Baltimore Gas and Electric Company; Constellation Power Source Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.; Constellation Energy Commodities Group, Inc.; Handsome Lake Energy, LLC; Nine Mile Point Nuclear Station, LLC; Constellation NewEnergy, Inc.; Constellation Energy Commodities Group Maine, LLC; R.E. Ginna Nuclear Power Plant, LLC; Raven One, LLC; Raven Two, LLC; Raven Three, LLC; Notice of Filing, 26388 [E8-10294]
Download as PDF
26388
Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10300 Filed 5–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER99–2948–012; ER00–2918–
011; ER00–2917–011; ER97–2261–022;
ER01–556–010; ER01–1654–013; ER02–
2567–011; ER02–699–005; ER04–485–008;
ER07–247–003; ER07–245–003; ER07–244–
003]
Baltimore Gas and Electric Company;
Constellation Power Source
Generation, Inc.; Calvert Cliffs Nuclear
Power Plant, Inc.; Constellation Energy
Commodities Group, Inc.; Handsome
Lake Energy, LLC; Nine Mile Point
Nuclear Station, LLC; Constellation
NewEnergy, Inc.; Constellation Energy
Commodities Group Maine, LLC; R.E.
Ginna Nuclear Power Plant, LLC;
Raven One, LLC; Raven Two, LLC;
Raven Three, LLC; Notice of Filing
May 2, 2008.
jlentini on PROD1PC65 with NOTICES
Take notice that on April 21, 2008,
the above-captioned entities (collective,
the Constellation MBR Enitities) filed
their joint market-power analysis update
for the Northeast region and certain
amendments to their market-based rate
tariffs in compliance with Order No.
697.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on May 12, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10294 Filed 5–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Filing
May 2, 2008.
PSEG Energy Resources & Trade LLC ...........................................................................................................................................
Public Service Electric and Gas Company ......................................................................................................................................
PSEG Power Connecticut LLC .........................................................................................................................................................
PSEG Fossil LLC ..............................................................................................................................................................................
PSEG Nuclear LLC ...........................................................................................................................................................................
PPL Electric Utilities Corporation .....................................................................................................................................................
Lower Mount Bethel Energy, LLC ....................................................................................................................................................
PPL Brunner Island, LLC ..................................................................................................................................................................
PPL Holtwood, LLC.
PPL Martins Creek, LLC.
PPL Montour, LLC.
PPL Susquehanna, LLC.
PPL University Park, LLC .................................................................................................................................................................
PPL EnergyPlus, LLC .......................................................................................................................................................................
PPL Edgewood Energy, LLC ............................................................................................................................................................
PPL Shoreham Energy, LLC ............................................................................................................................................................
PPL Great Works, LLC .....................................................................................................................................................................
PPL Maine, LLC ...............................................................................................................................................................................
PPL Wallingford Energy LLC ............................................................................................................................................................
Atlantic City Electric Company .........................................................................................................................................................
Delmarva Power & Light ...................................................................................................................................................................
Potomac Electric Power Company ...................................................................................................................................................
Conectiv Energy Supply, Inc. ...........................................................................................................................................................
Conectiv Bethlehem, LLC .................................................................................................................................................................
Pepco Energy Services, Inc. ............................................................................................................................................................
Bethlehem Renewable Energy, LLC ................................................................................................................................................
Eastern Landfill Gas, LLC ................................................................................................................................................................
Potomac Power Resources, LLC .....................................................................................................................................................
Fauquier Landfill Gas, LLC ...............................................................................................................................................................
VerDate Aug<31>2005
18:01 May 08, 2008
Jkt 214001
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
E:\FR\FM\09MYN1.SGM
09MYN1
ER99–3151–008
ER97–837–007
ER03–327–002
ER08–447–000
ER08–448–000
ER00–1712–008
ER02–2408–003
ER00–744–006
ER02–1327–005
ER00–1703–003
ER02–1749–003
ER02–1747–003
ER99–4503–005
ER00–2186–003
ER01–1559–004
ER96–1361–013
ER99–2781–011
ER98–4138–009
ER00–1770–019
ER02–453–010
ER98–3096–015
ER07–903–002
ER05–1054–003
ER01–202–008
ER04–472–007
Agencies
[Federal Register Volume 73, Number 91 (Friday, May 9, 2008)]
[Notices]
[Page 26388]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10294]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER99-2948-012; ER00-2918-011; ER00-2917-011; ER97-2261-
022; ER01-556-010; ER01-1654-013; ER02-2567-011; ER02-699-005; ER04-
485-008; ER07-247-003; ER07-245-003; ER07-244-003]
Baltimore Gas and Electric Company; Constellation Power Source
Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.;
Constellation Energy Commodities Group, Inc.; Handsome Lake Energy,
LLC; Nine Mile Point Nuclear Station, LLC; Constellation NewEnergy,
Inc.; Constellation Energy Commodities Group Maine, LLC; R.E. Ginna
Nuclear Power Plant, LLC; Raven One, LLC; Raven Two, LLC; Raven Three,
LLC; Notice of Filing
May 2, 2008.
Take notice that on April 21, 2008, the above-captioned entities
(collective, the Constellation MBR Enitities) filed their joint market-
power analysis update for the Northeast region and certain amendments
to their market-based rate tariffs in compliance with Order No. 697.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on May 12, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-10294 Filed 5-8-08; 8:45 am]
BILLING CODE 6717-01-P