Borough of Lehighton, PA; Notice of Availability of Environmental Assessment, 26390 [E8-10298]

Download as PDF 26390 Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices 380 (Order No. 486, 52 FR 47897), Office of Energy Projects staff have reviewed Symbiotics, LLC’s application for the proposed Applegate Dam Project and prepared this final environmental assessment (FEA). The proposed project would be located at the existing U.S. Army Corps of Engineers’ (Corps) Applegate dam located at river mile 45.7 on the Applegate River, near the town of Medford, in Jackson County, Oregon. The proposed project facilities would occupy 7.1 acres of federal land administered by the Corps below and adjacent to the dam. In addition, the project boundary would include 2.32 acres of National Forest System land and 0.66 acre of U.S. Bureau of Land Management land. This FEA contains the Commission staff’s analysis of the potential future environmental effects of the project. Staff has concluded that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the FEA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Please contact Tim Looney by telephone at (202) 502–6096 or by email at Timothy.Looney@ferc.gov if you have any questions. Kimberly D. Bose, Secretary. [FR Doc. E8–10297 Filed 5–8–08; 8:45 am] jlentini on PROD1PC65 with NOTICES BILLING CODE 6717–01–P VerDate Aug<31>2005 18:01 May 08, 2008 Jkt 214001 further information, contact John Ramer at (202) 502–8969. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–10298 Filed 5–8–08; 8:45 am] [Project No. 12455–004 (PA)] BILLING CODE 6717–01–P Borough of Lehighton, PA; Notice of Availability of Environmental Assessment May 2, 2008. In accordance with the National Environmental Policy Act (NEPA) of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for an original license for the Beltzville Hydroelectric Project (project), to be located on Pohopoco Creek in Carbon County, Pennsylvania, and has prepared an Environmental Assessment (EA) in cooperation with the U.S. Army Corps of Engineers (Corps of Engineers) and the Delaware River Basin Commission (Basin Commission). In the EA, Commission staff analyze the potential environmental effects of licensing the project and conclude that issuing a license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment. A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Any comments should be filed within 30 days from the issuance date of this notice, and should be addressed to the Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1–A, Washington, DC 20426. Please affix ‘‘Beltzville Hydroelectric Project No. 12455–004’’ to all comments. Comments may be filed electronically via Internet in lieu of paper. The Commission strongly encourages electronic filings (See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link). For PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AC08–57–000] Trans Union Interstate Pipeline, L.P.; Notice of Filing May 2, 2008. Take notice that on April 15, 2008 Trans Union Interstate Pipeline, L.P. submitted a request for waiver of the FERC Form No. 2–A under Section 260.2 of the Commission’s regulations. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. E:\FR\FM\09MYN1.SGM 09MYN1

Agencies

[Federal Register Volume 73, Number 91 (Friday, May 9, 2008)]
[Notices]
[Page 26390]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10298]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12455-004 (PA)]


Borough of Lehighton, PA; Notice of Availability of Environmental 
Assessment

May 2, 2008.
    In accordance with the National Environmental Policy Act (NEPA) of 
1969 and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office 
of Energy Projects has reviewed the application for an original license 
for the Beltzville Hydroelectric Project (project), to be located on 
Pohopoco Creek in Carbon County, Pennsylvania, and has prepared an 
Environmental Assessment (EA) in cooperation with the U.S. Army Corps 
of Engineers (Corps of Engineers) and the Delaware River Basin 
Commission (Basin Commission). In the EA, Commission staff analyze the 
potential environmental effects of licensing the project and conclude 
that issuing a license for the project, with appropriate environmental 
measures, would not constitute a major federal action significantly 
affecting the quality of the human environment.
    A copy of the EA is on file with the Commission and is available 
for public inspection. The EA may also be viewed on the Commission's 
Web site at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, 
or for TTY, (202) 502-8659.
    Any comments should be filed within 30 days from the issuance date 
of this notice, and should be addressed to the Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE., Room 1-A, 
Washington, DC 20426. Please affix ``Beltzville Hydroelectric Project 
No. 12455-004'' to all comments. Comments may be filed electronically 
via Internet in lieu of paper. The Commission strongly encourages 
electronic filings (See 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site under the ``eFiling'' link). For further 
information, contact John Ramer at (202) 502-8969.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-10298 Filed 5-8-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.