Environmental Impacts Statements; Notice of Availability, 24280-24281 [E8-9744]
Download as PDF
24280
Federal Register / Vol. 73, No. 86 / Friday, May 2, 2008 / Notices
mstockstill on PROD1PC66 with NOTICES
Whidbey Island, WA; Naval Air Station
North Island, CA; Marine Corps Base HI
and Kaneohe Bay, HI.
Summary: EPA does not object to the
proposed action. Rating LO.
EIS No. 20080063, ERP No. DS–USN–
K11119–HI. Hawaii Range Complex
(HRC) Project, Additional Information,
To Support and Maintain Navy Pacific
Fleet Training, and Research,
Development, Test, and Evaluation
(RDT&E) Operations, Kauai, Honolulu,
Maui and Hawaii Counties, HI.
Summary: EPA expressed concerns
about impacts to marine mammals from
mid-frequency active (MFA) sonar.
Rating EC2.
EIS No. 20080084, ERP No. DS–AFS–
J65448–UT. West Bear Vegetation
Management Project, Additional
Information To Improve a Portion of the
Cumulative Effects Analysis and Correct
the Soils Analysis, Timber Harvesting,
Prescribed Burning, Roads Construction,
Township 1 North, Range 9 East, Salt
Lake Principle Meridian, Evanston
Ranger District, Wasatch-Cache National
Forest, Summit County, UT.
Summary: This DSEIS responded
adequately to our concerns on soil
erosion and compactions; therefore,
EPA does not object to the proposed
action. Rating LO.
EIS No. 20080096, ERP No. DS–NOA–
K39102–CA. Cordell Bank, Gulf of the
Farallones and Monterey Bay National
Marine Sanctuaries, Updated
Information, Proposes a Series of
Regulatory Changes, Offshore of
Northern/Central, CA.
Summary: EPA does not object to the
proposed project. Rating LO.
Final EISs
EIS No. 20080082, ERP No. F–AFS–
L65542–ID. Cherry Dinner Project,
Management of Vegetation, Hazardous
Fuels, and Access Plus Watershed
Improvements, Amendment to the
Forest Plan, Palouse Ranger District,
Clearwater National Forest, Latah
County, ID.
Summary: EPA does not object to the
proposed action.
EIS No. 20080085, ERP No. F–NPS–
L65515–WA. Olympic National Park
General Management Plan,
Implementation, Clallam, Grays Harbor,
Jefferson and Mason Counties, WA.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080100, ERP No. F–AFS–
L65482–ID. Aspen Range Timber Sale
and Vegetation Treatment Project, New
Updated Version, Preferred Alternative
is 5, Proposal To Treat Forested and
Nonforested Vegetation, CaribouTarghee National Forest, Soda Springs
Ranger District, Caribou County, ID.
VerDate Aug<31>2005
17:17 May 01, 2008
Jkt 214001
Summary: EPA supports the Preferred
Alternative that decreases roads in
riparian areas and meets Forest Plan
standards and guidelines including
Goshawk Habitat.
EIS No. 20080108, ERP No. FR–WPA–
K08024–CA. Sacramento Area Voltage
Support Project, Revision to FSEIS Filed
February 2008, Selected Preferred
Alternative B, Proposal to Build a
Double-Circuit 230-kV Transmission
Line, Placer, Sacramento and Sutter
Counties, CA.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: April 29, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–9709 Filed 5–1–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6698–4]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 04/21/2008 through 04/25/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080155, Final EIS, AFS, MT,
Cooney McKay Forest Health and
Fuels Reduction Project, Proposed to
Restore Desirable Vegetative
Conditions, Swan Valley near
Condon, Swan Lake Ranger District,
Flathead National Forest, Lake and
Missoula Counties, MT, Wait Period
Ends: 06/02/2008, Contact: Joleen
Dunham 406–837–7510.
EIS No. 20080156, Draft EIS, NRC, GA,
GENERIC—License Renewal of
Nuclear Plants, Supplement 34 to
NUREG–1437, Regarding Vogtle
Electric Generating Plant Units 1 and
2 (VEGP) near Waynesboro, GA,
Comment Period Ends: 07/16/2008,
Contact: Justin P. Leous 301–415–
2864.
EIS No. 20080157, Final EIS, AFS, WA,
Gifford-Pinchot National Forest and
Columbia River Gorge National Scenic
Area (Washington Portion) SiteSpecific Invasive Plant Treatment
Project, Implementation, Skamania,
Cowlitz, Lewis, Clark, Klickitat
Counties, WA, Wait Period Ends: 06/
02/2008, Contact: Carol A. Chandler
360–891–5108.
EIS No. 20080158, Final Supplement,
IBR, CA, Environmental Water
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
Account (EWA) Project, Preferred
Alternative is Fixed Purchase
Alternative, Provide an Evaluation of
2004 Final EIS/EIR Environmental
Water Account (EWA) and Effects
Associated with Extending the
Current EWA’s through 2011, CA,
Wait Period Ends: 06/02/2008,
Contact: Sammie Cervantes 916–978–
5189.
EIS No. 20080159, Second Draft
Supplement, NOA, 00, Atlantic
Mackerel, Squid and Butterfish,
Fishery Management Plan,
Amendment No. 10, Develop a
Rebuilding Program that Allows the
Butterfish Stock to Rebuild in the
Shortest Amount of Time Possible,
Exclusive Economic Zone (EEZ) off
the U.S. Atlantic Coast, Comment
Period Ends: 06/16/2008, Contact:
Patricia A. Kurkul 978–281–9250.
EIS No. 20080160, Draft EIS, SFW, CA,
Cullinan Ranch Unit Restoration
Project, Proposing a Restoration Plan
for 1,500 Acres of Former Hayfield
Farm Land, San Pablo Bay, Issuance
of Permits and/or Approval from
Section 7 Endangered Species Act and
U.S. Army COE Section 404 Permit,
San Pablo Bay National Wildlife
Refuge, CA, Comment Period Ends:
06/17/2008, Contact: Christy Smith
707–769–4200.
EIS No. 20080161, Final EIS, NPS, 00,
Quarry Visitor Center Treatment
Project, To Address the Structural
Deterioration, Dinosaur National
Monument, CO and UT, Wait Period
Ends: 06/02/2008, Contact: Tom
Thomas 303–969–2310.
EIS No. 20080162, Draft EIS, FRC, MD,
Sparrows Point Liquefield Natural
Gas (LNG) Import Terminal
Expansion and Natural Gas Pipeline
Facilities, Construction and
Operation, Application Authorization,
U.S. COE Section 10 and 404 Permits,
Baltimore County, MD, Comment
Period Ends: 06/16/2008, Contact:
Andy Black 1–866–208–3372.
EIS No. 20080163, Draft EIS, AFS, AK,
Spencer Mineral Materials Project,
Proposal to Develop and Extract
Quarry Rock and Gravel from a Site
near Spencer Glacier, Chugach
National Forest, Kenal Borough, AK,
Comment Period Ends: 06/16/2008,
Contact: Alice Allen 605–673–4853.
EIS No. 20080164, Draft EIS, NRC, PA,
GENERIC—License Renewal of
Nuclear Plants, Supplement 35 to
NUREG–1437, Regarding
Susquehanna Steam Electric Station,
Units 1 and 2, Issuing Nuclear Power
Plant Operating Licenses for a 20-Year
Period, PA, Comment Period Ends:
07/21/2008, Contact: Drew
Stuyvenberg 301–415–4006.
E:\FR\FM\02MYN1.SGM
02MYN1
Federal Register / Vol. 73, No. 86 / Friday, May 2, 2008 / Notices
EIS No. 20080165, Draft EIS, FHW, 00,
Interstate 5 Columbia River Crossing
Project, Bridge, Transit, and Highway
Improvements, from State Route 500
in Vancouver, WA to Columbia
Boulevard in Portland, OR, Funding,
U.S. COE Section 10 & 404 Permits,
NPDES Permit, Comment Period
Ends: 07/01/2008, Contact: John
McAvoy 360–619–7591.
Amended Notices
EIS No. 20080134, Draft EIS, NPS, MI,
Sleeping Bear Dunes National
Lakeshore, General Management Plan
and Wilderness Study,
Implementation, Benzie and Leelanau
Counties, MI, Comment Period Ends:
06/13/2008, Contact: Nick Chevance
402–661–1844. Revision to FR Notice
Published 04/18/2008: Correction of
Comment from 6/02/2008 to 6/13/
2008
EIS No. 20080139, Draft EIS, FHW, MN,
Trunk Highway 23 and U.S. Highway
71 Project, Construction of One or
More Grade-Separated Bridge
Crossings, Dovre Township, Northeast
of Wilmar County, Kandiyohi, MN,
Comment Period Ends: 06/06/2008,
Contact: Lowell Flaten 320–214–6367.
Revision of FR Notice Published 04/
18/2008: Extending Comment Period
from 6/02/2008 to 06/06/2008.
Dated: April 29, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–9744 Filed 5–1–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8561–4; Docket ID No. EPA–HQ–ORD–
2008–0165]
Draft Toxicological Review of
Propionaldehyde: In Support of
Summary Information on the
Integrated Risk Information System
Environmental Protection
Agency (EPA).
ACTION: Notice of peer-review meeting.
mstockstill on PROD1PC66 with NOTICES
AGENCY:
SUMMARY: EPA is announcing that
Versar, Inc., an EPA contractor for
external scientific peer review, will
convene an independent panel of
experts and organize and conduct an
external peer-review meeting via
teleconference to review the external
review draft document titled,
‘‘Toxicological Review of
Propionaldehyde: In Support of
Summary Information on the Integrated
Risk Information System (IRIS)’’ (EPA/
635/R–08/003A). A 60-day public
VerDate Aug<31>2005
17:17 May 01, 2008
Jkt 214001
comment period for the draft document
was announced on March 6, 2008 (73
FR 12171–12172). The draft document
was prepared by the National Center for
Environmental Assessment (NCEA)
within EPA’s Office of Research and
Development. The public comment
period and the external peer-review
meeting are separate processes that
provide opportunities for all interested
parties to comment on the document.
EPA is releasing this draft document
solely for the purpose of predissemination peer review under
applicable information quality
guidelines. This document has not been
formally disseminated by EPA. It does
not represent and should not be
construed to represent any Agency
policy or determination.
Versar, Inc. invites the public to
register to attend this meeting as
observers. In addition, Versar, Inc.
invites the public to give oral and/or
provide written comments at the
meeting regarding the draft document
under review. The draft document and
EPA’s peer-review charge are available
primarily via the Internet on NCEA’s
home page under the Recent Additions
and the Data and Publications menus at
https://www.epa.gov/ncea. In preparing a
final report, EPA will consider the
Versar, Inc. report of the comments and
recommendations from the external
peer-review meeting and any public
comments that EPA receives.
DATES: The peer-review panel meeting
will begin on May 29, 2008, at 10:30
a.m. and end at 2:30 p.m. EST. As
announced on March 6, 2008 (73 FR
12171–12172), the 60-day public
comment period began March 6, 2008,
and ends May 5, 2008. Technical
comments should be in writing and
must be received by EPA by May 5,
2008.
ADDRESSES: The peer-review meeting
will be held via teleconference. The
EPA contractor, Versar, Inc., is
organizing, convening, and conducting
the peer-review meeting. To attend the
meeting, register by May 23, 2008, by
calling Versar, Inc. at 703–750–3000 ext.
316, sending a facsimile to 703–642–
6954, or sending an e-mail to
ssarraino@versar.com. You may also
register via the Internet at https://
epa.versar.com/propionaldehyde.
The draft ‘‘Toxicological Review of
Propionaldehyde: In Support of
Summary Information on the Integrated
Risk Information System (IRIS)’’ is
available primarily via the Internet on
the National Center for Environmental
Assessment’s home page under the
Recent Additions and the Data and
Publications menus at https://
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
24281
www.epa.gov/ncea. A limited number of
paper copies are available from the
Information Management Team, NCEA;
telephone: 703–347–8561; facsimile:
703–347–8691. If you are requesting a
paper copy, please provide your name,
mailing address, and the document title,
‘‘Toxicological Review of
Propionaldehyde: In Support of
Summary Information on the Integrated
Risk Information System (IRIS).’’ Copies
are not available from Versar, Inc.
FOR FURTHER INFORMATION CONTACT:
Questions regarding information,
registration, access or services for
individuals with disabilities, or logistics
for the external peer-review meeting
should be directed to Stephanie
Sarraino, Versar, Inc., Springfield, VA
22151; telephone: 703–750–3000 ext.
316; facsimile: 703–642–6954; e-mail
ssarraino@versar.com. To request
accommodation of a disability, please
contact Versar, Inc. preferably at least 10
days prior to the meeting, to give as
much time as possible to process your
request.
If you need technical information
about the document, please contact John
Stanek, National Center for
Environmental Assessment (NCEA);
telephone: 919–541–1048; facsimile:
919–541–0245; e-mail:
stanek.john@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Summary of Information About the
Project/Document
The draft Toxicological Review of
Propionaldehyde is a new assessment
and provides scientific information on
the effects pertaining to exposure to
propionaldehyde. Propionaldehyde was
nominated by the EPA Office of Air and
Radiation in 2000 and 2001 and by the
Office of Air Quality Planning and
Standards in 2003 as a chemical listed
for monitoring under the Clean Air Act.
Propionaldehyde is a colorless liquid
with a suffocating, fruity odor. It is used
in the manufacturing of propionic acid
and polyvinyl and other plastics, in the
synthesis of rubber chemicals, and as a
disinfectant and preservative. The
chemical is released to the environment
primarily through the combustion of
wood, gasoline, diesel fuel, and
polyethylene. Propionaldehyde is also a
component of cigarette smoke and a
food additive/flavoring agent. Although
no studies on the effects of
propionaldehyde administered by the
oral route have been performed, based
on its expected daily intake (below 1800
ug/day) and eventual metabolism in the
citric acid cycle, it does not appear to
be a safety concern for public health via
ingestion. Thus, the most probable route
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 73, Number 86 (Friday, May 2, 2008)]
[Notices]
[Pages 24280-24281]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9744]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6698-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 04/21/2008 through 04/25/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080155, Final EIS, AFS, MT, Cooney McKay Forest Health and
Fuels Reduction Project, Proposed to Restore Desirable Vegetative
Conditions, Swan Valley near Condon, Swan Lake Ranger District,
Flathead National Forest, Lake and Missoula Counties, MT, Wait Period
Ends: 06/02/2008, Contact: Joleen Dunham 406-837-7510.
EIS No. 20080156, Draft EIS, NRC, GA, GENERIC--License Renewal of
Nuclear Plants, Supplement 34 to NUREG-1437, Regarding Vogtle Electric
Generating Plant Units 1 and 2 (VEGP) near Waynesboro, GA, Comment
Period Ends: 07/16/2008, Contact: Justin P. Leous 301-415-2864.
EIS No. 20080157, Final EIS, AFS, WA, Gifford-Pinchot National Forest
and Columbia River Gorge National Scenic Area (Washington Portion)
Site-Specific Invasive Plant Treatment Project, Implementation,
Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA, Wait Period
Ends: 06/02/2008, Contact: Carol A. Chandler 360-891-5108.
EIS No. 20080158, Final Supplement, IBR, CA, Environmental Water
Account (EWA) Project, Preferred Alternative is Fixed Purchase
Alternative, Provide an Evaluation of 2004 Final EIS/EIR Environmental
Water Account (EWA) and Effects Associated with Extending the Current
EWA's through 2011, CA, Wait Period Ends: 06/02/2008, Contact: Sammie
Cervantes 916-978-5189.
EIS No. 20080159, Second Draft Supplement, NOA, 00, Atlantic Mackerel,
Squid and Butterfish, Fishery Management Plan, Amendment No. 10,
Develop a Rebuilding Program that Allows the Butterfish Stock to
Rebuild in the Shortest Amount of Time Possible, Exclusive Economic
Zone (EEZ) off the U.S. Atlantic Coast, Comment Period Ends: 06/16/
2008, Contact: Patricia A. Kurkul 978-281-9250.
EIS No. 20080160, Draft EIS, SFW, CA, Cullinan Ranch Unit Restoration
Project, Proposing a Restoration Plan for 1,500 Acres of Former
Hayfield Farm Land, San Pablo Bay, Issuance of Permits and/or Approval
from Section 7 Endangered Species Act and U.S. Army COE Section 404
Permit, San Pablo Bay National Wildlife Refuge, CA, Comment Period
Ends: 06/17/2008, Contact: Christy Smith 707-769-4200.
EIS No. 20080161, Final EIS, NPS, 00, Quarry Visitor Center Treatment
Project, To Address the Structural Deterioration, Dinosaur National
Monument, CO and UT, Wait Period Ends: 06/02/2008, Contact: Tom Thomas
303-969-2310.
EIS No. 20080162, Draft EIS, FRC, MD, Sparrows Point Liquefield Natural
Gas (LNG) Import Terminal Expansion and Natural Gas Pipeline
Facilities, Construction and Operation, Application Authorization, U.S.
COE Section 10 and 404 Permits, Baltimore County, MD, Comment Period
Ends: 06/16/2008, Contact: Andy Black 1-866-208-3372.
EIS No. 20080163, Draft EIS, AFS, AK, Spencer Mineral Materials
Project, Proposal to Develop and Extract Quarry Rock and Gravel from a
Site near Spencer Glacier, Chugach National Forest, Kenal Borough, AK,
Comment Period Ends: 06/16/2008, Contact: Alice Allen 605-673-4853.
EIS No. 20080164, Draft EIS, NRC, PA, GENERIC--License Renewal of
Nuclear Plants, Supplement 35 to NUREG-1437, Regarding Susquehanna
Steam Electric Station, Units 1 and 2, Issuing Nuclear Power Plant
Operating Licenses for a 20-Year Period, PA, Comment Period Ends: 07/
21/2008, Contact: Drew Stuyvenberg 301-415-4006.
[[Page 24281]]
EIS No. 20080165, Draft EIS, FHW, 00, Interstate 5 Columbia River
Crossing Project, Bridge, Transit, and Highway Improvements, from State
Route 500 in Vancouver, WA to Columbia Boulevard in Portland, OR,
Funding, U.S. COE Section 10 & 404 Permits, NPDES Permit, Comment
Period Ends: 07/01/2008, Contact: John McAvoy 360-619-7591.
Amended Notices
EIS No. 20080134, Draft EIS, NPS, MI, Sleeping Bear Dunes National
Lakeshore, General Management Plan and Wilderness Study,
Implementation, Benzie and Leelanau Counties, MI, Comment Period Ends:
06/13/2008, Contact: Nick Chevance 402-661-1844. Revision to FR Notice
Published 04/18/2008: Correction of Comment from 6/02/2008 to 6/13/2008
EIS No. 20080139, Draft EIS, FHW, MN, Trunk Highway 23 and U.S. Highway
71 Project, Construction of One or More Grade-Separated Bridge
Crossings, Dovre Township, Northeast of Wilmar County, Kandiyohi, MN,
Comment Period Ends: 06/06/2008, Contact: Lowell Flaten 320-214-6367.
Revision of FR Notice Published 04/18/2008: Extending Comment Period
from 6/02/2008 to 06/06/2008.
Dated: April 29, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-9744 Filed 5-1-08; 8:45 am]
BILLING CODE 6560-50-P