Natural Gas Pipeline Company of America LLC; Notice of Application, 20279-20280 [E8-7952]

Download as PDF Federal Register / Vol. 73, No. 73 / Tuesday, April 15, 2008 / Notices o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E8–7955 Filed 4–14–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP08–110–000] Gulf South Pipeline Company, LP; Notice of Application jlentini on PROD1PC65 with NOTICES April 9, 2008. Take notice that on April 4, 2008, Gulf South Pipeline Company, LP (Gulf South), 9 Greenway Plaza, Houston, Texas 77046, filed in Docket No. CP08– 110–000 an application pursuant to section 7(b) of the Natural Gas Act (NGA) requesting permission and approval to abandon by sale to Energy Partners, LTD. Approximately 11.8 miles of 12-inch diameter pipeline facilities and related appurtenances located in federal and state waters offshore in the Gulf of Mexico. In addition, Gulf South is requesting a determination that upon abandonment, Energy Partners ownership and operation of the facilities will be exempt from Commission jurisdiction under 1(b) of the NGA, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing is accessible on-line at https:// www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Any questions regarding this application should be directed to J. Kyle Stephens, Vice President, Regulatory Affairs, Gulf South Pipeline South Pipeline Company, LP, 9 Greenway Plaza, Houston, Texas 77046, or call (713) 479–8033, by fax (713) 479–1846, or by e-mail to kyle.stephens@bwpmlp.com. There are two ways to become involved in the Commission’s review of VerDate Aug<31>2005 17:31 Apr 14, 2008 Jkt 214001 this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 20279 on the Commission’s Web site under the ‘‘e-Filing’’ link at https://www.ferc.gov. The Commission strongly encourages intervenors to file electronically. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comment Date: April 30, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–7957 Filed 4–14–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP08–114–000] Natural Gas Pipeline Company of America LLC; Notice of Application April 9, 2008. Take notice that on April 7, 2008, Natural Gas Pipeline Company of America LLC (Natural), 747 East 22nd Street, Lombard, Illinois 60148, filed an application pursuant to section 7(c) of the Natural Gas Act for a certificate of public convenience and necessity to construct and operate certain facilities, located in Cameron Parish, Louisiana, all as more fully set forth in the application which is on file with the Commission and open for public inspection. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Specifically, Natural proposes to construct and operate approximately 900 feet of 16-inch diameter pipeline and operate an already constructed meter, consisting of ultrasonic meter runs, flow control valve, gas quality monitoring devices, and Electronic flow Measurement facilities. Natural states that the facilities are necessary to receive up to 300 MDth/day of revaporized liquefied natural gas from the Sabine Pass Segment of the Cheniere Creole Trail Pipeline (Cheniere), located in Cameron Parish, Louisiana. Natural estimates the cost of construction to be E:\FR\FM\15APN1.SGM 15APN1 jlentini on PROD1PC65 with NOTICES 20280 Federal Register / Vol. 73, No. 73 / Tuesday, April 15, 2008 / Notices $4,892,350, and all costs borne by Natural will be reimbursed by Cheniere. Any questions regarding this Application should be directed to Bruce H. Newsome, Vice President, Regulatory, Natural Gas Pipeline Company of America, 747 East 22nd Street, Lombard, Illinois 60148–5072 or by telephone at (630) 691–3526 or email at bruce_newsome@kindermorgan.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the below listed comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition VerDate Aug<31>2005 17:31 Apr 14, 2008 Jkt 214001 to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. Motions to intervene, protests and comments may be filed electronically via the Internet in lieu of paper; see, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Comment Date: April 21, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–7952 Filed 4–14–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 April 8, 2008. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP96–320–084. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits an Amendment to a Negotiated Rate Letter Agreement executed by Gulf South and one of its customers in relation to the East Texas to Mississippi Expansion Project etc. PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 Filed Date: 03/28/2008. Accession Number: 20080403–0255. Comment Date: 5 p.m. Eastern Time on Wednesday, April 9, 2008. Docket Numbers: RP97–13–032. Applicants: East Tennessee Natural Gas, LLC. Description: East Tennessee Natural Gas LLC submits Original Sheet 30 et al. to FERC Gas Tariff, Third Revised Volume 1, to become effective 4/4/08. Filed Date: 04/04/2008. Accession Number: 20080407–0056. Comment Date: 5 p.m. Eastern Time on Wednesday, April 16, 2008. Docket Numbers: RP99–301–207. Applicants: ANR Pipeline Company. Description: ANR Pipeline Company submits Rate Schedule FTS–1 and Gathering negotiated rate agreement between ANR and Eagle Energy Partners I, LP. Filed Date: 04/03/2008. Accession Number: 20080404–0400. Comment Date: 5 p.m. Eastern Time on Tuesday, April 15, 2008. Docket Numbers: RP99–480–020. Applicants: Texas Eastern Transmission LP. Description: Texas Eastern Transmission LP submits Original Sheet 118 et al. to FERC Gas Tariff, Seventh Revised Volume 1. Filed Date: 04/01/2008. Accession Number: 20080403–0044. Comment Date: 5 p.m. Eastern Time on Monday, April 14, 2008. Docket Numbers: RP02–534–007. Applicants: Guardian Pipeline, L.L.C. Description: Guardian Pipeline, LLC submits Original Sheet 8 et al. to its FERC Gas Tariff, Original Volume 1, to be effective April 4, 2008. Filed Date: 04/03/2008. Accession Number: 20080404–0399. Comment Date: 5 p.m. Eastern Time on Tuesday, April 15, 2008. Docket Numbers: RP04–42–003. Applicants: Southern Natural Gas Company. Description: Southern Natural Gas Company submits Fifth Revised Sheet 107 et al. to FERC Gas Tariff, Seventh Revised Volume 1, to become effective 5/5/08. Filed Date: 04/04/2008. Accession Number: 20080407–0055. Comment Date: 5 p.m. Eastern Time on Wednesday, April 16, 2008. Docket Numbers: RP05–157–012. Applicants: Saltville Gas Storage Company L.L.C. Description: Saltville Gas Storage Company LLC submits Original Sheet 22 et al. as part of its FERC Gas Tariff, Original Volume 1, to become effective 4/4/08. E:\FR\FM\15APN1.SGM 15APN1

Agencies

[Federal Register Volume 73, Number 73 (Tuesday, April 15, 2008)]
[Notices]
[Pages 20279-20280]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-7952]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP08-114-000]


Natural Gas Pipeline Company of America LLC; Notice of 
Application

April 9, 2008.
    Take notice that on April 7, 2008, Natural Gas Pipeline Company of 
America LLC (Natural), 747 East 22nd Street, Lombard, Illinois 60148, 
filed an application pursuant to section 7(c) of the Natural Gas Act 
for a certificate of public convenience and necessity to construct and 
operate certain facilities, located in Cameron Parish, Louisiana, all 
as more fully set forth in the application which is on file with the 
Commission and open for public inspection. This filing is available for 
review at the Commission in the Public Reference Room or may be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659.
    Specifically, Natural proposes to construct and operate 
approximately 900 feet of 16-inch diameter pipeline and operate an 
already constructed meter, consisting of ultrasonic meter runs, flow 
control valve, gas quality monitoring devices, and Electronic flow 
Measurement facilities. Natural states that the facilities are 
necessary to receive up to 300 MDth/day of re-vaporized liquefied 
natural gas from the Sabine Pass Segment of the Cheniere Creole Trail 
Pipeline (Cheniere), located in Cameron Parish, Louisiana. Natural 
estimates the cost of construction to be

[[Page 20280]]

$4,892,350, and all costs borne by Natural will be reimbursed by 
Cheniere.
    Any questions regarding this Application should be directed to 
Bruce H. Newsome, Vice President, Regulatory, Natural Gas Pipeline 
Company of America, 747 East 22nd Street, Lombard, Illinois 60148-5072 
or by telephone at (630) 691-3526 or e-mail at bruce_
newsome@kindermorgan.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding, or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the below listed comment date, file with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 14 copies of filings made with the Commission and must mail a 
copy to the applicant and to every other party in the proceeding. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    Motions to intervene, protests and comments may be filed 
electronically via the Internet in lieu of paper; see, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. The Commission strongly encourages 
electronic filings.
    Comment Date: April 21, 2008.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-7952 Filed 4-14-08; 8:45 am]
BILLING CODE 6717-01-P