Eagle Crest Energy Company; Notice of Application Accepted for Filing and Soliciting Comments, Protests, and Motions To Intervene, 26094-26096 [E8-10170]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
26094
Federal Register / Vol. 73, No. 90 / Thursday, May 8, 2008 / Notices
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would consist of: (1)
12 proposed generating units having a
total installed capacity of 6-megawatts;
(2) a proposed transmission line; and (4)
appurtenant facilities. The project
would have an average annual
generation of 316-gigawatt-hours and be
sold to a local utility.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
o. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
VerDate Aug<31>2005
17:22 May 07, 2008
Jkt 214001
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
p. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at
https://www.ferc.gov under the ‘‘eFiling’’ link.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
t. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10169 Filed 5–7–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13123–000]
Eagle Crest Energy Company; Notice
of Application Accepted for Filing and
Soliciting Comments, Protests, and
Motions To Intervene
April 30, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 13123–000.
c. Date filed: March 3, 2008.
d. Applicant: Eagle Crest Energy
Company.
e. Name and Location of Project: The
proposed Eagle Mountain Pumped
Storage Project would be located in
Riverside County, California. The
project would use federal land managed
by the U.S. Bureau of Land Management
(BLM).
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant contact: Mr. Arthur W.
Lowe, 1 El Paseo West, Suite 204, 74199
El Paseo, Palm Desert, CA 92260, (760)
779–0040, and Mr. Donald H. Clarke,
Esq., Law Offices of GKRSE, 1500 K St.,
NW., Suite 330, Washington, DC 20005,
(202) 408–5400.
E:\FR\FM\08MYN1.SGM
08MYN1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 90 / Thursday, May 8, 2008 / Notices
h. FERC Contact: Kelly Houff, (202)
502–6393.
i. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
13123–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
j. Description of Existing Facilities
and Proposed Project: The proposed
pumped storage project would consist
of: (1) Two upper reservoir dams, the
first proposed dam would be 1,100 to
1,600-foot-long, 60-foot-high, and the
second proposed dam would be 1,100 to
1,600-foot-long, 120-foot-high, (2) a
proposed upper reservoir having a
surface area of 193 acres, with a storage
capacity of 20,000 acre-feet and a
normal water surface elevation of 2,485
feet mean sea level (msl), (3) a proposed
lower reservoir having a surface area of
164 acres, with storage capacity of
21,900 acre-feet and normal water
surface elevation of 926 feet msl located
within the East Pit of the inactive Eagle
Mountain Mine, (4) proposed intake and
outlet structures for both reservoirs, (5)
a proposed upper ‘‘low head’’ pressure
4,400-foot-long, 35-foot-diameter tunnel
and a lower tunnel 1,500 feet in length
and 35 feet in diameter, which will
extend to a penstock manifold. These
two tunnels will be joined by a 35-footdiameter vertical shaft 1,333-foot deep,
(6) a proposed powerhouse containing
four generating units having a total
installed capacity of 1,300 megawatts,
(7) a proposed 6,835-foot-long, 35-footdiameter tailrace tunnel, (8) a proposed
46-mile-long, 500 kilovolt transmission
line, (9) a desalination facility, and (10)
appurtenant facilities.
VerDate Aug<31>2005
17:22 May 07, 2008
Jkt 214001
k. Location of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
n. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
26095
p. Proposed Scope of Studies under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
E:\FR\FM\08MYN1.SGM
08MYN1
26096
Federal Register / Vol. 73, No. 90 / Thursday, May 8, 2008 / Notices
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10170 Filed 5–7–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP08–158–000; CP08–184–
000]
Williston Basin Interstate Pipeline
Company; Notice of Application and
Petition for Declaratory Order
mstockstill on PROD1PC66 with NOTICES
May 1, 2008.
Take notice that on April 18, 2008,
Williston Basin Interstate Pipeline
Company (Williston Basin), P.O. Box
5601, Bismarck North Dakota 58506–
5601, filed in Docket Number CP08–
158–000, pursuant to section 7(c) of the
Natural Gas Act (NGA), an application
for authority to expand the existing
certificated boundary and add a buffer
zone to its Elk Basin Storage Reservoir
located in Park County, Wyoming and
Carbon County, Montana. Also, take
notice that on April 24, 2008, Williston
Basin filed in Docket Number CP08–
184–000, pursuant to Rule 207(a)(2) of
the Commission’s Rules of Practice and
Procedure, a petition for a declaratory
order to confirm the scope of its
certificate for the Elk Basin Storage
Reservoir and the jurisdictional status
under the NGA of the Elk Basin cushion
gas. These filings are available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Any questions regarding this
Application or Petition should be
directed to Keith A. Tiggelaar, Director
of Regulatory Affairs for Williston
Basin, 1250 West Century Avenue,
Bismarck, North Dakota 58503, by
phone at (701) 530–1560 or by e-mail at
keith.tiggelaar@wbip.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
VerDate Aug<31>2005
17:22 May 07, 2008
Jkt 214001
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the below listed
comment date, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: May 22, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–10203 Filed 5–7–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13088–000]
KC LLC; Notice of Application
Accepted for Filing and Soliciting
Comments, Protests, and Motions To
Intervene
May 1, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 13088–000.
c. Date filed: December 20, 2007, and
revised March 21, 2008.
d. Applicant: KC LLC.
e. Name and Location of Project: The
proposed Tinemaha Hydro Project
would be located near the town of Big
Pine on the Owens River at the existing
Tinemaha Reservoir in Inyo County,
California.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
g. Applicant Contact: Ms. Kelly
Sackheim, Principal, KC LLC, 5096
Cocoa Palm Way, Fair Oaks, CA 95628,
(916) 962–2271.
h. FERC Contact: Tom Papsidero,
(202) 502–6002.
E:\FR\FM\08MYN1.SGM
08MYN1
Agencies
[Federal Register Volume 73, Number 90 (Thursday, May 8, 2008)]
[Notices]
[Pages 26094-26096]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-10170]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13123-000]
Eagle Crest Energy Company; Notice of Application Accepted for
Filing and Soliciting Comments, Protests, and Motions To Intervene
April 30, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 13123-000.
c. Date filed: March 3, 2008.
d. Applicant: Eagle Crest Energy Company.
e. Name and Location of Project: The proposed Eagle Mountain Pumped
Storage Project would be located in Riverside County, California. The
project would use federal land managed by the U.S. Bureau of Land
Management (BLM).
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
g. Applicant contact: Mr. Arthur W. Lowe, 1 El Paseo West, Suite
204, 74199 El Paseo, Palm Desert, CA 92260, (760) 779-0040, and Mr.
Donald H. Clarke, Esq., Law Offices of GKRSE, 1500 K St., NW., Suite
330, Washington, DC 20005, (202) 408-5400.
[[Page 26095]]
h. FERC Contact: Kelly Houff, (202) 502-6393.
i. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-13123-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
j. Description of Existing Facilities and Proposed Project: The
proposed pumped storage project would consist of: (1) Two upper
reservoir dams, the first proposed dam would be 1,100 to 1,600-foot-
long, 60-foot-high, and the second proposed dam would be 1,100 to
1,600-foot-long, 120-foot-high, (2) a proposed upper reservoir having a
surface area of 193 acres, with a storage capacity of 20,000 acre-feet
and a normal water surface elevation of 2,485 feet mean sea level
(msl), (3) a proposed lower reservoir having a surface area of 164
acres, with storage capacity of 21,900 acre-feet and normal water
surface elevation of 926 feet msl located within the East Pit of the
inactive Eagle Mountain Mine, (4) proposed intake and outlet structures
for both reservoirs, (5) a proposed upper ``low head'' pressure 4,400-
foot-long, 35-foot-diameter tunnel and a lower tunnel 1,500 feet in
length and 35 feet in diameter, which will extend to a penstock
manifold. These two tunnels will be joined by a 35-foot-diameter
vertical shaft 1,333-foot deep, (6) a proposed powerhouse containing
four generating units having a total installed capacity of 1,300
megawatts, (7) a proposed 6,835-foot-long, 35-foot-diameter tailrace
tunnel, (8) a proposed 46-mile-long, 500 kilovolt transmission line,
(9) a desalination facility, and (10) appurtenant facilities.
k. Location of Applications: A copy of the application is available
for inspection and reproduction at the Commission in the Public
Reference Room or may be viewed on the Commission's Web site at https://
www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item g
above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR 4.30
and 4.36.
n. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30 and 4.36.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be served on the applicant(s)
named in this public notice.
p. Proposed Scope of Studies under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
r. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, and the Project
Number of the particular application to which the filing refers. Any of
the above-named documents must be filed by providing the original and
the number of copies provided by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. An additional copy must be sent to Director,
Division of Hydropower Administration and Compliance, Federal Energy
Regulatory Commission, at the above-mentioned address. A copy of any
notice of intent, competing application or motion to intervene must
also be served upon each representative of the Applicant specified in
the particular application.
s. Agency Comments--Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
[[Page 26096]]
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-10170 Filed 5-7-08; 8:45 am]
BILLING CODE 6717-01-P