Download as PDF 26388 Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–10300 Filed 5–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER99–2948–012; ER00–2918– 011; ER00–2917–011; ER97–2261–022; ER01–556–010; ER01–1654–013; ER02– 2567–011; ER02–699–005; ER04–485–008; ER07–247–003; ER07–245–003; ER07–244– 003] Baltimore Gas and Electric Company; Constellation Power Source Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.; Constellation Energy Commodities Group, Inc.; Handsome Lake Energy, LLC; Nine Mile Point Nuclear Station, LLC; Constellation NewEnergy, Inc.; Constellation Energy Commodities Group Maine, LLC; R.E. Ginna Nuclear Power Plant, LLC; Raven One, LLC; Raven Two, LLC; Raven Three, LLC; Notice of Filing May 2, 2008. jlentini on PROD1PC65 with NOTICES Take notice that on April 21, 2008, the above-captioned entities (collective, the Constellation MBR Enitities) filed their joint market-power analysis update for the Northeast region and certain amendments to their market-based rate tariffs in compliance with Order No. 697. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 12, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–10294 Filed 5–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Filing May 2, 2008. PSEG Energy Resources & Trade LLC ........................................................................................................................................... Public Service Electric and Gas Company ...................................................................................................................................... PSEG Power Connecticut LLC ......................................................................................................................................................... PSEG Fossil LLC .............................................................................................................................................................................. PSEG Nuclear LLC ........................................................................................................................................................................... PPL Electric Utilities Corporation ..................................................................................................................................................... Lower Mount Bethel Energy, LLC .................................................................................................................................................... PPL Brunner Island, LLC .................................................................................................................................................................. PPL Holtwood, LLC. PPL Martins Creek, LLC. PPL Montour, LLC. PPL Susquehanna, LLC. PPL University Park, LLC ................................................................................................................................................................. PPL EnergyPlus, LLC ....................................................................................................................................................................... PPL Edgewood Energy, LLC ............................................................................................................................................................ PPL Shoreham Energy, LLC ............................................................................................................................................................ PPL Great Works, LLC ..................................................................................................................................................................... PPL Maine, LLC ............................................................................................................................................................................... PPL Wallingford Energy LLC ............................................................................................................................................................ Atlantic City Electric Company ......................................................................................................................................................... Delmarva Power & Light ................................................................................................................................................................... Potomac Electric Power Company ................................................................................................................................................... Conectiv Energy Supply, Inc. ........................................................................................................................................................... Conectiv Bethlehem, LLC ................................................................................................................................................................. Pepco Energy Services, Inc. ............................................................................................................................................................ Bethlehem Renewable Energy, LLC ................................................................................................................................................ Eastern Landfill Gas, LLC ................................................................................................................................................................ Potomac Power Resources, LLC ..................................................................................................................................................... Fauquier Landfill Gas, LLC ............................................................................................................................................................... VerDate Aug<31>2005 18:01 May 08, 2008 Jkt 214001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\09MYN1.SGM 09MYN1 ER99–3151–008 ER97–837–007 ER03–327–002 ER08–447–000 ER08–448–000 ER00–1712–008 ER02–2408–003 ER00–744–006 ER02–1327–005 ER00–1703–003 ER02–1749–003 ER02–1747–003 ER99–4503–005 ER00–2186–003 ER01–1559–004 ER96–1361–013 ER99–2781–011 ER98–4138–009 ER00–1770–019 ER02–453–010 ER98–3096–015 ER07–903–002 ER05–1054–003 ER01–202–008 ER04–472–007 26389 Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices Dominion Energy Marketing, Inc. ..................................................................................................................................................... Dominion Nuclear Connecticut, Inc. ................................................................................................................................................. Dominion Nuclear Marketing III, LLC ............................................................................................................................................... Dominion Energy Kewaunee, Inc. .................................................................................................................................................... Dominion Energy Brayton Point, LLC .............................................................................................................................................. Dominion Energy Manchester Street, Inc. ....................................................................................................................................... Dominion Energy New England, Inc. ............................................................................................................................................... Dominion Energy Salem ................................................................................................................................................................... Dominion Retail, Inc. ........................................................................................................................................................................ Elwood Energy, LLC ......................................................................................................................................................................... Fairless Energy, LLC ........................................................................................................................................................................ Kincaid Generation, LLC .................................................................................................................................................................. State Line Energy, LLC .................................................................................................................................................................... Virginia Electric and Power Company .............................................................................................................................................. jlentini on PROD1PC65 with NOTICES Baltimore Gas and Electric Company .............................................................................................................................................. Constellation Power Source Generation, Inc. .................................................................................................................................. Calvert Cliffs Nuclear Power Plant, Inc. ........................................................................................................................................... Constellation Energy Commodities Group, Inc. ............................................................................................................................... Handsome Lake Energy, LLC .......................................................................................................................................................... Nine Mile Point Nuclear Station, LLC ............................................................................................................................................... Constellation NewEnergy, Inc. ......................................................................................................................................................... Constellation Energy Commodities Group Maine, LLC ................................................................................................................... R.E. Ginna Nuclear Power Plant ...................................................................................................................................................... Raven One, LLC ............................................................................................................................................................................... Raven Two, LLC ............................................................................................................................................................................... Raven Three, LLC ............................................................................................................................................................................ Exelon Generation Company, LLC ................................................................................................................................................... AmerGen Energy Company, LLC ..................................................................................................................................................... Commonwealth Edison Company .................................................................................................................................................... Exelon Energy Company .................................................................................................................................................................. PECO Energy Company ................................................................................................................................................................... Exelon West Medway, LLC .............................................................................................................................................................. Exelon New Boston, LLC. Exelon Framingham, LLC. Exelon Wyman, LLC. Exelon New England Power Marketing, L.P. ................................................................................................................................... FirstEnergy Operating Companies ................................................................................................................................................... Pennsylvania Power Company, et al. .............................................................................................................................................. Jersey Central Power & Light Company .......................................................................................................................................... FirstEnergy Solutions Corp. .............................................................................................................................................................. FirstEnergy Generation Corporation ................................................................................................................................................. FirstEnergy Nuclear Generating Corporation ................................................................................................................................... FirstEnergy Generating Mansfield Unit 1 Corp. (collectively PJM RTO Filers) ............................................................................... Take notice that on April 30, 2008, The PJM RTO filers filed a partial compliance filing, pursuant to the Commission’s April 4, 2008 Letter Order, requesting addition information related to PJM RTO filer’s upated market power analyses. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy VerDate Aug<31>2005 18:01 May 08, 2008 Jkt 214001 of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 ER01–468–008 ER00–3621–009 ER00–3746–009 ER04–318–004 ER05–36–005 ER05–37–005 ER05–34–005 ER05–35–005 ER04–249–005 ER99–1695–010 ER02–23–011 ER97–30–006 ER96–2869–013 ER97–3561–005 ER00–1737–011 ER99–2948–012 ER00–2918–011 ER00–2917–011 ER97–2261–022 ER01–556–010 ER01–1654–013 ER02–2567–011 ER02–699–005 ER04–485–008 ER07–247–003 ER07–245–003 ER07–244–003 ER00–3251–015 ER99–754–016 ER98–1734–014 ER01–1919–011 ER01–1147–006 ER01–513–021 ER99–2404–011 ER01–1403–006 ER06–1443–002 ER04–366–005 ER01–2968–007 ER01–845–006 ER05–1122–004 ER08–107–001 (866) 208-3676 (toll free). For TTY, call (202) 502-8659. Comment Date: 5 p.m. Eastern Time on May 20, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–10295 Filed 5–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11910–002 Oregon] Applegate Dam; Notice of Availability of Final Environmental Assessment May 2, 2008. In accordance with the National Environmental Policy Act of 1969 and Federal Energy Regulatory Commission (Commission) regulations, 18 CFR Part E:\FR\FM\09MYN1.SGM 09MYN1

Agencies

[Federal Register Volume 73, Number 91 (Friday, May 9, 2008)]
[Notices]
[Pages 26388-26389]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10295]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Filing

May 2, 2008.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
PSEG Energy Resources & Trade LLC......  ER99-3151-008
Public Service Electric and Gas Company  ER97-837-007
PSEG Power Connecticut LLC.............  ER03-327-002
PSEG Fossil LLC........................  ER08-447-000
PSEG Nuclear LLC.......................  ER08-448-000
PPL Electric Utilities Corporation.....  ER00-1712-008
Lower Mount Bethel Energy, LLC.........  ER02-2408-003
PPL Brunner Island, LLC................  ER00-744-006
PPL Holtwood, LLC......................
PPL Martins Creek, LLC.................
PPL Montour, LLC.......................
PPL Susquehanna, LLC...................
PPL University Park, LLC...............  ER02-1327-005
PPL EnergyPlus, LLC....................  ER00-1703-003
PPL Edgewood Energy, LLC...............  ER02-1749-003
PPL Shoreham Energy, LLC...............  ER02-1747-003
PPL Great Works, LLC...................  ER99-4503-005
PPL Maine, LLC.........................  ER00-2186-003
PPL Wallingford Energy LLC.............  ER01-1559-004
Atlantic City Electric Company.........  ER96-1361-013
Delmarva Power & Light.................  ER99-2781-011
Potomac Electric Power Company.........  ER98-4138-009
Conectiv Energy Supply, Inc............  ER00-1770-019
Conectiv Bethlehem, LLC................  ER02-453-010
Pepco Energy Services, Inc.............  ER98-3096-015
Bethlehem Renewable Energy, LLC........  ER07-903-002
Eastern Landfill Gas, LLC..............  ER05-1054-003
Potomac Power Resources, LLC...........  ER01-202-008
Fauquier Landfill Gas, LLC.............  ER04-472-007

[[Page 26389]]

 
Dominion Energy Marketing, Inc.........  ER01-468-008
Dominion Nuclear Connecticut, Inc......  ER00-3621-009
Dominion Nuclear Marketing III, LLC....  ER00-3746-009
Dominion Energy Kewaunee, Inc..........  ER04-318-004
Dominion Energy Brayton Point, LLC.....  ER05-36-005
Dominion Energy Manchester Street, Inc.  ER05-37-005
Dominion Energy New England, Inc.......  ER05-34-005
Dominion Energy Salem..................  ER05-35-005
Dominion Retail, Inc...................  ER04-249-005
Elwood Energy, LLC.....................  ER99-1695-010
Fairless Energy, LLC...................  ER02-23-011
Kincaid Generation, LLC................  ER97-30-006
State Line Energy, LLC.................  ER96-2869-013
Virginia Electric and Power Company....  ER97-3561-005
                                         ER00-1737-011
Baltimore Gas and Electric Company.....  ER99-2948-012
Constellation Power Source Generation,   ER00-2918-011
 Inc..
Calvert Cliffs Nuclear Power Plant,      ER00-2917-011
 Inc..
Constellation Energy Commodities Group,  ER97-2261-022
 Inc..
Handsome Lake Energy, LLC..............  ER01-556-010
Nine Mile Point Nuclear Station, LLC...  ER01-1654-013
Constellation NewEnergy, Inc...........  ER02-2567-011
Constellation Energy Commodities Group   ER02-699-005
 Maine, LLC.
R.E. Ginna Nuclear Power Plant.........  ER04-485-008
Raven One, LLC.........................  ER07-247-003
Raven Two, LLC.........................  ER07-245-003
Raven Three, LLC.......................  ER07-244-003
Exelon Generation Company, LLC.........  ER00-3251-015
AmerGen Energy Company, LLC............  ER99-754-016
Commonwealth Edison Company............  ER98-1734-014
Exelon Energy Company..................  ER01-1919-011
PECO Energy Company....................  ER01-1147-006
Exelon West Medway, LLC................  ER01-513-021
Exelon New Boston, LLC.................
Exelon Framingham, LLC.................
Exelon Wyman, LLC......................
Exelon New England Power Marketing,      ER99-2404-011
 L.P..
FirstEnergy Operating Companies........  ER01-1403-006
Pennsylvania Power Company, et al......  ER06-1443-002
Jersey Central Power & Light Company...  ER04-366-005
FirstEnergy Solutions Corp.............  ER01-2968-007
FirstEnergy Generation Corporation.....  ER01-845-006
FirstEnergy Nuclear Generating           ER05-1122-004
 Corporation.
FirstEnergy Generating Mansfield Unit 1  ER08-107-001
 Corp. (collectively PJM RTO Filers).
------------------------------------------------------------------------

    Take notice that on April 30, 2008, The PJM RTO filers filed a 
partial compliance filing, pursuant to the Commission's April 4, 2008 
Letter Order, requesting addition information related to PJM RTO 
filer's upated market power analyses.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on May 20, 2008.

Kimberly D. Bose,
Secretary.