Environmental Impact Statement: Franklin and Warren Counties, MO, 21685 [E8-8664]

Download as PDF Federal Register / Vol. 73, No. 78 / Tuesday, April 22, 2008 / Notices Issued in Chantilly, Virginia on April 4, 2008. Terry J. Page, Manager, Washington Airports District Office, Eastern Region. [FR Doc. E8–8580 Filed 4–21–08; 8:45 am] BILLING CODE 4910–13–M DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Franklin and Warren Counties, MO Federal Highway Administration (FHWA), DOT. ACTION: Notice of intent. sroberts on PROD1PC70 with NOTICES AGENCY: SUMMARY: The FHWA is issuing this notice to advise the public that an environmental impact statement (EIS) will be prepared for proposed improvements to Route 47 between Route 94 in Warren County and Fifth Street in the city of Washington in Franklin County, Missouri. FOR FURTHER INFORMATION CONTACT: Ms. Peggy Casey, Environmental Projects Engineer, FHWA Division Office, 3220 West Edgewood, Suite H, Jefferson City, MO 65109, Telephone: (573) 636–7104; or Mr. Kevin Keith, Chief Engineer, Missouri Department of Transportation, P.O. Box 270, Jefferson City, MO 65102, Telephone: (573) 751–2803. SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Missouri Department of Transportation (MoDOT), will prepare an EIS for the replacement of the existing bridge over the Missouri River and relocation or reconstruction of Route 47 between Route 94 in Warren County and Fifth Street in the city of Washington in Franklin County, Missouri. A location study will run concurrently with the preparation of the EIS and will provide definitive alternatives for evaluation in the EIS. The EIS will fully analyze the issues, problems, and potential social and environmental impacts associated with improving or realigning Route 47 and constructing a new bridge. The goals of the proposed action are to improve safety, reduce congestion, and improve the reliability of Route 47 during Missouri River flood events. The proposed project is located between Route 94 on the north in Warren County and Fifth Street on the south in the city of Washington in Franklin County. The project is approximately 4 miles in length. Alternatives under consideration include (1) no build; (2) bridge replacement on existing location with VerDate Aug<31>2005 16:25 Apr 21, 2008 Jkt 214001 improvements to the existing alignment; and (3) new alignments. To date, preliminary information has been issued to local officials. As part of the scoping process, an interagency coordination meeting will be held with federal and state resource agencies. In addition, informational meetings with the public and community representatives will be held to solicit input on the project and reasonable range of alternatives. A location public hearing will be held to present the findings of the draft EIS (DEIS). Public notice will be given announcing the time and place of all public meetings and the hearing. The DEIS will be available for public and agency review and comment prior to the public hearing. To ensure that the full range of issues related to this proposed action are addressed and all significant issues are identified, comments and suggestions are invited from all interested parties. Comments and questions concerning this proposed action and the EIS should be directed to the FHWA or MoDOT at the addresses provided above. Concerns in the study area include potential impacts to natural resources, cultural resources, and neighborhoods at the southern end of the study area. Improvements to the existing alignment could impact cultural resources and adjacent residences. Realignment of Route 47 with a new bridge location would have increased cost and natural (floodplain, wetland) and human impacts. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.) Issued on: April 16, 2008. Peggy J. Casey, Environmental Projects Engineer, Jefferson City. [FR Doc. E8–8664 Filed 4–21–08; 8:45 am] BILLING CODE 4910–22–P PO 00000 Frm 00107 Fmt 4703 Sfmt 4703 21685 DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration [Docket No. FMCSA–2008–0038] Agency Information Collection Activities; New Information Collection: Survey of Over-the-Road Bus Companies About Accessible Transportation for Individuals With Disabilities Federal Motor Carrier Safety Administration (FMCSA), DOT. ACTION: Notice and request for comments. AGENCY: SUMMARY: The FMCSA invites comments about our intention to request the Office of Management and Budget (OMB) to approve a new Information Collection Request (ICR). The new ICR is associated with a review of the Americans with Disabilities Act of 1990 (ADA) implementing regulations for over-the-road bus companies, contained in 49 CFR part 37 subpart H. The regulatory review is required by section 37.215. The collected information would assist DOT with the decision to modify or retain the requirements contained in the ADA regulations. This notice is required by the Paperwork Reduction Act of 1995. DATES: Comments must be submitted on or before June 23, 2008. ADDRESSES: You may submit comments bearing the Department of Transportation (DOT) Docket Management System (DMS) Docket Number FMCSA Docket Number FMCSA–2008–0038 using any of the following methods: • Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the on-line instructions for submitting comments. • Mail: Docket Management Facility; U.S. Department of Transportation, 1200 New Jersey Avenue, SE., West Building Ground Floor, Room W12–140, Washington, DC 20590–0001. • Hand Delivery: West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590–0001 between 9 a.m. and 5 p.m., e.t., Monday through Friday, except Federal Holidays. • Fax: 1–202–493–2251. Each submission must include the Agency name and the docket number for this Notice. Note that DOT posts all comments received without change to https://www.regulations.gov, including any personal information included in a comment. Please see the Privacy Act heading below: E:\FR\FM\22APN1.SGM 22APN1

Agencies

[Federal Register Volume 73, Number 78 (Tuesday, April 22, 2008)]
[Notices]
[Page 21685]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-8664]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration


Environmental Impact Statement: Franklin and Warren Counties, MO

AGENCY: Federal Highway Administration (FHWA), DOT.

ACTION: Notice of intent.

-----------------------------------------------------------------------

SUMMARY: The FHWA is issuing this notice to advise the public that an 
environmental impact statement (EIS) will be prepared for proposed 
improvements to Route 47 between Route 94 in Warren County and Fifth 
Street in the city of Washington in Franklin County, Missouri.

FOR FURTHER INFORMATION CONTACT: Ms. Peggy Casey, Environmental 
Projects Engineer, FHWA Division Office, 3220 West Edgewood, Suite H, 
Jefferson City, MO 65109, Telephone: (573) 636-7104; or Mr. Kevin 
Keith, Chief Engineer, Missouri Department of Transportation, P.O. Box 
270, Jefferson City, MO 65102, Telephone: (573) 751-2803.

SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Missouri 
Department of Transportation (MoDOT), will prepare an EIS for the 
replacement of the existing bridge over the Missouri River and 
relocation or reconstruction of Route 47 between Route 94 in Warren 
County and Fifth Street in the city of Washington in Franklin County, 
Missouri. A location study will run concurrently with the preparation 
of the EIS and will provide definitive alternatives for evaluation in 
the EIS. The EIS will fully analyze the issues, problems, and potential 
social and environmental impacts associated with improving or 
realigning Route 47 and constructing a new bridge. The goals of the 
proposed action are to improve safety, reduce congestion, and improve 
the reliability of Route 47 during Missouri River flood events.
    The proposed project is located between Route 94 on the north in 
Warren County and Fifth Street on the south in the city of Washington 
in Franklin County. The project is approximately 4 miles in length.
    Alternatives under consideration include (1) no build; (2) bridge 
replacement on existing location with improvements to the existing 
alignment; and (3) new alignments.
    To date, preliminary information has been issued to local 
officials. As part of the scoping process, an interagency coordination 
meeting will be held with federal and state resource agencies. In 
addition, informational meetings with the public and community 
representatives will be held to solicit input on the project and 
reasonable range of alternatives. A location public hearing will be 
held to present the findings of the draft EIS (DEIS). Public notice 
will be given announcing the time and place of all public meetings and 
the hearing. The DEIS will be available for public and agency review 
and comment prior to the public hearing.
    To ensure that the full range of issues related to this proposed 
action are addressed and all significant issues are identified, 
comments and suggestions are invited from all interested parties. 
Comments and questions concerning this proposed action and the EIS 
should be directed to the FHWA or MoDOT at the addresses provided 
above. Concerns in the study area include potential impacts to natural 
resources, cultural resources, and neighborhoods at the southern end of 
the study area. Improvements to the existing alignment could impact 
cultural resources and adjacent residences. Realignment of Route 47 
with a new bridge location would have increased cost and natural 
(floodplain, wetland) and human impacts.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction. The regulations implementing 
Executive Order 12372 regarding intergovernmental consultation on 
Federal programs and activities apply to this program.)

    Issued on: April 16, 2008.
Peggy J. Casey,
Environmental Projects Engineer, Jefferson City.
[FR Doc. E8-8664 Filed 4-21-08; 8:45 am]
BILLING CODE 4910-22-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.