Download as PDF Federal Register / Vol. 73, No. 81 / Friday, April 25, 2008 / Notices may be filed with the Board either before or after the meeting. Individuals who wish to make oral statements pertaining to agenda items should contact Gerri Flemming’s office at the address or telephone listed above. Requests must be received five days prior to the meeting and reasonable provision will be made to include the presentation in the agenda. The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Individuals wishing to make public comment will be provided a maximum of five minutes to present their comments. Minutes: Minutes will be available by writing or calling Gerri Flemming at the address or phone number listed above. Minutes will also be available at the following Web site: https://www.srs.gov/ general/outreach/srs-cab/srs-cab.html. Issued at Washington, DC on April 21, 2008. Rachel Samuel, Deputy Committee Management Officer. [FR Doc. E8–9083 Filed 4–24–08; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 733–010] Eric Jacobson; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments April 18, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Minor License. b. Project No.: 733–010. c. Date Filed: April 9, 2008. d. Applicant: Eric Jacobson. e. Name of Project: Ouray Hydroelectric Project. f. Location: The project is located on the Uncompahgre River in Ouray County, Colorado. The project occupies lands within the Uncompahgre National Forest managed by the U.S. Forest Service. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Eric Jacobson, P.O. Box 745, Telluride, CO 81435; (970) 369–4662. i. FERC Contact: Steve Hocking, (202) 502–8753 or steve.hocking@ferc.gov. j. This application is not ready for environmental analysis at this time. k. Project Description: The project consists of the following existing facilities: (1) A 0.48-acre reservoir formed by a 70-foot-long masonry gravity dam with a maximum height of 72 feet consisting of a 51-foot-long nonoverflow section and a 19-foot-wide spillway; (2) a 6,130-foot-long pressure pipeline; (3) a 32-by-65-foot powerhouse containing three turbine-generating units with a total authorized capacity of 632 kilowatts (kW); and (4) appurtenant facilities. The applicant proposes to upgrade turbine-generator unit No. 1 and add a fourth turbine-generator unit to increase the project’s total installed capacity to 775 kW. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction by contacting the applicant using the contact information in item (h) above. m. You may also register online at https://www.ferc.gov/esubscribenow.htm to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis ....................................................................................... Interventions, Recommendations, Terms and Conditions due ............................................................................................... Commission Issues Single Environmental Assessment (EA) ................................................................................................. EA Comments due .................................................................................................................................................................. Modified Terms and Conditions due ....................................................................................................................................... o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E8–9022 Filed 4–24–08; 8:45 am] sroberts on PROD1PC70 with NOTICES BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2197–073 North Carolina; Project No. 2206–030 North Carolina] Alcoa Power Generating, Inc.; Progress Energy Carolinas; Notice of Availability of the Final Environmental Impact Statement for the Yadkin Project and the Yadkin-Pee Dee River Project April 18, 2008. In accordance with the National Environmental Policy Act of 1969 and VerDate Aug<31>2005 20:20 Apr 24, 2008 Jkt 214001 PO 00000 Frm 00039 Fmt 4703 22359 Sfmt 4703 September 1, 2008. October 30, 2008. January 13, 2009. February 12, 2009. April 13, 2009. the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the applications for licenses for Alcoa Power Generating, Inc.’s 210-megawatt Yadkin Hydroelectric Project (Project No. 2197) and Progress Energy Carolina’s 108.6MW Yadkin-Pee Dee River Hydroelectric Project (Project No. 2206), located on the Yadkin and Pee Dee rivers in the counties of Davidson, Davie, Montgomery, Rowan, Stanly, Anson, and Richmond, near Charlotte, North Carolina. Based upon this review, E:\FR\FM\25APN1.SGM 25APN1

Agencies

[Federal Register Volume 73, Number 81 (Friday, April 25, 2008)]
[Notices]
[Page 22359]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9022]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No.: 733-010]


Eric Jacobson; Notice of Application Tendered for Filing With the 
Commission and Establishing Procedural Schedule for Licensing and 
Deadline for Submission of Final Amendments

April 18, 2008.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Minor License.
    b. Project No.: 733-010.
    c. Date Filed: April 9, 2008.
    d. Applicant: Eric Jacobson.
    e. Name of Project: Ouray Hydroelectric Project.
    f. Location: The project is located on the Uncompahgre River in 
Ouray County, Colorado. The project occupies lands within the 
Uncompahgre National Forest managed by the U.S. Forest Service.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Eric Jacobson, P.O. Box 745, Telluride, CO 
81435; (970) 369-4662.
    i. FERC Contact: Steve Hocking, (202) 502-8753 or 
steve.hocking@ferc.gov.
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The project consists of the following 
existing facilities: (1) A 0.48-acre reservoir formed by a 70-foot-long 
masonry gravity dam with a maximum height of 72 feet consisting of a 
51-foot-long non-overflow section and a 19-foot-wide spillway; (2) a 
6,130-foot-long pressure pipeline; (3) a 32-by-65-foot powerhouse 
containing three turbine-generating units with a total authorized 
capacity of 632 kilowatts (kW); and (4) appurtenant facilities. The 
applicant proposes to upgrade turbine-generator unit No. 1 and add a 
fourth turbine-generator unit to increase the project's total installed 
capacity to 775 kW.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at https://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov 
or toll-free at (866) 208-3676, or for TTY, (202) 502-8659. A copy is 
also available for inspection and reproduction by contacting the 
applicant using the contact information in item (h) above.
    m. You may also register online at https://www.ferc.gov/
esubscribenow.htm to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following Hydro Licensing Schedule. Revisions to the schedule 
may be made as appropriate.

------------------------------------------------------------------------
              Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready  September 1, 2008.
 for Environmental Analysis.
Interventions, Recommendations,       October 30, 2008.
 Terms and Conditions due.
Commission Issues Single              January 13, 2009.
 Environmental Assessment (EA).
EA Comments due.....................  February 12, 2009.
Modified Terms and Conditions due...  April 13, 2009.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-9022 Filed 4-24-08; 8:45 am]
BILLING CODE 6717-01-P