Baltimore Gas and Electric Company; Constellation Power Source Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.; Constellation Energy Commodities Group, Inc.; Handsome Lake Energy, LLC; Nine Mile Point Nuclear Station, LLC; Constellation NewEnergy, Inc.; Constellation Energy Commodities Group Maine, LLC; R.E. Ginna Nuclear Power Plant, LLC; Raven One, LLC; Raven Two, LLC; Raven Three, LLC; Notice of Filing, 26388 [E8-10294]

Download as PDF 26388 Federal Register / Vol. 73, No. 91 / Friday, May 9, 2008 / Notices obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–10300 Filed 5–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER99–2948–012; ER00–2918– 011; ER00–2917–011; ER97–2261–022; ER01–556–010; ER01–1654–013; ER02– 2567–011; ER02–699–005; ER04–485–008; ER07–247–003; ER07–245–003; ER07–244– 003] Baltimore Gas and Electric Company; Constellation Power Source Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.; Constellation Energy Commodities Group, Inc.; Handsome Lake Energy, LLC; Nine Mile Point Nuclear Station, LLC; Constellation NewEnergy, Inc.; Constellation Energy Commodities Group Maine, LLC; R.E. Ginna Nuclear Power Plant, LLC; Raven One, LLC; Raven Two, LLC; Raven Three, LLC; Notice of Filing May 2, 2008. jlentini on PROD1PC65 with NOTICES Take notice that on April 21, 2008, the above-captioned entities (collective, the Constellation MBR Enitities) filed their joint market-power analysis update for the Northeast region and certain amendments to their market-based rate tariffs in compliance with Order No. 697. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on May 12, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–10294 Filed 5–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Filing May 2, 2008. PSEG Energy Resources & Trade LLC ........................................................................................................................................... Public Service Electric and Gas Company ...................................................................................................................................... PSEG Power Connecticut LLC ......................................................................................................................................................... PSEG Fossil LLC .............................................................................................................................................................................. PSEG Nuclear LLC ........................................................................................................................................................................... PPL Electric Utilities Corporation ..................................................................................................................................................... Lower Mount Bethel Energy, LLC .................................................................................................................................................... PPL Brunner Island, LLC .................................................................................................................................................................. PPL Holtwood, LLC. PPL Martins Creek, LLC. PPL Montour, LLC. PPL Susquehanna, LLC. PPL University Park, LLC ................................................................................................................................................................. PPL EnergyPlus, LLC ....................................................................................................................................................................... PPL Edgewood Energy, LLC ............................................................................................................................................................ PPL Shoreham Energy, LLC ............................................................................................................................................................ PPL Great Works, LLC ..................................................................................................................................................................... PPL Maine, LLC ............................................................................................................................................................................... PPL Wallingford Energy LLC ............................................................................................................................................................ Atlantic City Electric Company ......................................................................................................................................................... Delmarva Power & Light ................................................................................................................................................................... Potomac Electric Power Company ................................................................................................................................................... Conectiv Energy Supply, Inc. ........................................................................................................................................................... Conectiv Bethlehem, LLC ................................................................................................................................................................. Pepco Energy Services, Inc. ............................................................................................................................................................ Bethlehem Renewable Energy, LLC ................................................................................................................................................ Eastern Landfill Gas, LLC ................................................................................................................................................................ Potomac Power Resources, LLC ..................................................................................................................................................... Fauquier Landfill Gas, LLC ............................................................................................................................................................... VerDate Aug<31>2005 18:01 May 08, 2008 Jkt 214001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\09MYN1.SGM 09MYN1 ER99–3151–008 ER97–837–007 ER03–327–002 ER08–447–000 ER08–448–000 ER00–1712–008 ER02–2408–003 ER00–744–006 ER02–1327–005 ER00–1703–003 ER02–1749–003 ER02–1747–003 ER99–4503–005 ER00–2186–003 ER01–1559–004 ER96–1361–013 ER99–2781–011 ER98–4138–009 ER00–1770–019 ER02–453–010 ER98–3096–015 ER07–903–002 ER05–1054–003 ER01–202–008 ER04–472–007

Agencies

[Federal Register Volume 73, Number 91 (Friday, May 9, 2008)]
[Notices]
[Page 26388]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10294]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. ER99-2948-012; ER00-2918-011; ER00-2917-011; ER97-2261-
022; ER01-556-010; ER01-1654-013; ER02-2567-011; ER02-699-005; ER04-
485-008; ER07-247-003; ER07-245-003; ER07-244-003]


Baltimore Gas and Electric Company; Constellation Power Source 
Generation, Inc.; Calvert Cliffs Nuclear Power Plant, Inc.; 
Constellation Energy Commodities Group, Inc.; Handsome Lake Energy, 
LLC; Nine Mile Point Nuclear Station, LLC; Constellation NewEnergy, 
Inc.; Constellation Energy Commodities Group Maine, LLC; R.E. Ginna 
Nuclear Power Plant, LLC; Raven One, LLC; Raven Two, LLC; Raven Three, 
LLC; Notice of Filing

May 2, 2008.
    Take notice that on April 21, 2008, the above-captioned entities 
(collective, the Constellation MBR Enitities) filed their joint market-
power analysis update for the Northeast region and certain amendments 
to their market-based rate tariffs in compliance with Order No. 697.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Applicant and all the parties in this proceeding.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on May 12, 2008.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-10294 Filed 5-8-08; 8:45 am]
BILLING CODE 6717-01-P