Warrior Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 26387-26388 [E8-10300]
Download as PDF
Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13013–000]
Warrior Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene,
Protests, and Comments
jlentini on PROD1PC65 with NOTICES
May 2, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 13013–000.
c. Date filed: September 7, 2007.
d. Applicant: Warrior Hydro, LLC.
e. Name of Project: A. I. Selden Lock
and Dam Hydroelectric Project.
f. Location: Black Warrior River in
Hale County, Alabama. It would use the
U.S. Army Corps of Engineers’ A. I.
Selden Lock and Dam.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Brent L.
Smith, COO, Symbiotics, LLC, P.O. Box
535, Rigby, ID 83442, (208) 745–0834.
i. FERC Contact: Robert Bell, (202)
502–4126.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
13013–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project using the U.S. Army
Corps of Engineers’ A. I. Selden Lock
and Dam and operated in a run-of-river
VerDate Aug<31>2005
18:01 May 08, 2008
Jkt 214001
mode would consist of: (1) A new
powerhouse and switchyard; (2) three
turbine/generator units with a combined
installed capacity of 20 megawatts; (3) a
new 3-mile-long above ground 46kilovolt transmission line extending
from the switchyard to an
interconnection point with the utility
distribution system owned by Black
Warrior Electric Membership
Corporation; and (4) appurtenant
facilities. The proposed A. I. Selden
Lock and Dam Project would have an
average annual generation of 70
gigawatt-hours.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item h
above.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
n. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
26387
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
E:\FR\FM\09MYN1.SGM
09MYN1
26388
Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10300 Filed 5–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER99–2948–012; ER00–2918–
011; ER00–2917–011; ER97–2261–022;
ER01–556–010; ER01–1654–013; ER02–
2567–011; ER02–699–005; ER04–485–008;
ER07–247–003; ER07–245–003; ER07–244–
003]
Baltimore Gas and Electric Company;
Constellation Power Source
Generation, Inc.; Calvert Cliffs Nuclear
Power Plant, Inc.; Constellation Energy
Commodities Group, Inc.; Handsome
Lake Energy, LLC; Nine Mile Point
Nuclear Station, LLC; Constellation
NewEnergy, Inc.; Constellation Energy
Commodities Group Maine, LLC; R.E.
Ginna Nuclear Power Plant, LLC;
Raven One, LLC; Raven Two, LLC;
Raven Three, LLC; Notice of Filing
May 2, 2008.
jlentini on PROD1PC65 with NOTICES
Take notice that on April 21, 2008,
the above-captioned entities (collective,
the Constellation MBR Enitities) filed
their joint market-power analysis update
for the Northeast region and certain
amendments to their market-based rate
tariffs in compliance with Order No.
697.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 12, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10294 Filed 5–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Filing
May 2, 2008.
PSEG Energy Resources & Trade LLC ...........................................................................................................................................
Public Service Electric and Gas Company ......................................................................................................................................
PSEG Power Connecticut LLC .........................................................................................................................................................
PSEG Fossil LLC ..............................................................................................................................................................................
PSEG Nuclear LLC ...........................................................................................................................................................................
PPL Electric Utilities Corporation .....................................................................................................................................................
Lower Mount Bethel Energy, LLC ....................................................................................................................................................
PPL Brunner Island, LLC ..................................................................................................................................................................
PPL Holtwood, LLC.
PPL Martins Creek, LLC.
PPL Montour, LLC.
PPL Susquehanna, LLC.
PPL University Park, LLC .................................................................................................................................................................
PPL EnergyPlus, LLC .......................................................................................................................................................................
PPL Edgewood Energy, LLC ............................................................................................................................................................
PPL Shoreham Energy, LLC ............................................................................................................................................................
PPL Great Works, LLC .....................................................................................................................................................................
PPL Maine, LLC ...............................................................................................................................................................................
PPL Wallingford Energy LLC ............................................................................................................................................................
Atlantic City Electric Company .........................................................................................................................................................
Delmarva Power & Light ...................................................................................................................................................................
Potomac Electric Power Company ...................................................................................................................................................
Conectiv Energy Supply, Inc. ...........................................................................................................................................................
Conectiv Bethlehem, LLC .................................................................................................................................................................
Pepco Energy Services, Inc. ............................................................................................................................................................
Bethlehem Renewable Energy, LLC ................................................................................................................................................
Eastern Landfill Gas, LLC ................................................................................................................................................................
Potomac Power Resources, LLC .....................................................................................................................................................
Fauquier Landfill Gas, LLC ...............................................................................................................................................................
VerDate Aug<31>2005
18:01 May 08, 2008
Jkt 214001
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
E:\FR\FM\09MYN1.SGM
09MYN1
ER99–3151–008
ER97–837–007
ER03–327–002
ER08–447–000
ER08–448–000
ER00–1712–008
ER02–2408–003
ER00–744–006
ER02–1327–005
ER00–1703–003
ER02–1749–003
ER02–1747–003
ER99–4503–005
ER00–2186–003
ER01–1559–004
ER96–1361–013
ER99–2781–011
ER98–4138–009
ER00–1770–019
ER02–453–010
ER98–3096–015
ER07–903–002
ER05–1054–003
ER01–202–008
ER04–472–007
Agencies
[Federal Register Volume 73, Number 91 (Friday, May 9, 2008)]
[Notices]
[Pages 26387-26388]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10300]
[[Page 26387]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13013-000]
Warrior Hydro, LLC; Notice of Application Accepted for Filing and
Soliciting Motions To Intervene, Protests, and Comments
May 2, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 13013-000.
c. Date filed: September 7, 2007.
d. Applicant: Warrior Hydro, LLC.
e. Name of Project: A. I. Selden Lock and Dam Hydroelectric
Project.
f. Location: Black Warrior River in Hale County, Alabama. It would
use the U.S. Army Corps of Engineers' A. I. Selden Lock and Dam.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Brent L. Smith, COO, Symbiotics, LLC,
P.O. Box 535, Rigby, ID 83442, (208) 745-0834.
i. FERC Contact: Robert Bell, (202) 502-4126.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-13013-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project using the U.S. Army
Corps of Engineers' A. I. Selden Lock and Dam and operated in a run-of-
river mode would consist of: (1) A new powerhouse and switchyard; (2)
three turbine/generator units with a combined installed capacity of 20
megawatts; (3) a new 3-mile-long above ground 46-kilovolt transmission
line extending from the switchyard to an interconnection point with the
utility distribution system owned by Black Warrior Electric Membership
Corporation; and (4) appurtenant facilities. The proposed A. I. Selden
Lock and Dam Project would have an average annual generation of 70
gigawatt-hours.
l. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
e-mail FERCONLINESUPPORT@FERC.GOV. For TTY, call (202) 502-8659. A copy
is also available for inspection and reproduction at the address in
item h above.
m. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR 4.30
and 4.36.
n. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30 and 4.36.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
p. Proposed Scope of Studies Under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
r. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', and ``MOTION TO INTERVENE'', as applicable, and the
Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower Administration and Compliance,
Federal Energy Regulatory Commission, at the above-mentioned address. A
copy of any notice of intent, competing application or motion to
intervene must also be served upon each representative of the Applicant
specified in the particular application.
s. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be
[[Page 26388]]
obtained by agencies directly from the Applicant. If an agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments. One copy of an agency's comments must
also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-10300 Filed 5-8-08; 8:45 am]
BILLING CODE 6717-01-P