DC Energy Texas, LLC; DC Energy California, LLC; Notice of Issuance of Order, 23243 [E8-9299]
Download as PDF
Federal Register / Vol. 73, No. 83 / Tuesday, April 29, 2008 / Notices
you are interested in receiving an EA for
review and/or comment, please return
the Mailing List Return Mailer form
(appendix 2). If you do not return the
Return Mailer, you will be taken off the
mailing list. All individuals who
provide written comments will remain
on our environmental mailing list for
this project.
Additional Information
sroberts on PROD1PC70 with NOTICES
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to www.ferc.gov/
esubscribenow.htm. Any public
meetings or site visits scheduled for this
proposed project will be posted on the
Commission’s calendar located at https://
www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Finally, NWP has established an
Internet Web site for this project at
https://
www.coloradohubconnection.com/. The
Web site includes a project overview,
status, and answers to frequently asked
questions. You can also request
additional information by calling NWP
at 1–877–547–5304.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–9303 Filed 4–28–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
21:01 Apr 28, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER08–731–000; Docket Nos.
ER08–632–000, ER08–632–001]
DC Energy Texas, LLC; DC Energy
California, LLC; Notice of Issuance of
Order
April 22, 2008.
DC Energy Texas, LLC (DC Texas) and
DC Energy California, LLC (DC
California) filed applications for marketbased rate authority, with
accompanying rate schedules. The
proposed market-based rate schedules
provide for the sale of energy, capacity
and ancillary services at market-based
rates. DC Texas and DC California also
requested waivers of various
Commission regulations. In particular,
DC Texas and DC California requested
that the Commission grant blanket
approval under 18 CFR Part 34 of all
future issuances of securities and
assumptions of liability by DC Texas
and DC California.
On April 22, 2008, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development-West, granted the request
for blanket approval under Part 34
(Director’s Order). The Director’s Order
also stated that the Commission would
publish a separate notice in the Federal
Register establishing a period of time for
the filing of protests. Accordingly, any
person desiring to be heard concerning
the blanket approvals of issuances of
securities or assumptions of liability by
DC Texas and DC California, should file
a protest with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure. 18 CFR 385.211, 385.214
(2007). The Commission encourages the
electronic submission of protests using
the FERC Online link at https://
www.ferc.gov.
Notice is hereby given that the
deadline for filing protests is May 22,
2008.
Absent a request to be heard in
opposition to such blanket approvals by
the deadline above, DC Texas and DC
California are authorized to issue
securities and assume obligations or
liabilities as a guarantor, indorser,
surety, or otherwise in respect of any
security of another person; provided
that such issuance or assumption is for
some lawful object within the corporate
purposes of DC Texas and DC
California, compatible with the public
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
23243
interest, and is reasonably necessary or
appropriate for such purposes.
The Commission reserves the right to
require a further showing that neither
public nor private interests will be
adversely affected by continued
approvals of DC Texas’ and DC
California’s issuance of securities or
assumptions of liability.
Copies of the full text of the Director’s
Order are available from the
Commission’s Public Reference Room,
888 First Street, NE., Washington, DC
20426. The Order may also be viewed
on the Commission’s Web site at https://
www.ferc.gov, using the eLibrary link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document.
Comments, protests, and interventions
may be filed electronically via the
internet in lieu of paper. See, 18 CFR
385.2001(a) (1) (iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–9299 Filed 4–28–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–149–000]
Columbia Gulf Transmission
Company; Notice of Request Under
Blanket Authorization
April 21, 2008.
Take notice that on April 15, 2008,
Columbia Gulf Transmission Company
(Columbia Gulf), 5151 San Felipe, Suite
2500, Houston, Texas 77056, filed in
Docket No. CP08–149–00, a prior notice
request pursuant to sections 157.205,
157.208, and 157.212 of the Federal
Energy Regulatory Commission’s
regulations under the Natural Gas Act
for authorization to construct and
operate a new point of receipt to receive
revaporized liquefied natural gas (LNG)
from Kinder Morgan Louisiana Pipeline
LLC (KMLP), located in Evangeline
Parish, Louisiana, all as more fully set
forth in the application, which is on file
with the Commission and open to
public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
E:\FR\FM\29APN1.SGM
29APN1
Agencies
[Federal Register Volume 73, Number 83 (Tuesday, April 29, 2008)]
[Notices]
[Page 23243]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9299]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER08-731-000; Docket Nos. ER08-632-000, ER08-632-001]
DC Energy Texas, LLC; DC Energy California, LLC; Notice of
Issuance of Order
April 22, 2008.
DC Energy Texas, LLC (DC Texas) and DC Energy California, LLC (DC
California) filed applications for market-based rate authority, with
accompanying rate schedules. The proposed market-based rate schedules
provide for the sale of energy, capacity and ancillary services at
market-based rates. DC Texas and DC California also requested waivers
of various Commission regulations. In particular, DC Texas and DC
California requested that the Commission grant blanket approval under
18 CFR Part 34 of all future issuances of securities and assumptions of
liability by DC Texas and DC California.
On April 22, 2008, pursuant to delegated authority, the Director,
Division of Tariffs and Market Development-West, granted the request
for blanket approval under Part 34 (Director's Order). The Director's
Order also stated that the Commission would publish a separate notice
in the Federal Register establishing a period of time for the filing of
protests. Accordingly, any person desiring to be heard concerning the
blanket approvals of issuances of securities or assumptions of
liability by DC Texas and DC California, should file a protest with the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426, in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure. 18 CFR 385.211, 385.214
(2007). The Commission encourages the electronic submission of protests
using the FERC Online link at https://www.ferc.gov.
Notice is hereby given that the deadline for filing protests is May
22, 2008.
Absent a request to be heard in opposition to such blanket
approvals by the deadline above, DC Texas and DC California are
authorized to issue securities and assume obligations or liabilities as
a guarantor, indorser, surety, or otherwise in respect of any security
of another person; provided that such issuance or assumption is for
some lawful object within the corporate purposes of DC Texas and DC
California, compatible with the public interest, and is reasonably
necessary or appropriate for such purposes.
The Commission reserves the right to require a further showing that
neither public nor private interests will be adversely affected by
continued approvals of DC Texas' and DC California's issuance of
securities or assumptions of liability.
Copies of the full text of the Director's Order are available from
the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426. The Order may also be viewed on the Commission's
Web site at https://www.ferc.gov, using the eLibrary link. Enter the
docket number excluding the last three digits in the docket number
filed to access the document. Comments, protests, and interventions may
be filed electronically via the internet in lieu of paper. See, 18 CFR
385.2001(a) (1) (iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-9299 Filed 4-28-08; 8:45 am]
BILLING CODE 6717-01-P