Fire Mountain Lodge; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 28443-28444 [E8-10957]
Download as PDF
Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices
sroberts on PROD1PC70 with NOTICES
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10954 Filed 5–15–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
16:18 May 15, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1992–003]
Fire Mountain Lodge; Notice of
Application Tendered for Filing With
the Commission, Soliciting Additional
Study Requests, and Establishing
Procedural Schedule for Relicensing
and a Deadline for Submission of Final
Amendments
May 7, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Existing Minor
License.
b. Project No.: 1992–003.
c. Date Filed: April 25, 2008.
d. Applicant: Ken Willis.
e. Name of Project: Fire Mountain
Lodge.
f. Location: On Fern Spring in
Tehama County, California. The project
is located primarily on privately owned
land except for a small portion of the
dam and reservoir which is located on
U.S. Forest Service land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Ken Willis, Fire
Mountain Lodge, 43500 Highway 36,
Mill Creek, CA 96060, (530) 258–1952.
i. FERC Contact: Matt Buhyoff, (202)
502–6824 or matt.buhyoff@ferc.gov
j. Cooperating agencies: We are asking
Federal, State, local, and tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues to cooperate with us in the
preparation of the environmental
document. Agencies who would like to
request cooperating status should follow
the instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to Section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
28443
l. Deadline for filing additional study
requests and requests for cooperating
agency status: June 24, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Additional study requests and
requests for cooperating agency status
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
m. This application is not ready for
environmental analysis at this time.
n. The existing Fire Mountain Lodge
project consists of: (1) A 265-foot-long
earth and concrete filled dam; (2) a 0.24acre reservoir; (3) a 38 inch intake
tower; (4) a 1540-foot-long penstock; (7)
a powerhouse with an installed capacity
of 60-kilowatts; a (8) a 4000 foot-long
transmission line and; (9) appurtenant
facilities. The power generated by the
project is utilized for commercial and
residential purposes, solely for the
owners of Fire Mountain Lodge, a selfprovider of electricity.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the California State
Historic Preservation Officer (SHPO), as
required by § 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36, CFR, at § 800.4.
q. Procedural schedule and final
amendments: The application will be
processed according to the following
Hydro Licensing Schedule. Revisions to
the schedule will be made as
appropriate.
Issue Deficiency Letter—June 2008.
Issue Acceptance letter—June 2008.
E:\FR\FM\16MYN1.SGM
16MYN1
28444
Federal Register / Vol. 73, No. 96 / Friday, May 16, 2008 / Notices
Issue Scoping Document 1 for
comments—June 2008.
Request Additional Information—July
2008.
Issue Scoping Document 2—August
2008.
Notice of application is ready for
environmental analysis—October 2008.
Notice of the availability of the draft
EA—April 2009.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10957 Filed 5–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP06–9–001]
Florida Gas Transmission Company,
LLC; Notice of Application To Amend
Authorization
sroberts on PROD1PC70 with NOTICES
May 8, 2008.
Take notice that on May 2, 2008,
Florida Gas Transmission Company,
LLC (FGT), 5444 Westheimer Road,
Houston, Texas 77056, filed in Docket
No. CP06–9–001, an application,
pursuant to section 7 of the Natural Gas
Act (NGA), for an order amending its
authorization granted by the
Commission in Docket No. CP06–9–000
on May 30, 2006 in order to continue
the existing certificate authority for its
18-inch and 24-inch pipelines located in
Broward County, Florida and hold in
abeyance the abandonment authority for
these facilities until newly identified
conflicts with planned construction by
the Florida Department of
Transportation/Florida Turnpike
Enterprise are resolved, or for a period
not to exceed 36 months, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. This filing is
accessible on-line at https://
www.ferc.gov, using the ‘‘eLibrary’’ link
and is available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email notification when a document is
added to a subscribed docket(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov, or call
VerDate Aug<31>2005
16:18 May 15, 2008
Jkt 214001
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Any questions regarding this
application should be directed to
Michael T. Langston, Senior Vice
President of Government and Regulatory
Affairs, Florida Gas Transmission
Company, LLC, 5444 Westheimer Road,
Houston, Texas 77056 at (713) 989–
7610.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: May 29, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10965 Filed 5–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
May 1, 2008.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC08–83–000.
Applicants: Iberdrola Renewables,
Inc., PPM Wind Energy LLC, Aeolus
Wind Power IV LLC, Klondike Wind
Power III LLC.
Description: Application for Order
Under Section 203 of the FPA
Authorizing Disposition of
Jurisdictional Facilities, and Request for
Waivers, Confidential Treatment of
Transaction Document and 21-Day
Comment Period.
Filed Date: 04/30/2008.
Accession Number: 20080430–5245.
Comment Date: 5 p.m. Eastern Time
on Wednesday, May 21, 2008.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 73, Number 96 (Friday, May 16, 2008)]
[Notices]
[Pages 28443-28444]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10957]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1992-003]
Fire Mountain Lodge; Notice of Application Tendered for Filing
With the Commission, Soliciting Additional Study Requests, and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
May 7, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Existing Minor License.
b. Project No.: 1992-003.
c. Date Filed: April 25, 2008.
d. Applicant: Ken Willis.
e. Name of Project: Fire Mountain Lodge.
f. Location: On Fern Spring in Tehama County, California. The
project is located primarily on privately owned land except for a small
portion of the dam and reservoir which is located on U.S. Forest
Service land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Ken Willis, Fire Mountain Lodge, 43500
Highway 36, Mill Creek, CA 96060, (530) 258-1952.
i. FERC Contact: Matt Buhyoff, (202) 502-6824 or
matt.buhyoff@ferc.gov
j. Cooperating agencies: We are asking Federal, State, local, and
tribal agencies with jurisdiction and/or special expertise with respect
to environmental issues to cooperate with us in the preparation of the
environmental document. Agencies who would like to request cooperating
status should follow the instructions for filing such requests
described in item l below. Cooperating agencies should note the
Commission's policy that agencies that cooperate in the preparation of
the environmental document cannot also intervene. See, 94 FERC ] 61,076
(2001).
k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: June 24, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Additional study requests and requests for cooperating agency
status may be filed electronically via the Internet in lieu of paper.
The Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov) under the ``e-Filing'' link.
m. This application is not ready for environmental analysis at this
time.
n. The existing Fire Mountain Lodge project consists of: (1) A 265-
foot-long earth and concrete filled dam; (2) a 0.24-acre reservoir; (3)
a 38 inch intake tower; (4) a 1540-foot-long penstock; (7) a powerhouse
with an installed capacity of 60-kilowatts; a (8) a 4000 foot-long
transmission line and; (9) appurtenant facilities. The power generated
by the project is utilized for commercial and residential purposes,
solely for the owners of Fire Mountain Lodge, a self-provider of
electricity.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
p. With this notice, we are initiating consultation with the
California State Historic Preservation Officer (SHPO), as required by
Sec. 106, National Historic Preservation Act, and the regulations of
the Advisory Council on Historic Preservation, 36, CFR, at Sec. 800.4.
q. Procedural schedule and final amendments: The application will
be processed according to the following Hydro Licensing Schedule.
Revisions to the schedule will be made as appropriate.
Issue Deficiency Letter--June 2008.
Issue Acceptance letter--June 2008.
[[Page 28444]]
Issue Scoping Document 1 for comments--June 2008.
Request Additional Information--July 2008.
Issue Scoping Document 2--August 2008.
Notice of application is ready for environmental analysis--October
2008.
Notice of the availability of the draft EA--April 2009.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-10957 Filed 5-15-08; 8:45 am]
BILLING CODE 6717-01-P