Notice of Quarterly Report (October 1, 2007-December 31, 2007), 21381-21389 [E8-8590]
Download as PDF
21381
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
you need more time to comment, you
must request it in writing, including
reasons for the request. OSHA must
receive your written request for
extension at the address provided above
no later than the last date for comments.
OSHA will limit any extension to 30
days, unless the requester justifies a
longer period. You may obtain or review
documents related to this notice, as
received, by contacting OSHA’s Docket
Office (see ADDRESSES section above).
Docket No. OSHA–2007–0053 contains
all materials in the record concerning
OSHA’s NRTL SNAP Program.
OSHA will review all timely
comments and determine whether any
of them merit modification of the
elements of SNAP or delay in its
implementation.
Signed at Washington, DC, this 15th day of
April, 2008.
Edwin G. Foulke, Jr.,
Assistant Secretary of Labor for Occupational
Safety and Health.
[FR Doc. E8–8430 Filed 4–18–08; 8:45 am]
BILLING CODE 4510–26–P
MILLENNIUM CHALLENGE
CORPORATION
[MCC FR 08–03]
Notice of Quarterly Report (October 1,
2007—December 31, 2007)
quarter October 1, 2007 through
December 31, 2007 with respect to both
assistance provided under Section 605
of the Millennium Challenge Act of
2003 (Pub. L. 108–199, Division D (the
Act)), and transfers or allocations of
funds to other federal agencies pursuant
to Section 619(b) of the Act. The
following report shall be made available
to the public by means of publication in
the Federal Register and on the Internet
Web site of the MCC (https://
www.mcc.gov) in accordance with
Section 612(b) of the Act.
Millennium Challenge
Corporation.
SUMMARY: The Millennium Challenge
Corporation (MCC) is reporting for the
AGENCY:
ASSISTANCE PROVIDED UNDER SECTION 605
Projects
Obligated
Cumulative
disbursements
Objectives
Measures
Country: Madagascar
Year: 2008
Entity to which the assistance is provided: MCA Madagascar
Total Quarterly Disbursement: $0
$37,803,000 ............
Increase Land Titling and
Security.
$4,308,910 ..............
Finance Project ..........
$35,888,000 ............
Increase Competition in the
Financial Sector.
$3,599,784 ..............
Agricultural Business
Investment Project.
rwilkins on PROD1PC63 with NOTICES
Land Tenure Project ..
$17,683,000 ............
Improve Agricultural Projection Technologies and
Market Capacity in Rural
Areas.
$4,819,510 ..............
VerDate Aug<31>2005
16:59 Apr 18, 2008
Jkt 214001
PO 00000
Frm 00079
Fmt 4703
Sfmt 4703
Legislative proposal reflecting the National Land Tenure Program submitted
to Parliament and passed.
Number of land disputes reported and resolved in the target zones and sites of
implementation.
Percentage of land documents inventoried, restored, and/or digitized.
Average time and cost required to carry
out property transactions.
Percent of reported land conflicts resolved on titled land in zone 3, 4, 5
during the title regularization operations
Percentage of land in the zones that is
demarcated and ready for titling.
The number of savings accounts and outstanding value of accounts from primary banks.
Maximum check clearing delay.
Volume of funds in payment system and
number of transactions.
Increased public awareness of new financial instruments as measured by surveys within intervention zones and
large towns.
The amount of government debt issued
with maturities in excess of 52 weeks.
The number of new individual investors
buying government debt securities.
The number of bank branches of the
Central Bank of Madagascar capable
of accepting auction tenders.
Percentage of all loans included in the
central database.
Number of rural producers receiving or
soliciting information from Agricultural
Business Centers about the opportunities.
Intervention zones identified and description of beneficiaries within each zone
submitted.
Number of visitors receiving information
from National Coordinating Center with
respect to business opportunities.
E:\FR\FM\21APN1.SGM
21APN1
21382
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Cumulative
disbursements
Objectives
Measures
Change in farm income due to improved
production and marketing practices.
Change in enterprise income due to improved production and marketing practices.
Number of farmers and business employing technical assistance received.
Program
Administration* and
Control, Monitoring
and Evaluation.
Pending subsequent
reports**.
$18,399,000 ............
...............................................
$9,361,121
.................................
...............................................
$640,940
Country: Honduras
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA Honduras
Total Obligation: $215,000,000
Total Quarterly Disbursement: $3,952,445
Rural Development
Project.
$70,687,000 ............
Increase the productivity and
business skills of farmers
who operate small and
medium-size farms and
their employees.
$9,461,696 ..............
Transportation Project
$127,208,000 ..........
$1,929,507 ..............
Program
Administration* and
Control, Monitoring
and Evaluation.
Pending subsequent
reports**.
$17,105,000 ............
Reduce transportation costs
between targeted production centers and national,
regional and global markets.
...............................................
.................................
...............................................
Increase in farm income resulting from
Rural Development Project.
Funds lent by MCA-Honduras to financial
institutions.
Increase in employment income resulting
from Rural Development Project.
Number of Program farmers harvesting
high-value horticulture crops.
Number of hectares harvesting high-value
horticulture crops.
Freight shipment cost from Tegucigalpa
to Puerto Cortes.
Price of basic food basket.
Number of days per year road is passable.
$1,577,787
$2,376,136
Country: Cape Verde
Year: 2008
Entity to which the assistance is provided: MCA Cape Verde
Total Quarterly Disbursement: $0
$10,848,630 ............
Infrastructure Improvement.
$78,760,208 ............
Private Sector Development.
rwilkins on PROD1PC63 with NOTICES
Watershed and Agricultural Support.
$7,200,000 ..............
Program
Administration* and
Control, Monitoring
and Evaluation.
Pending subsequent
reports**.
VerDate Aug<31>2005
Increase agricultural production in three targeted watershed areas on three islands.
Increase integration of the internal market and reduce
transportation costs.
$291,362 .................
Increase in horticultural productivity.
Increase in annual income.
Value-added for farms and agribusiness.
$6,154,186 ..............
$14,641 ...................
$13,269,650 ............
Spur private sector development on all islands through
increased investment in
the priority sectors and
through financial sector reform.
...............................................
Volume of goods shipped between Praia
and other islands.
Mobility Ratio: Percentage of beneficiary
population who take at least 5 trips per
month.
Savings on transport costs from improvements.
Value added in priority sectors above current trends.
Volume of private investment in priority
sectors above current trends.
.................................
...............................................
$3,694,566
16:59 Apr 18, 2008
Jkt 214001
PO 00000
Frm 00080
Fmt 4703
$3,775,862 ..............
Sfmt 4703
E:\FR\FM\21APN1.SGM
21APN1
21383
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Cumulative
disbursements
Objectives
Country: Nicaragua
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA Nicaragua
Total Obligation: $175,000,000
Total Quarterly Disbursement: $4,669,211
Property Regularization Project.
$26,400,000 ............
Increase investment by
strengthening property
rights.
$1,358,563 ..............
Transportation Project
$92,800,000 ............
$33,500,000 ............
Reduce transportation costs
between Leon and
Chinandega and national,
regional and global markets.
Increase the value added of
farms and enterprises in
the region.
$2,573,281 ..............
Rural Business Development Project.
Program Administration,* Due Diligence,
Monitoring and
Evaluation.
Pending subsequent
reports**.
$22,300,000 ............
...............................................
$4,169,032
.................................
...............................................
$2,256,236
Country: Georgia
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA Georgia
$3,997,215 ..............
Value of investment on land.
Value of urban land.
Value of rural land.
Number of days to conduct a land transaction.
Total cost to conduct a land transaction.
Price of a basket of goods.
Travel Time.
Annual percentage increase in valueadded of clients of business office.
Number of jobs created.
Number of program farm plots harvesting
higher-value crops or reforesting under
improvement of Water Supply Activities.
Total Obligation: $294,693,400
Total Quarterly Disbursement: $8,618,845
Regional Infrastructure
Rehabilitation.
$211,700,000 ..........
Key Regional Infrastructure
Rehabilitated.
$16,722,162 ............
Regional Enterprise
Development.
rwilkins on PROD1PC63 with NOTICES
Measures
$47,500,000 ............
Enterprises in Regions Developed.
$6,190,868 ..............
Program Administration,* Due Diligence,
Monitoring and
Evaluation.
Pending subsequent
reports**.
35,493,400 ..............
...............................................
$7,395,795
.................................
...............................................
$8,347,230
VerDate Aug<31>2005
16:59 Apr 18, 2008
Jkt 214001
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
Reduction in Akhalkalaki-NinotsmindaTeleti journey time.
Reduction in vehicle operating costs.
Increase in internal regional traffic volumes.
Decreased technical losses in gas
through the main North-South pipeline.
Reduction in the production of greenhouse gas emissions measured in tons
of CO2 equivalent.
Increased collection rate of the Georgian
Gas Company (GOGC).
Number of household beneficiaries
served by Regional Infrastructure Development projects.
Actual operations and maintenance expenditures.
Increase in annual revenue in portfolio
companies.
Increase in number of portfolio company
employees and number of local suppliers.
Increase in portfolio companies’ wages
and payments to local suppliers.
Jobs created.
Increase in aggregate incremental net
revenue to project assisted firms.
Direct household net income.
Direct household net income for market
information initiative beneficiaries.
Number of beneficiaries.
E:\FR\FM\21APN1.SGM
21APN1
21384
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Cumulative
disbursements
Objectives
Measures
Country: Vanuatu
Year: 2008
Quarter 1
Total Obligation: $65,690,000
Entity to which the assistance is provided: MCA Vanuatu
Total Quarterly Disbursement: $0
Transportation Infrastructure Project.
$60,615,232 ............
Facilitate transportation to increase tourism and business development.
Program Administration,* Due Diligence,
Monitoring and
Evaluation.
Pending subsequent
reports**.
$5,074,768 ..............
..........................................
$1,608,111
.............................
..........................................
$334,812
Country: Armenia
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA Armenia
$63,685 ...................
Total Obligation: $235,650,000
Total Quarterly Disbursement: $3,327,390
Irrigated Agriculture
Project (Agriculture
and Water).
$145,690,000 ..........
Increase agricultural productivity Improve and Quality
of Irrigation.
$5,634,541 ..............
Rural Road Rehabilitation Project.
$67,100,000 ............
Better access to economic
and social infrastructure.
$1,378,446 ..............
.............................
Program Administration,* Due Diligence,
Monitoring and
Evaluation.
Pending subsequent
reports **.
$22,870,000 ............
..........................................
.............................
..........................................
rwilkins on PROD1PC63 with NOTICES
VerDate Aug<31>2005
Increase in hectares covered by high
value added horticultural and fruit
crops.
Percentage of respondents satisfied with
irrigation services.
Share of Water User Association water
charges as percentage of Water User
Association annual operations and
maintenance costs.
Number of farmers using improved onfarm water management practices.
Annual increase in irrigated land in
Project area.
State budget expenditures on maintenance of irrigation system.
Value of loans provided under the
project.
Government budgetary allocations for
routine maintenance of the entire road
network
Average daily traffic in Project area.
Kilometers of Package 1 road sections
rehabilitated.
Kilometers of Package 2 road sections
rehabilitated.
Kilometers of Package 3 road sections
rehabilitated.
$2,732,235 ..............
$1,515,257
Country: Benin
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA Benin
Access to Financial
Services.
Number of Tourists.
Number of days per year road is closed.
Number of S-W Bay, Malekula flights
cancelled per year due to flooding.
Vessel wait time at wharf.
$19,650,000 ............
16:59 Apr 18, 2008
Jkt 214001
Expand Access to Financial
Services.
PO 00000
Frm 00082
Fmt 4703
Total Obligation: $307,298,040
Total Quarterly Disbursement: $4,044,765
$443,003 .................
Sfmt 4703
Operational self-sufficiency of participating microfinance institutions.
Number of microfinance institutions supervised by the microfinance cellule.
Total incremental increase in value of
new credit extended and savings received by financial institutions participating in the project.
Share value of all loans outstanding that
have one or more installments of principal over 30 days past due.
Total number of loans guaranteed by
land titles per year.
E:\FR\FM\21APN1.SGM
21APN1
21385
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Cumulative
disbursements
Measures
Improved Ability of Justice
System to Enforce Contracts and Reconcile
Claims.
$251,766 .................
$36,020,000 ............
Strengthen property rights
and increase investment in
rural and urban land.
$2,299,452 ..............
Access to Markets .....
$169,447,000 ..........
$1,773,328 ..............
Program Administration,* Due Diligence,
Monitoring and
Evaluation.
Pending subsequent
reports**.
$47,911,040 ............
Improve Access to Markets
through Improvements to
the Port of Cotonou.
...............................................
Number of cases processed at the arbitration center.
Percentage of all cases in the ‘‘Tribunal
de Premiere Instance’’ courts per year.
Percentage of all cases resolved in court
of appeals per year.
Average distance to reach TPI.
Number of enterprises registered through
the registration center.
Average number of days required to register an enterprise.
Total value of additional investments in
target rural land parcels.
Total value of additional investments in
target urban land parcels.
Total metric tons of exports and imports
passing through Port of Cotonou per
year.
.................................
...............................................
$8,126,902
Projects
Obligated
Objectives
Access to Justice .......
$34,270,000 ............
Access to Land ..........
Country: Ghana
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA Ghana
$4,577,954
Total Obligation: $547,009,000
Total Quarterly Disbursement: $4,100,398
$242,352,550 ..........
Enhance Profitability of cultivation, services to agriculture and product handling in support of the expansion of commercial agriculture among groups of
smallholder farms.
$2,743,432 ..............
Rural Development ....
$101,288,000 ..........
Strengthen the rural institutions that provide services
complementary to, and
supportive of, agricultural
and agriculture business
development.
$136,369 .................
Transportation ............
rwilkins on PROD1PC63 with NOTICES
Agriculture Project .....
$141,735,500 ..........
Reduce the transportation
costs affecting agriculture
commerce at sub-regional
levels.
$30,424 ...................
Program Administration,* Due Diligence,
Monitoring and
Evaluation.
$61,632,950 ............
...............................................
$3,257,906 ..............
VerDate Aug<31>2005
16:59 Apr 18, 2008
Jkt 214001
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
Number of hectares irrigated.
Number of days to conduct a land transaction.
Number of land disputes in the pilot registration districts.
Registration of land rights in the pilot registration districts.
Metric tons of products passing through
post-harvest treatment.
Portfolio-at-risk of agriculture loan fund.
Value of loans disbursed to clients from
agricultural loan fund.
Number of additional loans.
Vehicle operating costs on minor, medium and major rehabilitated roads.
Time/ quality per procurement.
Score card of citizen satisfaction with
services.
Gross enrollment rates.
Gender parity in school enrollment.
Distance to collect water.
Time to collect water.
Distance to sanitation facility.
Travel time to sanitation facility.
Incidence of guinea worm, diarrhea or
bilharzias.
Average number of days lost due to guinea worm, diarrhea or bilharzias.
Percentage of households, schools, and
agricultural processing plants in target
districts with electricity.
Number of inter-bank transactions.
Value of deposit accounts in rural banks.
Volume capacity ratio.
Vehicles per hour at peak hour.
Travel time at peak hour.
International roughness index.
Annual average daily vehicle and passenger traffic.
E:\FR\FM\21APN1.SGM
21APN1
21386
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Cumulative
disbursements
Obligated
Pending subsequent
reports**.
Objectives
.................................
...............................................
$7,272,608
Country: El Salvador
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA El Salvador
Total Obligation: $460,939,996
Total Quarterly Disbursement: $1,810,602
Human Development
Project.
$91,674,603 ............
Increase human and physical
capital of residents of the
Northern Zone to take advantage of employment
and business opportunities.
$0 ............................
Productive Development Project.
$84,196,330 ............
$234,963,039 ..........
Increase production and employment in the Northern
Zone.
Reduce travel cost and time
within the Northern Zone,
with the rest of the country, and within the region.
$0 ............................
Connectivity Project ...
$0 ............................
Program Administration * and Control,
Monitoring and
Evaluation.
Pending Subsequent
Report **.
$50,106,024 ............
...............................................
$0.
.................................
...............................................
$4,034,819
Country: Mali
Year: 2008
Quarter 1
Entity to which the assistance is provided: MCA Mali
$89,631,177 ............
Establish an independent
$263,697 .................
and secure link to the regional and global economy.
Industrial Park Project
$94,563,559 ............
Develop a platform for industrial activity to be located
within the Airport domain..
$529,093 .................
Alatona Irrigation
Project.
$234,674,675 ..........
Increase the agricultural production and productivity in
the Alatona zone of the
ON..
$0 ............................
VerDate Aug<31>2005
18:14 Apr 18, 2008
Jkt 214001
PO 00000
Frm 00084
Fmt 4703
Number of students enrolled in the
Chalatenango Center functioning as a
MEGATEC institute.
Graduation rate of students enrolled in
the Chalatenango Center functioning
as a MEGATEC institute.
Number of students enrolled in participating middle technical schools.
Graduation rate of students enrolled in
participating middle technical schools.
Number of students enrolled in non-formal training activities.
Graduation rate of students enrolled in
non-formal training activities.
Number of households with access to
water in the Northern Zone.
Number of households with access to
basic sanitation in the Northern Zone.
Number of households with electricity in
the Northern Zone.
Number of individuals that benefit annually from the strategic infrastructure
projects.
Investment in productive chains by selected beneficiaries.
Weighted average of the International
Roughness Index for the rehabilitation
of the Transnational Highway.
Weighted average of the International
Roughness Index for the rehabilitation
of the network of connecting roads.
Total Obligation $460,684,411
Total Quarterly Disbursement: $1,485,669
´
Bamako Senou Airport
Improvement
Project.
rwilkins on PROD1PC63 with NOTICES
Measures
Sfmt 4703
Number of weekly flight arrivals and departures.
Average time for passengers to complete
departures and arrivals procedures.
Occupancy level.
Average number of days required for operator to connect to Industrial Park
water and electricity services.
Weighted average of the International
Roughness Index for the rehabilitation
of the Niono-Goma Coura road.
Annual average daily count of vehicles on
the Niono-Goma Coura road.
Total amount of land irrigated by the
Project in the Alatona zone.
Average water volume delivered at the
farm level in the Alatona zone.
Crop water requirements as a percentage
share of water supply at the canal
headworks in the Alatona Zone.
Number of 5 and 10 hectare farm plots
allocated in the Alatona zone.
E:\FR\FM\21APN1.SGM
21APN1
21387
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Cumulative
disbursements
Objectives
Measures
Total market garden parcels allocated in
the Alatona zone.
Number of titles registered in the land
registration office granted to households in the Alatona zone.
Number of students enrolled in schools
established by the Project.
Graduation rate of students enrolled in
schools established by the Project.
Number of farms adopting at least one
new extension technique as a percentage of all farms receiving technical assistance under the Project.
Total amount of credit extended in loan
portfolios by participating microfinance
institutions and banks in the Alatona
zone.
Number of active clients of microfinance
institutions and banks in the Alatona
zone.
Program
Administration* and
Control, Monitoring
and Evaluation.
Pending Subsequent
Report **.
$41,815,000 ............
...............................................
$2,747,041
.................................
...............................................
$0
Country: Mozambique (CIF ONLY)1 Year: 2008
Quarter1
Entity to which the assistance is provided: MCA Mozambique
Total Obligation: $25,346,200
Total Quarterly Disbursement: $0
N/A ..........................
Increase access to reliable
and quality water and sanitation facilities.
Road Rehabilitation
Project.
rwilkins on PROD1PC63 with NOTICES
Water and Sanitation
Project.
N/A ..........................
Increase access to producN/A ..........................
tive resources and markets.
Land Tenure Services
Project.
N/A ..........................
Establish efficient, secure
land access for households and investors.
VerDate Aug<31>2005
16:59 Apr 18, 2008
Jkt 214001
PO 00000
Frm 00085
Fmt 4703
N/A ..........................
N/A ..........................
Sfmt 4703
Value of productive days gained due to
less diarrhea, cholera and/or malaria.
School attendance days gained due to
less diarrhea, cholera and/or malaria.
Number (Percent) of businesses with access to improved water source.
Reduction in time for rural/urban households to access improved water
sources.
Number (Percent) or urban households
with access to improved water sources.
Number (Percent) of rural households
with access to improved water sources.
Number (Percent) of urban households
with access to improved sanitation facilities.
Increase in agricultural production among
communities affected by road rehabilitation works.
Increase in the number of new businesses within 5 km of rehabilitated
roads.
Reduction in vehicle operating costs as a
result of rehabilitated roads.
Time savings due to a reduction in time
to travel a fixed length of rehabilitated
road.
Weighted average of the International
Roughness Index for the rehabilitation
roads.
Average annual daily traffic volume on rehabilitated roads disaggregated by vehicle type.
Increase (Percent) in value of new investments on land.
Number of new businesses.
Reduction (Percent) in time to right to
land usage.
More efficient, free and secure land
transfers/transactions.
E:\FR\FM\21APN1.SGM
21APN1
21388
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Cumulative
disbursements
Objectives
Farmer Income Support Project.
N/A ..........................
Improve coconut productivity
and diversification into
cash
N/A ..........................
Program
Administration* and
Control, Monitoring
and Evaluation
Pending Subsequent
Report**.
N/A ..........................
...............................................
...............................................
Increase (Percentage) in parcel-holder
land value.
Reduction (Percent) in costs to right to
land usage.
Reduction (Percentage) in loss of coconut production and coconut products’
sales.
Increased income (Percentage) from
sales from intercropping activities to
small farm plot holders.
Increased number (Percentage) of live
coconut trees.
Increased productive capacity (Percentage) of coconut trees.
N/A
.................................
Measures
N/A
Country: Lesotho (CIF ONLY)
Year: 2008
Quarter 1
Total Obligation: $15,668,416
Entity to which the assistance is provided: MCA Lesotho
Total Quarterly Disbursement: $30,000
$4,913,000 ..............
Improve the water supply for
industrial and domestic
needs, and enhance rural
livelihoods through improved watershed management.
N/A ..........................
Health Project ............
$4,436,000 ..............
Increase access to life-extending ART and essential
health services by providing a sustainable delivery platform.
N/A ..........................
Private Sector Development Project.
rwilkins on PROD1PC63 with NOTICES
Water Project .............
$710,000 .................
Stimulate investment by improving access to credit,
reducing transaction costs
and increasing the participation of women in the
economy.
$30,000 ...................
VerDate Aug<31>2005
16:59 Apr 18, 2008
Jkt 214001
PO 00000
Frm 00086
Fmt 4703
Sfmt 4703
Increased urban access to potable water
supply.
Increase in volume of water delivered
after treatment at Metolong site.
Decrease in percentage of urban water
that is not accounted for (non-revenue
losses plus physical losses).
Number of people covered per year in
rural areas with MCC funded rural
water supply.
Number of new VIP latrines provided to
households.
Increase in the percentage of health facilities providing full package of standard services for level of center
(MoHSW 2007 standard).
Increase in TB treatment success rate.
Increase in the percentage of health facilities staffed with standard number
and type of qualified staff (MoHSW
2007 standard).
Increase in the number of patients treated in health centers in Lesotho.
Increase in immunization rate (measles).
Number of people receiving ARV treatment (number).
Increase in annual enrollment at National
Health Training College.
Increase in average referred tests performed at the central laboratory per
quarter during the past year.
Increase in average number of blood
units collected per quarter during the
past year.
Increase in the percentage of the adult
population listed by a private credit bureau with current information on repayment history, unpaid debts or credit
outstanding.
Increase in the number of payments associated with salaries and pensions
made through EFT per year.
Land used as collateral (number of mortgage bonds registered).
Land transaction costs (percent of property value).
E:\FR\FM\21APN1.SGM
21APN1
21389
Federal Register / Vol. 73, No. 77 / Monday, April 21, 2008 / Notices
ASSISTANCE PROVIDED UNDER SECTION 605—Continued
Projects
Obligated
Cumulative
disbursements
Objectives
Measures
Land transaction times (median number
of days necessary to complete a procedure).
Increase in the number of pending civil
cases in the High Court.
Gender equality index (percent change in
index of knowledge, attitudes, and
practices for supporting gender equality
in economic rights).
Program
Administration* and
Control, Monitoring
and Evaluation.
Pending Subsequent
Report **.
$5,609,416 ..............
...............................................
N/A.
N/A.
Country: Morocco (CIF ONLY)
Year: 2008
Quarter 1
Total Obligation: $32,400,000
Entity to which the assistance is provided: MCA Morocco
Total Quarterly Disbursement: $0
Fruit Tree Productivity
Small Scale Fisheries
Artisan and Fez Medina.
Financial Services ......
Program
Administration* and
Control, Monitoring
and Evaluation.
Pending Subsequent
Report **.
$6,959,765 ..............
$7,005,874 ..............
$6,142,437 ..............
TBD .......................................
TBD .......................................
TBD .......................................
N/A ..........................
N/A ..........................
N/A ..........................
TBD
TBD
TBD
$500,000 .................
$11,271,924 ............
TBD .......................................
TBD .......................................
N/A ..........................
N/A ..........................
TBD
TBD
N/A ..........................
TBD .......................................
N/A ..........................
TBD
*Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.
**These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported as such
in subsequent quarterly report(s).
619(b) Transfer or allocation of funds
U.S. Agency to which funds were transferred or allocated
Amount
USAID .....................................................................................................................................................
$24,222,500
Description of program
or project
Threshold Program.
1 Beginning
in fiscal year 2007, CIF (i.e., Compact Implementation Funding) is assistance made available to a country, upon signature of a
compact, under the authority of Section 609(g) of the Act. It is additional to compact program assistance provided under Section 605 of the Act
upon entry into force of the compact and is included in the overall total of compact funding. As of this report, only CIF funds have been obligated
for Mozambique, Lesotho and Morocco.
Dated: April 16, 2008.
Matthew McLean,
Vice President, Congressional and Public
Affairs, Millennium Challenge Corporation.
[FR Doc. E8–8590 Filed 4–18–08; 8:45 am]
BILLING CODE 9210–01–P
NATIONAL FOUNDATION ON THE
ARTS AND THE HUMANITIES
Federal Council on the Arts and the
Humanities; Meeting of Arts and
Artifacts Indemnity Panel
The National Endowment for
the Humanities.
ACTION: Notice of meeting.
rwilkins on PROD1PC63 with NOTICES
AGENCY:
Pursuant to the provisions of the
Federal Advisory Committee Act (Pub.
L. 92–463 as amended) notice is hereby
VerDate Aug<31>2005
18:14 Apr 18, 2008
Jkt 214001
given that a meeting of the Arts and
Artifacts Indemnity Panel of the Federal
Council on the Arts and the Humanities
will be held at 1100 Pennsylvania
Avenue, NW., Washington, DC 20506,
in Room 730, from 9 a.m. to 5 p.m., on
Monday, May 12, 2008.
The purpose of the meeting is to
review applications for Certificates of
Indemnity submitted to the Federal
Council on the Arts and the Humanities
for exhibitions beginning after July 1,
2008.
Because the proposed meeting will
consider financial and commercial data
and because it is important to keep
values of objects, methods of
transportation and security measures
confidential, pursuant to the authority
granted me by the Chairman’s
Delegation of Authority to Close
Advisory Committee Meetings, dated
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
July 19, 1993, I have determined that the
meeting would fall within exemption (4)
of 5 U.S.C. 552(b) and that it is essential
to close the meeting to protect the free
exchange of views and to avoid
interference with the operations of the
Committee.
It is suggested that those desiring
more specific information contact
Acting Advisory Committee
Management Officer Heather Gottry,
1100 Pennsylvania Avenue, NW.,
Washington, DC 20506, or call 202/606–
8322.
Heather C. Gottry,
Acting Advisory Committee, Management
Officer.
[FR Doc. E8–8603 Filed 4–18–08; 8:45 am]
BILLING CODE 7536–01–P
E:\FR\FM\21APN1.SGM
21APN1
Agencies
[Federal Register Volume 73, Number 77 (Monday, April 21, 2008)]
[Notices]
[Pages 21381-21389]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-8590]
=======================================================================
-----------------------------------------------------------------------
MILLENNIUM CHALLENGE CORPORATION
[MCC FR 08-03]
Notice of Quarterly Report (October 1, 2007--December 31, 2007)
AGENCY: Millennium Challenge Corporation.
SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for
the quarter October 1, 2007 through December 31, 2007 with respect to
both assistance provided under Section 605 of the Millennium Challenge
Act of 2003 (Pub. L. 108-199, Division D (the Act)), and transfers or
allocations of funds to other federal agencies pursuant to Section
619(b) of the Act. The following report shall be made available to the
public by means of publication in the Federal Register and on the
Internet Web site of the MCC (https://www.mcc.gov) in accordance with
Section 612(b) of the Act.
Assistance Provided Under Section 605
----------------------------------------------------------------------------------------------------------------
Cumulative
Projects Obligated Objectives disbursements Measures
----------------------------------------------------------------------------------------------------------------
Country: Madagascar Year: 2008
Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Land Tenure Project............ $37,803,000...... Increase Land $4,308,910....... Legislative proposal
Titling and reflecting the
Security. National Land Tenure
Program submitted to
Parliament and
passed.
Number of land
disputes reported and
resolved in the
target zones and
sites of
implementation.
Percentage of land
documents
inventoried,
restored, and/or
digitized.
Average time and cost
required to carry out
property
transactions.
Percent of reported
land conflicts
resolved on titled
land in zone 3, 4, 5
during the title
regularization
operations
Percentage of land in
the zones that is
demarcated and ready
for titling.
Finance Project................ $35,888,000...... Increase $3,599,784....... The number of savings
Competition in accounts and
the Financial outstanding value of
Sector. accounts from primary
banks.
Maximum check clearing
delay.
Volume of funds in
payment system and
number of
transactions.
Increased public
awareness of new
financial instruments
as measured by
surveys within
intervention zones
and large towns.
The amount of
government debt
issued with
maturities in excess
of 52 weeks.
The number of new
individual investors
buying government
debt securities.
The number of bank
branches of the
Central Bank of
Madagascar capable of
accepting auction
tenders.
Percentage of all
loans included in the
central database.
Agricultural Business $17,683,000...... Improve $4,819,510....... Number of rural
Investment Project. Agricultural producers receiving
Projection or soliciting
Technologies and information from
Market Capacity Agricultural Business
in Rural Areas. Centers about the
opportunities.
Intervention zones
identified and
description of
beneficiaries within
each zone submitted.
Number of visitors
receiving information
from National
Coordinating Center
with respect to
business
opportunities.
[[Page 21382]]
Change in farm income
due to improved
production and
marketing practices.
Change in enterprise
income due to
improved production
and marketing
practices.
Number of farmers and
business employing
technical assistance
received.
Program Administration* and $18,399,000...... ................. $9,361,121
Control, Monitoring and
Evaluation.
Pending subsequent reports**... ................. ................. $640,940
----------------------------------------------------------------------------------------------------------------
Country: Honduras Year: 2008 Quarter 1 Total Obligation: $215,000,000
Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $3,952,445
----------------------------------------------------------------------------------------------------------------
Rural Development Project...... $70,687,000...... Increase the $9,461,696....... Increase in farm
productivity and income resulting from
business skills Rural Development
of farmers who Project.
operate small Funds lent by MCA-
and medium-size Honduras to financial
farms and their institutions.
employees. Increase in employment
income resulting from
Rural Development
Project.
Number of Program
farmers harvesting
high-value
horticulture crops.
Number of hectares
harvesting high-value
horticulture crops.
Transportation Project......... $127,208,000..... Reduce $1,929,507....... Freight shipment cost
transportation from Tegucigalpa to
costs between Puerto Cortes.
targeted Price of basic food
production basket.
centers and Number of days per
national, year road is
regional and passable.
global markets.
Program Administration* and $17,105,000...... ................. $2,376,136
Control, Monitoring and
Evaluation.
Pending subsequent reports**... ................. ................. $1,577,787
----------------------------------------------------------------------------------------------------------------
Country: Cape Verde Year: 2008
Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Watershed and Agricultural $10,848,630...... Increase $291,362......... Increase in
Support. agricultural horticultural
production in productivity.
three targeted Increase in annual
watershed areas income.
on three islands. Value-added for farms
and agribusiness.
Infrastructure Improvement..... $78,760,208...... Increase $6,154,186....... Volume of goods
integration of shipped between Praia
the internal and other islands.
market and Mobility Ratio:
reduce Percentage of
transportation beneficiary
costs. population who take
at least 5 trips per
month.
Savings on transport
costs from
improvements.
Private Sector Development..... $7,200,000....... Spur private $14,641.......... Value added in
sector priority sectors
development on above current trends.
all islands Volume of private
through investment in
increased priority sectors
investment in above current trends.
the priority
sectors and
through
financial sector
reform.
Program Administration* and $13,269,650...... ................. $3,775,862....... ......................
Control, Monitoring and
Evaluation.
Pending subsequent reports**... ................. ................. $3,694,566 ......................
----------------------------------------------------------------------------------------------------------------
[[Page 21383]]
Country: Nicaragua Year: 2008 Quarter 1 Total Obligation: $175,000,000
Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $4,669,211
----------------------------------------------------------------------------------------------------------------
Property Regularization Project $26,400,000...... Increase $1,358,563....... Value of investment on
investment by land.
strengthening Value of urban land.
property rights. Value of rural land.
Number of days to
conduct a land
transaction.
Total cost to conduct
a land transaction.
Transportation Project......... $92,800,000...... Reduce $2,573,281....... Price of a basket of
transportation goods.
costs between Travel Time.
Leon and
Chinandega and
national,
regional and
global markets.
Rural Business Development $33,500,000...... Increase the $3,997,215....... Annual percentage
Project. value added of increase in value-
farms and added of clients of
enterprises in business office.
the region. Number of jobs
created.
Number of program farm
plots harvesting
higher-value crops or
reforesting under
improvement of Water
Supply Activities.
Program Administration,* Due $22,300,000...... ................. $4,169,032 ......................
Diligence, Monitoring and
Evaluation.
Pending subsequent reports**... ................. ................. $2,256,236 ......................
----------------------------------------------------------------------------------------------------------------
Country: Georgia Year: 2008 Quarter 1 Total Obligation: $294,693,400
Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $8,618,845
----------------------------------------------------------------------------------------------------------------
Regional Infrastructure $211,700,000..... Key Regional $16,722,162...... Reduction in
Rehabilitation. Infrastructure Akhalkalaki-
Rehabilitated. Ninotsminda-Teleti
journey time.
Reduction in vehicle
operating costs.
Increase in internal
regional traffic
volumes.
Decreased technical
losses in gas through
the main North-South
pipeline.
Reduction in the
production of
greenhouse gas
emissions measured in
tons of CO2
equivalent.
Increased collection
rate of the Georgian
Gas Company (GOGC).
Number of household
beneficiaries served
by Regional
Infrastructure
Development projects.
Actual operations and
maintenance
expenditures.
Regional Enterprise Development $47,500,000...... Enterprises in $6,190,868....... Increase in annual
Regions revenue in portfolio
Developed. companies.
Increase in number of
portfolio company
employees and number
of local suppliers.
Increase in portfolio
companies' wages and
payments to local
suppliers.
Jobs created.
Increase in aggregate
incremental net
revenue to project
assisted firms.
Direct household net
income.
Direct household net
income for market
information
initiative
beneficiaries.
Number of
beneficiaries.
Program Administration,* Due 35,493,400....... ................. $7,395,795 ......................
Diligence, Monitoring and
Evaluation.
Pending subsequent reports**... ................. ................. $8,347,230 ......................
----------------------------------------------------------------------------------------------------------------
[[Page 21384]]
Country: Vanuatu Year: 2008 Quarter 1 Total Obligation: $65,690,000
Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $0
----------------------------------------------------------------------------------------------------------------
Transportation Infrastructure $60,615,232...... Facilitate $63,685.......... Number of Tourists.
Project. transportation Number of days per
to increase year road is closed.
tourism and Number of S-W Bay,
business Malekula flights
development. cancelled per year
due to flooding.
Vessel wait time at
wharf.
Program Administration,* Due $5,074,768....... ................. $1,608,111 ......................
Diligence, Monitoring and
Evaluation.
Pending subsequent reports**... ................. ................. $334,812 ......................
----------------------------------------------------------------------------------------------------------------
Country: Armenia Year: 2008 Quarter 1 Total Obligation: $235,650,000
Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $3,327,390
----------------------------------------------------------------------------------------------------------------
Irrigated Agriculture Project $145,690,000..... Increase $5,634,541....... Increase in hectares
(Agriculture and Water). agricultural covered by high value
productivity added horticultural
Improve and and fruit crops.
Quality of Percentage of
Irrigation. respondents satisfied
with irrigation
services.
Share of Water User
Association water
charges as percentage
of Water User
Association annual
operations and
maintenance costs.
Number of farmers
using improved on-
farm water management
practices.
Annual increase in
irrigated land in
Project area.
State budget
expenditures on
maintenance of
irrigation system.
Value of loans
provided under the
project.
Rural Road Rehabilitation $67,100,000...... Better access to $1,378,446....... Government budgetary
Project. economic and allocations for
social routine maintenance
infrastructure. of the entire road
network
Average daily traffic
in Project area.
Kilometers of Package
1 road sections
rehabilitated.
................. Kilometers of Package
2 road sections
rehabilitated.
Kilometers of Package
3 road sections
rehabilitated.
Program Administration,* Due $22,870,000...... ................. $2,732,235....... ......................
Diligence, Monitoring and
Evaluation.
Pending subsequent reports **.. ................. ................. $1,515,257 ......................
----------------------------------------------------------------------------------------------------------------
Country: Benin Year: 2008 Quarter 1 Total Obligation: $307,298,040
Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursement: $4,044,765
----------------------------------------------------------------------------------------------------------------
Access to Financial Services... $19,650,000...... Expand Access to $443,003......... Operational self-
Financial sufficiency of
Services. participating
microfinance
institutions.
Number of microfinance
institutions
supervised by the
microfinance cellule.
Total incremental
increase in value of
new credit extended
and savings received
by financial
institutions
participating in the
project.
Share value of all
loans outstanding
that have one or more
installments of
principal over 30
days past due.
Total number of loans
guaranteed by land
titles per year.
[[Page 21385]]
Access to Justice.............. $34,270,000...... Improved Ability $251,766......... Number of cases
of Justice processed at the
System to arbitration center.
Enforce Percentage of all
Contracts and cases in the
Reconcile Claims. ``Tribunal de
Premiere Instance''
courts per year.
Percentage of all
cases resolved in
court of appeals per
year.
Average distance to
reach TPI.
Number of enterprises
registered through
the registration
center.
Average number of days
required to register
an enterprise.
Access to Land................. $36,020,000...... Strengthen $2,299,452....... Total value of
property rights additional
and increase investments in target
investment in rural land parcels.
rural and urban Total value of
land. additional
investments in target
urban land parcels.
Access to Markets.............. $169,447,000..... Improve Access to $1,773,328....... Total metric tons of
Markets through exports and imports
Improvements to passing through Port
the Port of of Cotonou per year.
Cotonou.
Program Administration,* Due $47,911,040...... ................. $4,577,954 ......................
Diligence, Monitoring and
Evaluation.
Pending subsequent reports**... ................. ................. $8,126,902
----------------------------------------------------------------------------------------------------------------
Country: Ghana Year: 2008 Quarter 1 Total Obligation: $547,009,000
Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursement: $4,100,398
----------------------------------------------------------------------------------------------------------------
Agriculture Project............ $242,352,550..... Enhance $2,743,432....... Number of hectares
Profitability of irrigated.
cultivation, Number of days to
services to conduct a land
agriculture and transaction.
product handling Number of land
in support of disputes in the pilot
the expansion of registration
commercial districts.
agriculture Registration of land
among groups of rights in the pilot
smallholder registration
farms. districts.
Metric tons of
products passing
through post-harvest
treatment.
Portfolio-at-risk of
agriculture loan
fund.
Value of loans
disbursed to clients
from agricultural
loan fund.
Number of additional
loans.
Vehicle operating
costs on minor,
medium and major
rehabilitated roads.
Rural Development.............. $101,288,000..... Strengthen the $136,369......... Time/ quality per
rural procurement.
institutions Score card of citizen
that provide satisfaction with
services services.
complementary Gross enrollment
to, and rates.
supportive of, Gender parity in
agricultural and school enrollment.
agriculture Distance to collect
business water.
development. Time to collect water.
Distance to sanitation
facility.
Travel time to
sanitation facility.
Incidence of guinea
worm, diarrhea or
bilharzias.
Average number of days
lost due to guinea
worm, diarrhea or
bilharzias.
Percentage of
households, schools,
and agricultural
processing plants in
target districts with
electricity.
Number of inter-bank
transactions.
Value of deposit
accounts in rural
banks.
Transportation................. $141,735,500..... Reduce the $30,424.......... Volume capacity ratio.
transportation Vehicles per hour at
costs affecting peak hour.
agriculture Travel time at peak
commerce at sub- hour.
regional levels. International
roughness index.
Annual average daily
vehicle and passenger
traffic.
Program Administration,* Due $61,632,950...... ................. $3,257,906....... ......................
Diligence, Monitoring and
Evaluation.
[[Page 21386]]
Pending subsequent reports**... ................. ................. $7,272,608
----------------------------------------------------------------------------------------------------------------
Country: El Salvador Year: 2008 Quarter 1 Total Obligation: $460,939,996
Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursement: $1,810,602
----------------------------------------------------------------------------------------------------------------
Human Development Project...... $91,674,603...... Increase human $0............... Number of students
and physical enrolled in the
capital of Chalatenango Center
residents of the functioning as a
Northern Zone to MEGATEC institute.
take advantage Graduation rate of
of employment students enrolled in
and business the Chalatenango
opportunities. Center functioning as
a MEGATEC institute.
Number of students
enrolled in
participating middle
technical schools.
Graduation rate of
students enrolled in
participating middle
technical schools.
Number of students
enrolled in non-
formal training
activities.
Graduation rate of
students enrolled in
non-formal training
activities.
Number of households
with access to water
in the Northern Zone.
Number of households
with access to basic
sanitation in the
Northern Zone.
Number of households
with electricity in
the Northern Zone.
Number of individuals
that benefit annually
from the strategic
infrastructure
projects.
Productive Development Project. $84,196,330...... Increase $0............... Investment in
production and productive chains by
employment in selected
the Northern beneficiaries.
Zone.
Connectivity Project........... $234,963,039..... Reduce travel $0............... Weighted average of
cost and time the International
within the Roughness Index for
Northern Zone, the rehabilitation of
with the rest of the Transnational
the country, and Highway.
within the Weighted average of
region. the International
Roughness Index for
the rehabilitation of
the network of
connecting roads.
Program Administration * and $50,106,024...... ................. $0...............
Control, Monitoring and
Evaluation.
Pending Subsequent Report **... ................. ................. $4,034,819
----------------------------------------------------------------------------------------------------------------
Country: Mali Year: 2008 Quarter 1 Total Obligation $460,684,411
Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursement: $1,485,669
----------------------------------------------------------------------------------------------------------------
Bamako Senou Airport $89,631,177...... Establish an $263,697......... Number of weekly
Improvement Project. independent and flight arrivals and
secure link to departures.
the regional and Average time for
global economy. passengers to
complete departures
and arrivals
procedures.
Industrial Park Project........ $94,563,559...... Develop a $529,093......... Occupancy level.
platform for Average number of days
industrial required for operator
activity to be to connect to
located within Industrial Park water
the Airport and electricity
domain.. services.
Alatona Irrigation Project..... $234,674,675..... Increase the $0............... Weighted average of
agricultural the International
production and Roughness Index for
productivity in the rehabilitation of
the Alatona zone the Niono-Goma Coura
of the ON.. road.
Annual average daily
count of vehicles on
the Niono-Goma Coura
road.
Total amount of land
irrigated by the
Project in the
Alatona zone.
Average water volume
delivered at the farm
level in the Alatona
zone.
Crop water
requirements as a
percentage share of
water supply at the
canal headworks in
the Alatona Zone.
Number of 5 and 10
hectare farm plots
allocated in the
Alatona zone.
[[Page 21387]]