednesday, May 14, 2008.

    Docket Numbers: ER05-1089-004; ER06-1027-001; EL05-136-002.
    Applicants: Wisconsin Public Service Corporation.
    Description: Algoma Group et al submits an amended Stipulation to 
the Stipulation filed on 9/20/07.
    Filed Date: 04/24/2008.
    Accession Number: 20080430-0164.
    Comment Date: 5 p.m. Eastern Time on Thursday, May 8, 2008.

    Docket Numbers: ER08-676-000.
    Applicants: Winnebago Windpower LLC.
    Description: Winnebago Windpower LLC requests to withdraw their 
application for order accepting initial tariff, providing for shortened 
comment period, waiving regulations, and granting blanket approvals 
which was filed on 3/17/08.
    Filed Date: 04/28/2008.
    Accession Number: 20080429-0207.
    Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008.

    Docket Numbers: ER08-765-001.
    Applicants: KD Power Marketing Services, LLC.
    Description: KD Power Marketing Services LLC submits an amended 
application for market-based rate authority.
    Filed Date: 04/28/2008.
    Accession Number: 20080430-0035.
    Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008.

    Docket Numbers: ER08-867-000.
    Applicants: New York Independent System Operator, Inc.
    Description: New York Independent System Operator, Inc submits an 
Agreement to Amend Joint Operating Agreement Among with PJM 
Interconnection, LLC etc.
    Filed Date: 04/23/2008.
    Accession Number: 20080428-0114.
    Comment Date: 5 p.m. Eastern Time on Wednesday, May 14, 2008.

    Docket Numbers: ER08-876-000.
    Applicants: Wisconsin Public Service Corporation.
    Description: Wisconsin Public Service Corporation submits an 
executed Back-Up Service Agreement with Eagle River Light and Water 
Commission designated as Rate Schedule FERC 82, effective 4/22/08.
    Filed Date: 04/28/2008.
    Accession Number: 20080430-0037.
    Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008.

    Docket Numbers: ER08-877-000.
    Applicants: Southern California Edison Company.
    Description: Southern California Edison Company submits a Notice of 
Cancellation of the Firm Transmission Service Agreement with the City 
of Vernon.
    Filed Date: 04/28/2008.
    Accession Number: 20080430-0038.
    Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008.

    Docket Numbers: ER08-878-000.
    Applicants: Wisconsin Power and Light Company.
    Description: Wisconsin Power and Light Power Company et al submits 
the proposed Balancing Area Operations Coordination Agreement 
designated as Rate Schedule FERC 500 etc, effective 6/27/08.
    Filed Date: 04/28/2008.
    Accession Number: 20080430-0036.
    Comment Date: 5 p.m. Eastern Time on Monday, May 19, 2008.

    Take notice that the Commission received the following open access 
transmission tariff filings:

    Docket Numbers: OA08-112-000.
    Applicants: Idaho Power Company.
    Description: Idaho Power Co submits compliance filing proposing to 
amend its Open Access Transmission Tariff to include a methodology for 
distributing penalty revenues associated with Imbalance Penalties, Late 
Study Penalties etc.
    Filed Date: 04/21/2008.
    Accession Number: 20080424-0125.
    Comment Date: 5 p.m. Eastern Time on Monday, May 12, 2008.
    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov 
or call

[[Page 28446]]

(866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
 [FR Doc. E8-10999 Filed 5-15-08; 8:45 am]