Alcoa Power Generating, Inc.; Progress Energy Carolinas; Notice of Availability of the Final Environmental Impact Statement for the Yadkin Project and the Yadkin-Pee Dee River Project, 22359-22360 [E8-9021]
Download as PDF
Federal Register / Vol. 73, No. 81 / Friday, April 25, 2008 / Notices
may be filed with the Board either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Gerri Flemming’s office at the
address or telephone listed above.
Requests must be received five days
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comment will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Gerri Flemming at the
address or phone number listed above.
Minutes will also be available at the
following Web site: https://www.srs.gov/
general/outreach/srs-cab/srs-cab.html.
Issued at Washington, DC on April 21,
2008.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E8–9083 Filed 4–24–08; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No.: 733–010]
Eric Jacobson; Notice of Application
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
April 18, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor
License.
b. Project No.: 733–010.
c. Date Filed: April 9, 2008.
d. Applicant: Eric Jacobson.
e. Name of Project: Ouray
Hydroelectric Project.
f. Location: The project is located on
the Uncompahgre River in Ouray
County, Colorado. The project occupies
lands within the Uncompahgre National
Forest managed by the U.S. Forest
Service.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Eric Jacobson,
P.O. Box 745, Telluride, CO 81435;
(970) 369–4662.
i. FERC Contact: Steve Hocking, (202)
502–8753 or steve.hocking@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The project
consists of the following existing
facilities: (1) A 0.48-acre reservoir
formed by a 70-foot-long masonry
gravity dam with a maximum height of
72 feet consisting of a 51-foot-long nonoverflow section and a 19-foot-wide
spillway; (2) a 6,130-foot-long pressure
pipeline; (3) a 32-by-65-foot powerhouse
containing three turbine-generating
units with a total authorized capacity of
632 kilowatts (kW); and (4) appurtenant
facilities. The applicant proposes to
upgrade turbine-generator unit No. 1
and add a fourth turbine-generator unit
to increase the project’s total installed
capacity to 775 kW.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659. A copy is also available for
inspection and reproduction by
contacting the applicant using the
contact information in item (h) above.
m. You may also register online at
https://www.ferc.gov/esubscribenow.htm
to be notified via email of new filings
and issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
n. Procedural Schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule
may be made as appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis .......................................................................................
Interventions, Recommendations, Terms and Conditions due ...............................................................................................
Commission Issues Single Environmental Assessment (EA) .................................................................................................
EA Comments due ..................................................................................................................................................................
Modified Terms and Conditions due .......................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–9022 Filed 4–24–08; 8:45 am]
sroberts on PROD1PC70 with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–073 North Carolina;
Project No. 2206–030 North Carolina]
Alcoa Power Generating, Inc.;
Progress Energy Carolinas; Notice of
Availability of the Final Environmental
Impact Statement for the Yadkin
Project and the Yadkin-Pee Dee River
Project
April 18, 2008.
In accordance with the National
Environmental Policy Act of 1969 and
VerDate Aug<31>2005
20:20 Apr 24, 2008
Jkt 214001
PO 00000
Frm 00039
Fmt 4703
22359
Sfmt 4703
September 1, 2008.
October 30, 2008.
January 13, 2009.
February 12, 2009.
April 13, 2009.
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the applications
for licenses for Alcoa Power Generating,
Inc.’s 210-megawatt Yadkin
Hydroelectric Project (Project No. 2197)
and Progress Energy Carolina’s 108.6MW Yadkin-Pee Dee River
Hydroelectric Project (Project No. 2206),
located on the Yadkin and Pee Dee
rivers in the counties of Davidson,
Davie, Montgomery, Rowan, Stanly,
Anson, and Richmond, near Charlotte,
North Carolina. Based upon this review,
E:\FR\FM\25APN1.SGM
25APN1
22360
Federal Register / Vol. 73, No. 81 / Friday, April 25, 2008 / Notices
the Office of Energy Projects has
prepared a Final Environmental Impact
Statement (final EIS) for the projects.
The final EIS contains staff’s
evaluation of the applicant’s proposal
and alternatives for relicensing the
Yadkin and Yadkin-Pee Dee River
Projects. The final EIS documents the
views of governmental agencies, nongovernmental organizations, affected
Indian tribes, the public, the license
applicants, and Commission staff.
A copy of the final EIS is available for
review in the Commission’s Public
Reference Branch, Room 2A, located at
888 First Street, NE., Washington, DC
20426. The final EIS also may be viewed
on the Commission’s Web site at
https://www.ferc.gov under the eLibrary
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document.
For assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact
Stephen Bowler at (202) 502–6861 or
stephen.bowler@ferc.gov or Lee Emery
at (202) 502–8379 or
lee.emery@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–9021 Filed 4–24–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–31–000]
Transcontinental Gas Pipe Line
Corporation; Notice of Availability of
the Environmental Assessment for the
Proposed Sentinel Expansion Project
sroberts on PROD1PC70 with NOTICES
April 18, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) of the
natural gas pipeline facilities proposed
by the Transcontinental Gas Pipe Line
Corporation (Transco) in the abovereferenced docket.
The EA was prepared to satisfy the
requirements of the National
Environmental Policy Act. The FERC
VerDate Aug<31>2005
20:20 Apr 24, 2008
Jkt 214001
staff concludes that approval of the
proposed project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The EA assesses the environmental
impacts of constructing and operating
the proposed Sentinel Expansion Project
(Project). The purpose of the proposed
Project is to provide approximately
142,000 dekatherms per day (Dt/d) of
natural gas delivery capacity to the
northeastern United States through the
replacement of existing facilities and the
addition of looping and compression
facilities along Transco’s existing
natural gas delivery system.
The EA has been placed in the public
files of the FERC. A limited number of
copies of the EA are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street,
NE., Room 2A, Washington, DC 20426,
(202) 502–8371.
Copies of the EA have been mailed to
federal, state, and local agencies, public
interest groups, interested individuals,
newspapers, and parties to this
proceeding.
Any person wishing to comment on
the EA may do so. To ensure
consideration prior to a Commission
decision on the proposal, it is important
that we receive your comments before
the date specified below.
Please note that the Commission
strongly encourages the electronic filing
of any comments or interventions or
protests to this proceeding, see 18 Code
of Federal Regulations
385.2001(a)(1)(iii) and the instructions
on the Commission’s Internet Web site
at https://www.ferc.gov under the link to
‘‘Documents and Filings’’ and ‘‘eFiling.’’
eFiling is a file attachment process and
requires that you prepare your
submission in the same manner as you
would if filing on paper, and save it to
a file on your hard drive. New eFiling
users must first create an account by
clicking on ‘‘Sign up’’ or ‘‘eRegister.’’
You will be asked to select the type of
filing you are making. This filing is
considered a ‘‘Comment on Filing.’’ In
addition, there is a ‘‘Quick Comment’’
option available, which is an easy
method for interested persons to submit
text-only comments on a project. The
Quick-Comment User Guide can be
viewed at https://www.ferc.gov/docsfiling/efiling/quick-comment-guide.pdf.
Quick Comment does not require a
FERC eRegistration account; however,
you will be asked to provide a valid email address. All comments submitted
under either eFiling or the Quick
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Comment option are placed in the
public record for the specified docket.
If you are filing written comments,
please carefully follow these
instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your comments to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
• Reference Docket No. CP08–31–
000;
• Label one copy of the comments for
the attention of the Gas Branch 2, PJ–
11.2; and
• Mail your comments so that they
will be received in Washington, DC on
or before May 19, 2008.
Comments will be considered by the
Commission but will not serve to make
the commentor a party to the
proceeding. Any person seeking to
become a party to the proceeding must
file a motion to intervene pursuant to
Rule 214 of the Commission’s Rules of
Practice and Procedures (18 CFR
385.214).1 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
comments considered.
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the eLibrary link. Click on the
eLibrary link, click on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
1 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
E:\FR\FM\25APN1.SGM
25APN1
Agencies
[Federal Register Volume 73, Number 81 (Friday, April 25, 2008)]
[Notices]
[Pages 22359-22360]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-9021]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2197-073 North Carolina; Project No. 2206-030 North
Carolina]
Alcoa Power Generating, Inc.; Progress Energy Carolinas; Notice
of Availability of the Final Environmental Impact Statement for the
Yadkin Project and the Yadkin-Pee Dee River Project
April 18, 2008.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the applications for licenses for Alcoa
Power Generating, Inc.'s 210-megawatt Yadkin Hydroelectric Project
(Project No. 2197) and Progress Energy Carolina's 108.6-MW Yadkin-Pee
Dee River Hydroelectric Project (Project No. 2206), located on the
Yadkin and Pee Dee rivers in the counties of Davidson, Davie,
Montgomery, Rowan, Stanly, Anson, and Richmond, near Charlotte, North
Carolina. Based upon this review,
[[Page 22360]]
the Office of Energy Projects has prepared a Final Environmental Impact
Statement (final EIS) for the projects.
The final EIS contains staff's evaluation of the applicant's
proposal and alternatives for relicensing the Yadkin and Yadkin-Pee Dee
River Projects. The final EIS documents the views of governmental
agencies, non-governmental organizations, affected Indian tribes, the
public, the license applicants, and Commission staff.
A copy of the final EIS is available for review in the Commission's
Public Reference Branch, Room 2A, located at 888 First Street, NE.,
Washington, DC 20426. The final EIS also may be viewed on the
Commission's Web site at https://www.ferc.gov under the eLibrary link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. For assistance, contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-
3676, or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
For further information, contact Stephen Bowler at (202) 502-6861
or stephen.bowler@ferc.gov or Lee Emery at (202) 502-8379 or
lee.emery@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-9021 Filed 4-24-08; 8:45 am]