Environmental Impacts Statements; Notice of Availability, 24280-24281 [E8-9744]

Download as PDF 24280 Federal Register / Vol. 73, No. 86 / Friday, May 2, 2008 / Notices mstockstill on PROD1PC66 with NOTICES Whidbey Island, WA; Naval Air Station North Island, CA; Marine Corps Base HI and Kaneohe Bay, HI. Summary: EPA does not object to the proposed action. Rating LO. EIS No. 20080063, ERP No. DS–USN– K11119–HI. Hawaii Range Complex (HRC) Project, Additional Information, To Support and Maintain Navy Pacific Fleet Training, and Research, Development, Test, and Evaluation (RDT&E) Operations, Kauai, Honolulu, Maui and Hawaii Counties, HI. Summary: EPA expressed concerns about impacts to marine mammals from mid-frequency active (MFA) sonar. Rating EC2. EIS No. 20080084, ERP No. DS–AFS– J65448–UT. West Bear Vegetation Management Project, Additional Information To Improve a Portion of the Cumulative Effects Analysis and Correct the Soils Analysis, Timber Harvesting, Prescribed Burning, Roads Construction, Township 1 North, Range 9 East, Salt Lake Principle Meridian, Evanston Ranger District, Wasatch-Cache National Forest, Summit County, UT. Summary: This DSEIS responded adequately to our concerns on soil erosion and compactions; therefore, EPA does not object to the proposed action. Rating LO. EIS No. 20080096, ERP No. DS–NOA– K39102–CA. Cordell Bank, Gulf of the Farallones and Monterey Bay National Marine Sanctuaries, Updated Information, Proposes a Series of Regulatory Changes, Offshore of Northern/Central, CA. Summary: EPA does not object to the proposed project. Rating LO. Final EISs EIS No. 20080082, ERP No. F–AFS– L65542–ID. Cherry Dinner Project, Management of Vegetation, Hazardous Fuels, and Access Plus Watershed Improvements, Amendment to the Forest Plan, Palouse Ranger District, Clearwater National Forest, Latah County, ID. Summary: EPA does not object to the proposed action. EIS No. 20080085, ERP No. F–NPS– L65515–WA. Olympic National Park General Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA. Summary: No formal comment letter was sent to the preparing agency. EIS No. 20080100, ERP No. F–AFS– L65482–ID. Aspen Range Timber Sale and Vegetation Treatment Project, New Updated Version, Preferred Alternative is 5, Proposal To Treat Forested and Nonforested Vegetation, CaribouTarghee National Forest, Soda Springs Ranger District, Caribou County, ID. VerDate Aug<31>2005 17:17 May 01, 2008 Jkt 214001 Summary: EPA supports the Preferred Alternative that decreases roads in riparian areas and meets Forest Plan standards and guidelines including Goshawk Habitat. EIS No. 20080108, ERP No. FR–WPA– K08024–CA. Sacramento Area Voltage Support Project, Revision to FSEIS Filed February 2008, Selected Preferred Alternative B, Proposal to Build a Double-Circuit 230-kV Transmission Line, Placer, Sacramento and Sutter Counties, CA. Summary: No formal comment letter was sent to the preparing agency. Dated: April 29, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–9709 Filed 5–1–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6698–4] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 04/21/2008 through 04/25/2008 Pursuant to 40 CFR 1506.9. EIS No. 20080155, Final EIS, AFS, MT, Cooney McKay Forest Health and Fuels Reduction Project, Proposed to Restore Desirable Vegetative Conditions, Swan Valley near Condon, Swan Lake Ranger District, Flathead National Forest, Lake and Missoula Counties, MT, Wait Period Ends: 06/02/2008, Contact: Joleen Dunham 406–837–7510. EIS No. 20080156, Draft EIS, NRC, GA, GENERIC—License Renewal of Nuclear Plants, Supplement 34 to NUREG–1437, Regarding Vogtle Electric Generating Plant Units 1 and 2 (VEGP) near Waynesboro, GA, Comment Period Ends: 07/16/2008, Contact: Justin P. Leous 301–415– 2864. EIS No. 20080157, Final EIS, AFS, WA, Gifford-Pinchot National Forest and Columbia River Gorge National Scenic Area (Washington Portion) SiteSpecific Invasive Plant Treatment Project, Implementation, Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA, Wait Period Ends: 06/ 02/2008, Contact: Carol A. Chandler 360–891–5108. EIS No. 20080158, Final Supplement, IBR, CA, Environmental Water PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 Account (EWA) Project, Preferred Alternative is Fixed Purchase Alternative, Provide an Evaluation of 2004 Final EIS/EIR Environmental Water Account (EWA) and Effects Associated with Extending the Current EWA’s through 2011, CA, Wait Period Ends: 06/02/2008, Contact: Sammie Cervantes 916–978– 5189. EIS No. 20080159, Second Draft Supplement, NOA, 00, Atlantic Mackerel, Squid and Butterfish, Fishery Management Plan, Amendment No. 10, Develop a Rebuilding Program that Allows the Butterfish Stock to Rebuild in the Shortest Amount of Time Possible, Exclusive Economic Zone (EEZ) off the U.S. Atlantic Coast, Comment Period Ends: 06/16/2008, Contact: Patricia A. Kurkul 978–281–9250. EIS No. 20080160, Draft EIS, SFW, CA, Cullinan Ranch Unit Restoration Project, Proposing a Restoration Plan for 1,500 Acres of Former Hayfield Farm Land, San Pablo Bay, Issuance of Permits and/or Approval from Section 7 Endangered Species Act and U.S. Army COE Section 404 Permit, San Pablo Bay National Wildlife Refuge, CA, Comment Period Ends: 06/17/2008, Contact: Christy Smith 707–769–4200. EIS No. 20080161, Final EIS, NPS, 00, Quarry Visitor Center Treatment Project, To Address the Structural Deterioration, Dinosaur National Monument, CO and UT, Wait Period Ends: 06/02/2008, Contact: Tom Thomas 303–969–2310. EIS No. 20080162, Draft EIS, FRC, MD, Sparrows Point Liquefield Natural Gas (LNG) Import Terminal Expansion and Natural Gas Pipeline Facilities, Construction and Operation, Application Authorization, U.S. COE Section 10 and 404 Permits, Baltimore County, MD, Comment Period Ends: 06/16/2008, Contact: Andy Black 1–866–208–3372. EIS No. 20080163, Draft EIS, AFS, AK, Spencer Mineral Materials Project, Proposal to Develop and Extract Quarry Rock and Gravel from a Site near Spencer Glacier, Chugach National Forest, Kenal Borough, AK, Comment Period Ends: 06/16/2008, Contact: Alice Allen 605–673–4853. EIS No. 20080164, Draft EIS, NRC, PA, GENERIC—License Renewal of Nuclear Plants, Supplement 35 to NUREG–1437, Regarding Susquehanna Steam Electric Station, Units 1 and 2, Issuing Nuclear Power Plant Operating Licenses for a 20-Year Period, PA, Comment Period Ends: 07/21/2008, Contact: Drew Stuyvenberg 301–415–4006. E:\FR\FM\02MYN1.SGM 02MYN1 Federal Register / Vol. 73, No. 86 / Friday, May 2, 2008 / Notices EIS No. 20080165, Draft EIS, FHW, 00, Interstate 5 Columbia River Crossing Project, Bridge, Transit, and Highway Improvements, from State Route 500 in Vancouver, WA to Columbia Boulevard in Portland, OR, Funding, U.S. COE Section 10 & 404 Permits, NPDES Permit, Comment Period Ends: 07/01/2008, Contact: John McAvoy 360–619–7591. Amended Notices EIS No. 20080134, Draft EIS, NPS, MI, Sleeping Bear Dunes National Lakeshore, General Management Plan and Wilderness Study, Implementation, Benzie and Leelanau Counties, MI, Comment Period Ends: 06/13/2008, Contact: Nick Chevance 402–661–1844. Revision to FR Notice Published 04/18/2008: Correction of Comment from 6/02/2008 to 6/13/ 2008 EIS No. 20080139, Draft EIS, FHW, MN, Trunk Highway 23 and U.S. Highway 71 Project, Construction of One or More Grade-Separated Bridge Crossings, Dovre Township, Northeast of Wilmar County, Kandiyohi, MN, Comment Period Ends: 06/06/2008, Contact: Lowell Flaten 320–214–6367. Revision of FR Notice Published 04/ 18/2008: Extending Comment Period from 6/02/2008 to 06/06/2008. Dated: April 29, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–9744 Filed 5–1–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8561–4; Docket ID No. EPA–HQ–ORD– 2008–0165] Draft Toxicological Review of Propionaldehyde: In Support of Summary Information on the Integrated Risk Information System Environmental Protection Agency (EPA). ACTION: Notice of peer-review meeting. mstockstill on PROD1PC66 with NOTICES AGENCY: SUMMARY: EPA is announcing that Versar, Inc., an EPA contractor for external scientific peer review, will convene an independent panel of experts and organize and conduct an external peer-review meeting via teleconference to review the external review draft document titled, ‘‘Toxicological Review of Propionaldehyde: In Support of Summary Information on the Integrated Risk Information System (IRIS)’’ (EPA/ 635/R–08/003A). A 60-day public VerDate Aug<31>2005 17:17 May 01, 2008 Jkt 214001 comment period for the draft document was announced on March 6, 2008 (73 FR 12171–12172). The draft document was prepared by the National Center for Environmental Assessment (NCEA) within EPA’s Office of Research and Development. The public comment period and the external peer-review meeting are separate processes that provide opportunities for all interested parties to comment on the document. EPA is releasing this draft document solely for the purpose of predissemination peer review under applicable information quality guidelines. This document has not been formally disseminated by EPA. It does not represent and should not be construed to represent any Agency policy or determination. Versar, Inc. invites the public to register to attend this meeting as observers. In addition, Versar, Inc. invites the public to give oral and/or provide written comments at the meeting regarding the draft document under review. The draft document and EPA’s peer-review charge are available primarily via the Internet on NCEA’s home page under the Recent Additions and the Data and Publications menus at https://www.epa.gov/ncea. In preparing a final report, EPA will consider the Versar, Inc. report of the comments and recommendations from the external peer-review meeting and any public comments that EPA receives. DATES: The peer-review panel meeting will begin on May 29, 2008, at 10:30 a.m. and end at 2:30 p.m. EST. As announced on March 6, 2008 (73 FR 12171–12172), the 60-day public comment period began March 6, 2008, and ends May 5, 2008. Technical comments should be in writing and must be received by EPA by May 5, 2008. ADDRESSES: The peer-review meeting will be held via teleconference. The EPA contractor, Versar, Inc., is organizing, convening, and conducting the peer-review meeting. To attend the meeting, register by May 23, 2008, by calling Versar, Inc. at 703–750–3000 ext. 316, sending a facsimile to 703–642– 6954, or sending an e-mail to ssarraino@versar.com. You may also register via the Internet at https:// epa.versar.com/propionaldehyde. The draft ‘‘Toxicological Review of Propionaldehyde: In Support of Summary Information on the Integrated Risk Information System (IRIS)’’ is available primarily via the Internet on the National Center for Environmental Assessment’s home page under the Recent Additions and the Data and Publications menus at https:// PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 24281 www.epa.gov/ncea. A limited number of paper copies are available from the Information Management Team, NCEA; telephone: 703–347–8561; facsimile: 703–347–8691. If you are requesting a paper copy, please provide your name, mailing address, and the document title, ‘‘Toxicological Review of Propionaldehyde: In Support of Summary Information on the Integrated Risk Information System (IRIS).’’ Copies are not available from Versar, Inc. FOR FURTHER INFORMATION CONTACT: Questions regarding information, registration, access or services for individuals with disabilities, or logistics for the external peer-review meeting should be directed to Stephanie Sarraino, Versar, Inc., Springfield, VA 22151; telephone: 703–750–3000 ext. 316; facsimile: 703–642–6954; e-mail ssarraino@versar.com. To request accommodation of a disability, please contact Versar, Inc. preferably at least 10 days prior to the meeting, to give as much time as possible to process your request. If you need technical information about the document, please contact John Stanek, National Center for Environmental Assessment (NCEA); telephone: 919–541–1048; facsimile: 919–541–0245; e-mail: stanek.john@epa.gov. SUPPLEMENTARY INFORMATION: I. Summary of Information About the Project/Document The draft Toxicological Review of Propionaldehyde is a new assessment and provides scientific information on the effects pertaining to exposure to propionaldehyde. Propionaldehyde was nominated by the EPA Office of Air and Radiation in 2000 and 2001 and by the Office of Air Quality Planning and Standards in 2003 as a chemical listed for monitoring under the Clean Air Act. Propionaldehyde is a colorless liquid with a suffocating, fruity odor. It is used in the manufacturing of propionic acid and polyvinyl and other plastics, in the synthesis of rubber chemicals, and as a disinfectant and preservative. The chemical is released to the environment primarily through the combustion of wood, gasoline, diesel fuel, and polyethylene. Propionaldehyde is also a component of cigarette smoke and a food additive/flavoring agent. Although no studies on the effects of propionaldehyde administered by the oral route have been performed, based on its expected daily intake (below 1800 ug/day) and eventual metabolism in the citric acid cycle, it does not appear to be a safety concern for public health via ingestion. Thus, the most probable route E:\FR\FM\02MYN1.SGM 02MYN1

Agencies

[Federal Register Volume 73, Number 86 (Friday, May 2, 2008)]
[Notices]
[Pages 24280-24281]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9744]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6698-4]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 04/21/2008 through 04/25/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080155, Final EIS, AFS, MT, Cooney McKay Forest Health and 
Fuels Reduction Project, Proposed to Restore Desirable Vegetative 
Conditions, Swan Valley near Condon, Swan Lake Ranger District, 
Flathead National Forest, Lake and Missoula Counties, MT, Wait Period 
Ends: 06/02/2008, Contact: Joleen Dunham 406-837-7510.
EIS No. 20080156, Draft EIS, NRC, GA, GENERIC--License Renewal of 
Nuclear Plants, Supplement 34 to NUREG-1437, Regarding Vogtle Electric 
Generating Plant Units 1 and 2 (VEGP) near Waynesboro, GA, Comment 
Period Ends: 07/16/2008, Contact: Justin P. Leous 301-415-2864.
EIS No. 20080157, Final EIS, AFS, WA, Gifford-Pinchot National Forest 
and Columbia River Gorge National Scenic Area (Washington Portion) 
Site-Specific Invasive Plant Treatment Project, Implementation, 
Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA, Wait Period 
Ends: 06/02/2008, Contact: Carol A. Chandler 360-891-5108.
EIS No. 20080158, Final Supplement, IBR, CA, Environmental Water 
Account (EWA) Project, Preferred Alternative is Fixed Purchase 
Alternative, Provide an Evaluation of 2004 Final EIS/EIR Environmental 
Water Account (EWA) and Effects Associated with Extending the Current 
EWA's through 2011, CA, Wait Period Ends: 06/02/2008, Contact: Sammie 
Cervantes 916-978-5189.
EIS No. 20080159, Second Draft Supplement, NOA, 00, Atlantic Mackerel, 
Squid and Butterfish, Fishery Management Plan, Amendment No. 10, 
Develop a Rebuilding Program that Allows the Butterfish Stock to 
Rebuild in the Shortest Amount of Time Possible, Exclusive Economic 
Zone (EEZ) off the U.S. Atlantic Coast, Comment Period Ends: 06/16/
2008, Contact: Patricia A. Kurkul 978-281-9250.
EIS No. 20080160, Draft EIS, SFW, CA, Cullinan Ranch Unit Restoration 
Project, Proposing a Restoration Plan for 1,500 Acres of Former 
Hayfield Farm Land, San Pablo Bay, Issuance of Permits and/or Approval 
from Section 7 Endangered Species Act and U.S. Army COE Section 404 
Permit, San Pablo Bay National Wildlife Refuge, CA, Comment Period 
Ends: 06/17/2008, Contact: Christy Smith 707-769-4200.
EIS No. 20080161, Final EIS, NPS, 00, Quarry Visitor Center Treatment 
Project, To Address the Structural Deterioration, Dinosaur National 
Monument, CO and UT, Wait Period Ends: 06/02/2008, Contact: Tom Thomas 
303-969-2310.
EIS No. 20080162, Draft EIS, FRC, MD, Sparrows Point Liquefield Natural 
Gas (LNG) Import Terminal Expansion and Natural Gas Pipeline 
Facilities, Construction and Operation, Application Authorization, U.S. 
COE Section 10 and 404 Permits, Baltimore County, MD, Comment Period 
Ends: 06/16/2008, Contact: Andy Black 1-866-208-3372.
EIS No. 20080163, Draft EIS, AFS, AK, Spencer Mineral Materials 
Project, Proposal to Develop and Extract Quarry Rock and Gravel from a 
Site near Spencer Glacier, Chugach National Forest, Kenal Borough, AK, 
Comment Period Ends: 06/16/2008, Contact: Alice Allen 605-673-4853.
EIS No. 20080164, Draft EIS, NRC, PA, GENERIC--License Renewal of 
Nuclear Plants, Supplement 35 to NUREG-1437, Regarding Susquehanna 
Steam Electric Station, Units 1 and 2, Issuing Nuclear Power Plant 
Operating Licenses for a 20-Year Period, PA, Comment Period Ends: 07/
21/2008, Contact: Drew Stuyvenberg 301-415-4006.

[[Page 24281]]

EIS No. 20080165, Draft EIS, FHW, 00, Interstate 5 Columbia River 
Crossing Project, Bridge, Transit, and Highway Improvements, from State 
Route 500 in Vancouver, WA to Columbia Boulevard in Portland, OR, 
Funding, U.S. COE Section 10 & 404 Permits, NPDES Permit, Comment 
Period Ends: 07/01/2008, Contact: John McAvoy 360-619-7591.

Amended Notices

EIS No. 20080134, Draft EIS, NPS, MI, Sleeping Bear Dunes National 
Lakeshore, General Management Plan and Wilderness Study, 
Implementation, Benzie and Leelanau Counties, MI, Comment Period Ends: 
06/13/2008, Contact: Nick Chevance 402-661-1844. Revision to FR Notice 
Published 04/18/2008: Correction of Comment from 6/02/2008 to 6/13/2008
EIS No. 20080139, Draft EIS, FHW, MN, Trunk Highway 23 and U.S. Highway 
71 Project, Construction of One or More Grade-Separated Bridge 
Crossings, Dovre Township, Northeast of Wilmar County, Kandiyohi, MN, 
Comment Period Ends: 06/06/2008, Contact: Lowell Flaten 320-214-6367. 
Revision of FR Notice Published 04/18/2008: Extending Comment Period 
from 6/02/2008 to 06/06/2008.

    Dated: April 29, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E8-9744 Filed 5-1-08; 8:45 am]
BILLING CODE 6560-50-P