Download as PDF 27744 Federal Register / Vol. 73, No. 94 / Wednesday, May 14, 2008 / Rules and Regulations DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [USCG–2008–0258] Drawbridge Operation Regulations; Charles River, Boston, MA, Larry Kessler 5K Run Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. AGENCY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Craigie Bridge across the Charles River at mile 1.0, at Boston, Massachusetts. Under this temporary deviation the bridge may remain in the closed position for one hour during a public event, the 2008 Larry Kessler 5K Run. This deviation is necessary to facilitate public safety during a public event. DATES: This deviation is effective from 10:45 a.m. through 11:45 a.m., on June 1, 2008. ADDRESSES: Documents indicated in this preamble as being available in the docket are part of docket USCG–2008– 0258 and are available online at https:// www.regulations.gov. They are also available for inspection or copying at two locations: the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays, and the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First Coast Guard District, at (617) 223–8364. SUPPLEMENTARY INFORMATION: The Craigie Bridge, across the Charles River at mile 1.0, at Boston, Massachusetts, has a vertical clearance in the closed position of 13.5 feet at normal pool elevation above the Charles River Dam. The existing drawbridge operation regulation is listed at 33 CFR 117.591(e). The waterway is predominantly a recreational waterway supporting various size vessels. The facilities were notified regarding this closure and no objections were received. The owner of the bridge, the Department of Conservation and rfrederick on PROD1PC67 with RULES SUMMARY: VerDate Aug<31>2005 14:57 May 13, 2008 Jkt 214001 Recreation (DCR), requested a temporary deviation to facilitate public safety during a public event, the 2008 Larry Kessler 5K Run. Under this temporary deviation, in effect from 10:45 a.m. through 11:45 a.m. on June 1, 2008, the Craigie Bridge at mile 1.0, across the Charles River at Boston, Massachusetts, may remain in the closed position. Vessels that can pass under the bridge without a bridge opening may do so at all times. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 6, 2008. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. E8–10709 Filed 5–13–08; 8:45 am] BILLING CODE 4910–15–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [USCG–2008–0319] Drawbridge Operation Regulations; Charles River, Boston, MA, Fourth of July Fireworks Celebration Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: SUMMARY: The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Craigie Bridge across the Charles River at mile 1.0, at Boston, Massachusetts. Under this temporary deviation the bridge may remain in the closed position for two hours to facilitate a public event, the Boston Fourth of July Fireworks Celebration. This deviation is necessary to facilitate public safety during a public event. DATES: This deviation is effective from 11 p.m. on July 4, 2008 through 1 a.m. on July 5, 2008. ADDRESSES: Documents indicated in this preamble as being available in the docket are part of docket USCG–2008– 0319 and are available online at https:// www.regulations.gov. They are also available for inspection or copying at two locations: The Docket Management Facility (M–30), U.S. Department of PO 00000 Frm 00024 Fmt 4700 Sfmt 4700 Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays, and the First Coast Guard District, Bridge Branch Office, 408 Atlantic Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday through Friday, except Federal holidays. John McDonald, Project Officer, First Coast Guard District, at (617) 223–8364. FOR FURTHER INFORMATION CONTACT: The Craigie Bridge, across the Charles River at mile 1.0, at Boston, Massachusetts, has a vertical clearance in the closed position of 13.5 feet at normal pool elevation above the Charles River Dam. The existing drawbridge operation regulation is listed at 33 CFR 117.591(e). The waterway is predominantly a recreational waterway supporting various size vessels. The facilities were notified regarding this closure and no objections were received. The owner of the bridge, the Department of Conservation and Recreation (DCR), requested a temporary deviation to facilitate public safety during a public event, the Boston Fourth of July Celebration. Under this temporary deviation, in effect from 11 p.m. on July 4, 2008 through 1 a.m. on July 5, 2008, the Craigie Bridge at mile 1.0, across the Charles River at Boston, Massachusetts, may remain in the closed position. Vessels that can pass under the bridge without a bridge opening may do so at all times. In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. SUPPLEMENTARY INFORMATION: Dated: May 6, 2008. Gary Kassof, Bridge Program Manager, First Coast Guard District. [FR Doc. E8–10708 Filed 5–13–08; 8:45 am] BILLING CODE 4910–15–P E:\FR\FM\14MYR1.SGM 14MYR1

Agencies

[Federal Register Volume 73, Number 94 (Wednesday, May 14, 2008)]
[Rules and Regulations]
[Page 27744]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10709]



[[Page 27744]]

=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[USCG-2008-0258]


Drawbridge Operation Regulations; Charles River, Boston, MA, 
Larry Kessler 5K Run

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, First Coast Guard District, has issued a 
temporary deviation from the regulation governing the operation of the 
Craigie Bridge across the Charles River at mile 1.0, at Boston, 
Massachusetts. Under this temporary deviation the bridge may remain in 
the closed position for one hour during a public event, the 2008 Larry 
Kessler 5K Run. This deviation is necessary to facilitate public safety 
during a public event.

DATES: This deviation is effective from 10:45 a.m. through 11:45 a.m., 
on June 1, 2008.

ADDRESSES: Documents indicated in this preamble as being available in 
the docket are part of docket USCG-2008-0258 and are available online 
at https://www.regulations.gov. They are also available for inspection 
or copying at two locations: the Docket Management Facility (M-30), 
U.S. Department of Transportation, West Building Ground Floor, Room 
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 
a.m. and 5 p.m., Monday through Friday, except Federal holidays, and 
the First Coast Guard District, Bridge Branch Office, 408 Atlantic 
Avenue, Boston, Massachusetts 02110, between 7 a.m. and 3 p.m., Monday 
through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: John McDonald, Project Officer, First 
Coast Guard District, at (617) 223-8364.

SUPPLEMENTARY INFORMATION: The Craigie Bridge, across the Charles River 
at mile 1.0, at Boston, Massachusetts, has a vertical clearance in the 
closed position of 13.5 feet at normal pool elevation above the Charles 
River Dam. The existing drawbridge operation regulation is listed at 33 
CFR 117.591(e).
    The waterway is predominantly a recreational waterway supporting 
various size vessels. The facilities were notified regarding this 
closure and no objections were received.
    The owner of the bridge, the Department of Conservation and 
Recreation (DCR), requested a temporary deviation to facilitate public 
safety during a public event, the 2008 Larry Kessler 5K Run.
    Under this temporary deviation, in effect from 10:45 a.m. through 
11:45 a.m. on June 1, 2008, the Craigie Bridge at mile 1.0, across the 
Charles River at Boston, Massachusetts, may remain in the closed 
position.
    Vessels that can pass under the bridge without a bridge opening may 
do so at all times.
    In accordance with 33 CFR 117.35(e), the bridge must return to its 
regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: May 6, 2008.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E8-10709 Filed 5-13-08; 8:45 am]
BILLING CODE 4910-15-P