Borough of Lehighton, PA; Notice of Availability of Environmental Assessment, 26390 [E8-10298]
Download as PDF
26390
Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices
380 (Order No. 486, 52 FR 47897),
Office of Energy Projects staff have
reviewed Symbiotics, LLC’s application
for the proposed Applegate Dam Project
and prepared this final environmental
assessment (FEA). The proposed project
would be located at the existing U.S.
Army Corps of Engineers’ (Corps)
Applegate dam located at river mile 45.7
on the Applegate River, near the town
of Medford, in Jackson County, Oregon.
The proposed project facilities would
occupy 7.1 acres of federal land
administered by the Corps below and
adjacent to the dam. In addition, the
project boundary would include 2.32
acres of National Forest System land
and 0.66 acre of U.S. Bureau of Land
Management land.
This FEA contains the Commission
staff’s analysis of the potential future
environmental effects of the project.
Staff has concluded that licensing the
project, with appropriate environmental
protective measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the FEA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Please contact Tim Looney by
telephone at (202) 502–6096 or by email at Timothy.Looney@ferc.gov if you
have any questions.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10297 Filed 5–8–08; 8:45 am]
jlentini on PROD1PC65 with NOTICES
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:01 May 08, 2008
Jkt 214001
further information, contact John Ramer
at (202) 502–8969.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10298 Filed 5–8–08; 8:45 am]
[Project No. 12455–004 (PA)]
BILLING CODE 6717–01–P
Borough of Lehighton, PA; Notice of
Availability of Environmental
Assessment
May 2, 2008.
In accordance with the National
Environmental Policy Act (NEPA) of
1969 and the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47879), the Office of Energy
Projects has reviewed the application
for an original license for the Beltzville
Hydroelectric Project (project), to be
located on Pohopoco Creek in Carbon
County, Pennsylvania, and has prepared
an Environmental Assessment (EA) in
cooperation with the U.S. Army Corps
of Engineers (Corps of Engineers) and
the Delaware River Basin Commission
(Basin Commission). In the EA,
Commission staff analyze the potential
environmental effects of licensing the
project and conclude that issuing a
license for the project, with appropriate
environmental measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
30 days from the issuance date of this
notice, and should be addressed to the
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1–A, Washington, DC 20426.
Please affix ‘‘Beltzville Hydroelectric
Project No. 12455–004’’ to all
comments. Comments may be filed
electronically via Internet in lieu of
paper. The Commission strongly
encourages electronic filings (See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link). For
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC08–57–000]
Trans Union Interstate Pipeline, L.P.;
Notice of Filing
May 2, 2008.
Take notice that on April 15, 2008
Trans Union Interstate Pipeline, L.P.
submitted a request for waiver of the
FERC Form No. 2–A under Section
260.2 of the Commission’s regulations.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
E:\FR\FM\09MYN1.SGM
09MYN1
Agencies
[Federal Register Volume 73, Number 91 (Friday, May 9, 2008)]
[Notices]
[Page 26390]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10298]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12455-004 (PA)]
Borough of Lehighton, PA; Notice of Availability of Environmental
Assessment
May 2, 2008.
In accordance with the National Environmental Policy Act (NEPA) of
1969 and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office
of Energy Projects has reviewed the application for an original license
for the Beltzville Hydroelectric Project (project), to be located on
Pohopoco Creek in Carbon County, Pennsylvania, and has prepared an
Environmental Assessment (EA) in cooperation with the U.S. Army Corps
of Engineers (Corps of Engineers) and the Delaware River Basin
Commission (Basin Commission). In the EA, Commission staff analyze the
potential environmental effects of licensing the project and conclude
that issuing a license for the project, with appropriate environmental
measures, would not constitute a major federal action significantly
affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available
for public inspection. The EA may also be viewed on the Commission's
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676,
or for TTY, (202) 502-8659.
Any comments should be filed within 30 days from the issuance date
of this notice, and should be addressed to the Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Room 1-A,
Washington, DC 20426. Please affix ``Beltzville Hydroelectric Project
No. 12455-004'' to all comments. Comments may be filed electronically
via Internet in lieu of paper. The Commission strongly encourages
electronic filings (See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site under the ``eFiling'' link). For further
information, contact John Ramer at (202) 502-8969.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-10298 Filed 5-8-08; 8:45 am]
BILLING CODE 6717-01-P