Federal Register / Vol. 73, No. 92 / Monday, May 12, 2008 / Notices
j. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
k. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
l. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
m. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
VerDate Aug<31>2005
17:54 May 09, 2008
Jkt 214001
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
26979
[Docket No. CP08–100–000]
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Texas Eastern Transmission, LP
(Texas Eastern) involving construction
and operation of facilities by Texas
Eastern Richhill Township, Greene
County and Uniontown Township,
Fayette County, Pennsylvania.
This notice announces the opening of
the scoping process we will use to
gather input from the public and
interested agencies on the project. Your
input will help the Commission staff
determine which issues need to be
evaluated in the EA. Please note that the
scoping period will close on June 4,
2008.
This notice is being sent to affected
landowners; federal, state, and local
government representatives and
agencies; environmental and public
interest groups; Native American tribes;
other interested parties in this
proceeding; and local libraries and
newspapers. We encourage government
representatives to notify their
constituents of this planned project and
encourage them to comment on their
areas of concern.
If you are a landowner receiving this
notice, you may be contacted by a
pipeline company representative about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The pipeline
company would seek to negotiate a
mutually acceptable agreement.
However, if the project is approved by
the Commission, that approval conveys
with it the right of eminent domain.
Therefore, if easement negotiations fail
to produce an agreement, the pipeline
company could initiate condemnation
proceedings in accordance with state
law.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ was attached to the project
notice BBS provided to landowners.
This fact sheet addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
Texas Eastern Transmission, LP;
Notice of Intent To Prepare An
Environmental Assessment for the
Proposed; Northern Bridge Project and
Request for Comments on
Environmental Issues
Summary of the Proposed Project
The proposed project would involve
modifications of the Holbrook
Compressor Station (Holbrook CS) and
the Uniontown Compressor Stations
(Uniontown CS) as described below.
May 5, 2008.
Holbrook CS
The Holbrook CS is an existing
facility located in Rich Hill Township,
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10457 Filed 5–9–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
The staff of the Federal Energy
Regulatory Commission (FERC or
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
E:\FR\FM\12MYN1.SGM
12MYN1
26980
Federal Register / Vol. 73, No. 92 / Monday, May 12, 2008 / Notices
Greene County, Pennsylvania. The
entire compressor station site is 47.0
acres and is surrounded by the Ryerson
Station State Park. The station has been
in operation since the mid 1950’s, and
since that time no issues with
surrounding landowners have occurred.
The proposed Holbrook CS consists of
three main components: (1) The
installation of a new Solar Mars 100
13,333 horsepower (hp) turbine-driven
centrifugal compressor package; (2) the
uprate of an existing Solar Mars 100
unit, resulting in a 1,083 hp increase;
and (3) the abandonment of four
existing reciprocating gas compressor
units, resulting in a 5,400 hp reduction.
The new compressor unit will include
a new compressor building and all
necessary support infrastructure. The
project components are detailed below.
• New 36-inch suction and 30-inch
discharge tie-ins to the existing Texas
Eastern pipeline(s)
• Install new suction scrubber
• Install one new Solar Mars 100
13,333 hp turbine driven centrifugal
compressor
• Horsepower upgrade of an existing
turbine compressor
• Install station emergency shutdown
(ESD) system with blow-down
• Install one ventilated Compressor
Building
• Install new electrical equipment
building
• Install skid Auxiliary Building
• Tie-into the existing source control
and recovery system
• Develop site including site grading,
foundations, paving, yard stone,
fencing, and access road to the new
building
• Install 129 volts direct current
uninterruptible power supply system
• Install Fire and Gas detection
system in the Compressor Building
• Install facility security system(s)
• Install underground pipe cathodic
protection system
• Abandon four existing GMV–10S
reciprocating gas compressor units
(5,400 hp reduction)
• Isolate aboveground components of
the abandoned units
• All suction, discharge and fuel gas
lines will be isolated
rwilkins on PROD1PC63 with NOTICES
Uniontown CS
The Uniontown CS is an existing
facility located in Fayette County,
Pennsylvania. This station includes the
uprate of an existing Solar Mars 100
compressor unit, resulting in an
increase of 1,650 hp of compression.
The uprate at Uniontown will not
involve the modification of any facilities
at Uniontown or cause any earth
disturbance.
VerDate Aug<31>2005
17:54 May 09, 2008
Jkt 214001
The location of the project facilities is
shown in Appendix 1.1
Nonjurisdictional Facilities
There are no non-jurisdictional
facilities associated with this project.
Land Requirements for Construction
Construction of the proposed facilities
would require about 4.6 acres of land at
the Holbrook CS. Following
construction, about 0.3 would be
maintained as new aboveground facility
sites and pipeline right-of-way. The
remaining 4.3 acres of land would be
restored and allowed to revert to its
former use on the existing compressor
station property. The work proposed for
the Uniontown CS would not involve
any new land disturbance because the
modifications would be done within the
existing compressor building.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, the Commission staff
requests public comments on the scope
of the issues to address in the EA. All
comments received are considered
during the preparation of the EA. State
and local government representatives
are encouraged to notify their
constituents of this proposed action and
encourage them to comment on their
areas of concern.
In the EA we 2 will discuss impacts
that could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils
• Land use
• Water resources, fisheries, and
wetlands
• Cultural resources
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices, other than Appendix 1 (maps), are
available on the Commission’s Web site at the
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, NE., Washington,
DC 20426, or call (202) 502–8371. For instructions
on connecting to eLibrary refer to the last page of
this notice. Copies of the appendices were sent to
all those receiving this notice in the mail.
2 ‘‘We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the Office of Energy Projects
(OEP).
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
• Vegetation and wildlife
• Air quality and noise
• Endangered and threatened species
• Hazardous waste
• Public safety
We will also evaluate possible
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the public participation
section below.
Currently Identified Environmental
Issues
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
Texas Eastern This preliminary list of
issues may be changed based on your
comments and our analysis.
• Cultural resources may be affected
by the project.
• The project may have air emissions
and noise impacts.
• The Holbrook CS may have changed
visual impacts.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the
EA/EIS and considered by the
Commission. You should focus on the
potential environmental effects of the
proposal, alternatives to the proposal
(including alternative locations/routes),
and measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
E:\FR\FM\12MYN1.SGM
12MYN1
Federal Register / Vol. 73, No. 92 / Monday, May 12, 2008 / Notices
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 2.
• Reference Docket No. CP07–451–
000.
• Mail your comments so that they
will be received in Washington, DC on
or before June 4, 2008.
The Commission encourages
electronic filing of comments. See 18
Code of Federal Regulations
385.2001(a)(1)(iii) and the instructions
on the Commission’s Internet Web site
at https://www.ferc.gov under the link to
‘‘Documents and Filings’’ and ‘‘eFiling.’’
eFiling is a file attachment process and
requires that you prepare your
submission in the same manner as you
would if filing on paper, and save it to
a file on your hard drive. New eFiling
users must first create an account by
clicking on ‘‘Sign up’’ or ‘‘eRegister.’’
You will be asked to select the type of
filing you are making. This filing is
considered a ‘‘Comment on Filing.’’ In
addition, there is a ‘‘Quick Comment’’
option available, which is an easy
method for interested persons to submit
text only comments on a project. The
Quick-Comment User Guide can be
viewed at https://www.ferc.gov/docsfiling/efiling/quick-comment-guide.pdf.
Quick Comment does not require a
FERC eRegistration account; however,
you will be asked to provide a valid email address. All comments submitted
under either eFiling or the Quick
Comment option are placed in the
public record for the specified docket or
project number(s). Comments submitted
electronically must be submitted by
June 4, 2008.
rwilkins on PROD1PC63 with NOTICES
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who are potential right-ofway grantors, whose property may be
used temporarily for project purposes,
or who own homes within distances
defined in the Commission’s regulations
of certain aboveground facilities. By this
notice we are also asking governmental
agencies, especially those in Appendix
2, to express their interest in becoming
cooperating agencies for the preparation
of the EA.
If you do not want to send comments
at this time but still want to remain on
our mailing list, please return the
Information Request (Appendix 3). If
you do not return the Information
Request, you will be taken off the
mailing list.
VerDate Aug<31>2005
17:54 May 09, 2008
Jkt 214001
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor.’’
Intervenors play a more formal role in
the process. Among other things,
intervenors have the right to receive
copies of case-related Commission
documents and filings by other
intervenors. Likewise, each intervenor
must send one electronic copy (using
the Commission’s eFiling system) or 14
paper copies of its filings to the
Secretary of the Commission and must
send a copy of its filings to all other
parties on the Commission’s service list
for this proceeding.
If you want to become an intervenor
you must file a motion to intervene
according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Only
intervenors have the right to seek
rehearing of the Commission’s decision.
The Notice of Application for this
proposed project issued on April 15,
2008 identified the date for the filing of
interventions as April 30, 2008.
However, affected landowners and
parties with environmental concerns
may be granted late intervenor status
upon showing good cause by stating that
they have a clear and direct interest in
this proceeding which would not be
adequately represented by any other
parties. You do not need intervenor
status to have your environmental
comments considered.
Availability of Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202)502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
26981
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10459 Filed 5–9–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12966–001]
Lake Powell Hydroelectric System;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, Commencement of
Licensing Proceeding, and Scoping;
Request for Comments on the Pad and
Scoping Document, and Identification
of Issues and Associated Study
Requests
May 5, 2008.
a. Type of Filing: Notice of Intent to
File License Application for an Original
License and Commencing Licensing
Proceeding.
b. Project No.: 12966–001.
c. Dated Filed: March 3, 2008.
d. Submitted By: Utah Board of
Natural Resources.
e. Name of Project: Lake Powell
Hydroelectric System.
f. Location: On federal, state, and
private lands in Kane, Washington and
Iron counties, Utah; and in Coconino
and Mohave counties, Arizona.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Applicant Contact: Eric Millis, P.E.,
Utah Division of Water Resources, 1594
W. North Temple, P.O. Box 14620, Salt
Lake City, UT 84118–6201, 801–538–
7235.
i. FERC Contact: Jim Fargo at 202–
502–6095 or e-mail at
james.fargo@ferc.gov.
j. We are asking federal, state, local,
and tribal agencies with jurisdiction
and/or special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in paragraph o
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of the environmental
E:\FR\FM\12MYN1.SGM
12MYN1
Agencies
[Federal Register Volume 73, Number 92 (Monday, May 12, 2008)]
[Notices]
[Pages 26979-26981]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10459]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-100-000]
Texas Eastern Transmission, LP; Notice of Intent To Prepare An
Environmental Assessment for the Proposed; Northern Bridge Project and
Request for Comments on Environmental Issues
May 5, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Texas Eastern Transmission, LP
(Texas Eastern) involving construction and operation of facilities by
Texas Eastern Richhill Township, Greene County and Uniontown Township,
Fayette County, Pennsylvania.
This notice announces the opening of the scoping process we will
use to gather input from the public and interested agencies on the
project. Your input will help the Commission staff determine which
issues need to be evaluated in the EA. Please note that the scoping
period will close on June 4, 2008.
This notice is being sent to affected landowners; federal, state,
and local government representatives and agencies; environmental and
public interest groups; Native American tribes; other interested
parties in this proceeding; and local libraries and newspapers. We
encourage government representatives to notify their constituents of
this planned project and encourage them to comment on their areas of
concern.
If you are a landowner receiving this notice, you may be contacted
by a pipeline company representative about the acquisition of an
easement to construct, operate, and maintain the proposed facilities.
The pipeline company would seek to negotiate a mutually acceptable
agreement. However, if the project is approved by the Commission, that
approval conveys with it the right of eminent domain. Therefore, if
easement negotiations fail to produce an agreement, the pipeline
company could initiate condemnation proceedings in accordance with
state law.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' was attached to the
project notice BBS provided to landowners. This fact sheet addresses a
number of typically asked questions, including the use of eminent
domain and how to participate in the Commission's proceedings. It is
available for viewing on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
The proposed project would involve modifications of the Holbrook
Compressor Station (Holbrook CS) and the Uniontown Compressor Stations
(Uniontown CS) as described below.
Holbrook CS
The Holbrook CS is an existing facility located in Rich Hill
Township,
[[Page 26980]]
Greene County, Pennsylvania. The entire compressor station site is 47.0
acres and is surrounded by the Ryerson Station State Park. The station
has been in operation since the mid 1950's, and since that time no
issues with surrounding landowners have occurred. The proposed Holbrook
CS consists of three main components: (1) The installation of a new
Solar Mars 100 13,333 horsepower (hp) turbine-driven centrifugal
compressor package; (2) the uprate of an existing Solar Mars 100 unit,
resulting in a 1,083 hp increase; and (3) the abandonment of four
existing reciprocating gas compressor units, resulting in a 5,400 hp
reduction. The new compressor unit will include a new compressor
building and all necessary support infrastructure. The project
components are detailed below.
New 36-inch suction and 30-inch discharge tie-ins to the
existing Texas Eastern pipeline(s)
Install new suction scrubber
Install one new Solar Mars 100 13,333 hp turbine driven
centrifugal compressor
Horsepower upgrade of an existing turbine compressor
Install station emergency shutdown (ESD) system with blow-
down
Install one ventilated Compressor Building
Install new electrical equipment building
Install skid Auxiliary Building
Tie-into the existing source control and recovery system
Develop site including site grading, foundations, paving,
yard stone, fencing, and access road to the new building
Install 129 volts direct current uninterruptible power
supply system
Install Fire and Gas detection system in the Compressor
Building
Install facility security system(s)
Install underground pipe cathodic protection system
Abandon four existing GMV-10S reciprocating gas compressor
units (5,400 hp reduction)
Isolate aboveground components of the abandoned units
All suction, discharge and fuel gas lines will be isolated
Uniontown CS
The Uniontown CS is an existing facility located in Fayette County,
Pennsylvania. This station includes the uprate of an existing Solar
Mars 100 compressor unit, resulting in an increase of 1,650 hp of
compression. The uprate at Uniontown will not involve the modification
of any facilities at Uniontown or cause any earth disturbance.
The location of the project facilities is shown in Appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices, other
than Appendix 1 (maps), are available on the Commission's Web site
at the ``eLibrary'' link or from the Commission's Public Reference
Room, 888 First Street, NE., Washington, DC 20426, or call (202)
502-8371. For instructions on connecting to eLibrary refer to the
last page of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail.
---------------------------------------------------------------------------
Nonjurisdictional Facilities
There are no non-jurisdictional facilities associated with this
project.
Land Requirements for Construction
Construction of the proposed facilities would require about 4.6
acres of land at the Holbrook CS. Following construction, about 0.3
would be maintained as new aboveground facility sites and pipeline
right-of-way. The remaining 4.3 acres of land would be restored and
allowed to revert to its former use on the existing compressor station
property. The work proposed for the Uniontown CS would not involve any
new land disturbance because the modifications would be done within the
existing compressor building.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
This process is referred to as ``scoping.'' The main goal of the
scoping process is to focus the analysis in the EA on the important
environmental issues. By this Notice of Intent, the Commission staff
requests public comments on the scope of the issues to address in the
EA. All comments received are considered during the preparation of the
EA. State and local government representatives are encouraged to notify
their constituents of this proposed action and encourage them to
comment on their areas of concern.
In the EA we \2\ will discuss impacts that could occur as a result
of the construction and operation of the proposed project under these
general headings:
---------------------------------------------------------------------------
\2\ ``We'', ``us'', and ``our'' refer to the environmental staff
of the Office of Energy Projects (OEP).
---------------------------------------------------------------------------
Geology and soils
Land use
Water resources, fisheries, and wetlands
Cultural resources
Vegetation and wildlife
Air quality and noise
Endangered and threatened species
Hazardous waste
Public safety
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the public participation section below.
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Texas Eastern This
preliminary list of issues may be changed based on your comments and
our analysis.
Cultural resources may be affected by the project.
The project may have air emissions and noise impacts.
The Holbrook CS may have changed visual impacts.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA/EIS and considered by the
Commission. You should focus on the potential environmental effects of
the proposal, alternatives to the proposal (including alternative
locations/routes), and measures to avoid or lessen environmental
impact. The more specific your comments, the more useful they will be.
Please carefully follow these instructions to ensure that your comments
are received in time and properly recorded:
Send an original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory
[[Page 26981]]
Commission, 888 First St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas
Branch 2.
Reference Docket No. CP07-451-000.
Mail your comments so that they will be received in
Washington, DC on or before June 4, 2008.
The Commission encourages electronic filing of comments. See 18
Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on
the Commission's Internet Web site at https://www.ferc.gov under the
link to ``Documents and Filings'' and ``eFiling.'' eFiling is a file
attachment process and requires that you prepare your submission in the
same manner as you would if filing on paper, and save it to a file on
your hard drive. New eFiling users must first create an account by
clicking on ``Sign up'' or ``eRegister.'' You will be asked to select
the type of filing you are making. This filing is considered a
``Comment on Filing.'' In addition, there is a ``Quick Comment'' option
available, which is an easy method for interested persons to submit
text only comments on a project. The Quick-Comment User Guide can be
viewed at https://www.ferc.gov/docs-filing/efiling/quick-comment-
guide.pdf. Quick Comment does not require a FERC eRegistration account;
however, you will be asked to provide a valid e-mail address. All
comments submitted under either eFiling or the Quick Comment option are
placed in the public record for the specified docket or project
number(s). Comments submitted electronically must be submitted by June
4, 2008.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who are
potential right-of-way grantors, whose property may be used temporarily
for project purposes, or who own homes within distances defined in the
Commission's regulations of certain aboveground facilities. By this
notice we are also asking governmental agencies, especially those in
Appendix 2, to express their interest in becoming cooperating agencies
for the preparation of the EA.
If you do not want to send comments at this time but still want to
remain on our mailing list, please return the Information Request
(Appendix 3). If you do not return the Information Request, you will be
taken off the mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor.'' Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding.
If you want to become an intervenor you must file a motion to
intervene according to Rule 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.214). Only intervenors have the right to seek
rehearing of the Commission's decision.
The Notice of Application for this proposed project issued on April
15, 2008 identified the date for the filing of interventions as April
30, 2008. However, affected landowners and parties with environmental
concerns may be granted late intervenor status upon showing good cause
by stating that they have a clear and direct interest in this
proceeding which would not be adequately represented by any other
parties. You do not need intervenor status to have your environmental
comments considered.
Availability of Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the eLibrary link.
Click on the eLibrary link, click on ``General Search'' and enter the
docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202)502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm. Finally,
public meetings or site visits will be posted on the Commission's
calendar located at https://www.ferc.gov/EventCalendar/EventsList.aspx
along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-10459 Filed 5-9-08; 8:45 am]
BILLING CODE 6717-01-P