Environmental Impacts Statements; Notice of Availability, 19834 [E8-7787]
Download as PDF
19834
Federal Register / Vol. 73, No. 71 / Friday, April 11, 2008 / Notices
Recommendations and Associated
Actions for the 104th Fighter Wing
Massachusetts Air National Guard, Base
Realignment and Closure,
Implementation, Westfield-Barnes
Airport, Westfield, MA.
Summary: EPA had no objection to
the project and encouraged the National
Guard Bureau to work closely with local
communities.
EIS No. 20080062, ERP No. F–USA–
A11079–00, Permanent Home
Stationing of the 2/25th Stryker
Brigade Combat Team (SBECT), To
Address a Full Range of Alternatives
for Permanently Stationing the 2/25th
SBCT, Hawaii and Honolulu
Counties, HI; Anchorage and
Southeast Fairbanks Boroughs, AK; El
Paso, Pueblo, and Fremont Counties,
CO.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA does
not object to the proposed project.
EIS No. 20080073, ERP No. F–FHW–
F40812–IL, Prairie Parkway Study,
Transportation System Improvement
between I–80 and I–88, Widening IL–
47 to 4 Lanes from I–80 to Caton Farm
Road, Funding, U.S. Army COE
section 404, Grundy, Kendall and
Kane Counties, IL.
Summary: EPA continues to have
environmental concerns about water
quality and aquatic life impacts due to
road salt and other pollutants.
Dated: April 8, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–7784 Filed 4–10–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6697–7]
mstockstill on PROD1PC66 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/31/2008 Through 04/04/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080125, Draft EIS, FHW, NC,
I–26 Connector Project, Proposed
Multi-Land Freeway from I–40 to US
19–23–70 North of Asheville,
Funding, U.S. Coast Guard Permit, US
Army COE Section 10 and 404 Permit,
Buncombe County, Asheville, NC,
Comment Period Ends: 05/19/2008,
VerDate Aug<31>2005
19:21 Apr 10, 2008
Jkt 214001
Contact: John F. Sullivan, III, P.E.
919–856–4346 Ext. 122
EIS No. 20080126, Draft EIS, AFS, ID,
Corralled Bear Project, Management of
Vegetation, Hazardous Fuels, and
Access, Plus Watershed
Improvements, Palouse Ranger
District, Clearwater National Forest,
Latah County, ID, Comment Period
Ends: 05/19/2008, Contact: Kara
Chadwick 208–875–1131.
EIS No. 20080127, Final Supplement,
FHW, MT, US 93 Highway Ninepipe/
Ronan Improvement Project, from
Dublin Gulch Road/Red Horn Road,
Funding, Special-Use-Permit, NPDES
Permit and U.S. Army COE Section
404 Permit, Lake County, MT, Wait
Period Ends: 05/05/2008, Contact:
Craig Genzlinger, P.E. 406–449–5302.
EIS No. 20080128, Draft Supplement,
MMS, 00, Gulf of Mexico Outer
Continental Shelf Oil and Gas Lease
Sales: 2009–2012 Western Planning
Area Sales: 210 in 2009, 215 in 2010,
and 218 in 2011, and Central
Planning Area Sales: 208 in 2009, 213
in 2010, 216 in 2011, and 222 in 2012,
TX, LA, MS, AL and FL, Comment
Period Ends: 06/03/2008, Contact: Dr.
Mary Boatman 703–737–1662.
EIS No. 20080129, Draft EIS, FHW, UT,
Layton Interchange Project,
Improvements on I–15 (Exit–330) to
Provide Unrestricted Access Across
the Unicon Pacific Railroad and to
Address Traffic Congestion on Gentile
St. in West Layton, Layton City, UT,
Comment Period Ends: 05/27/2008,
Contact: Doug Atkin 801–963–0182.
EIS No. 20080130, Final EIS, AFS, 00,
Mt. Ashland Late-Successional
Reserve Habitat Restoration and Fuels
Reduction Project, To Promote and
Maintain Late-Successional Habitat,
Oak Knoll Ranger District, Klamath
National Forest, Siskiyou County, CA
and Jackson County, OR, Wait Period
Ends: 05/05/2008, Contact: Susan
Stresser 530–841–4538.
EIS No. 20080131, Final EIS, AFS, CA,
Eldorado National Forest Public
Wheeled Motorized Travel
Management Project, Proposes to
Regulate Unmanaged Public Wheeled
Motor Vehicle, Implementation,
Alphine, Amador, El Dorado and
Placer Counties, CA, Wait Period
Ends: 05/05/2008, Contact: Laura
Hierholzer 530–647–5382.
EIS No. 20080132, Final EIS, USN, VA,
Marine Corps Base Quantico (MCBQ)
Virginia Project, Proposes
Development of the Westside of
MCBQ and the 2005 Base
Realignment and Closure Action at
MCBQ, Implementation, Quantico,
VA, Wait Period Ends: 05/05/2008,
Contact: Jeff Gardner 703–432–6784.
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Amended Notices
EIS No. 20080111, Draft EIS, COE, 00,
Programmatic—Hydropower
Rehabilitations, Dissolved Oxygen
and Minimum Flow Regimes at Wolf
Creek Dam, Kentucky and Center Hill
and Dale Hollow Dams, Tennessee,
Implementation, Comment Period
Ends: 05/12/2008, Contact: Chip Hall
615–736–7666.
Revision to FR Notice Published 03/
28/2008: EIS is withdrawn due to NonDistribution of the document.
Dated: April 8, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–7787 Filed 4–10–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–ORD–2008–0268; FRL–8553–3]
Board of Scientific Counselors,
Executive Committee Meeting—May
2008
Environmental Protection
Agency (EPA).
ACTION: Notice of meeting.
AGENCY:
SUMMARY: Pursuant to the Federal
Advisory Committee Act, Public Law
92–463, the Environmental Protection
Agency, Office of Research and
Development (ORD), gives notice of one
meeting of the Board of Scientific
Counselors (BOSC) Executive
Committee.
The meeting will be held on
Tuesday, May 6, 2008, from 8 a.m. to
4:30 p.m., and will continue on
Wednesday, May 7, 2008, from 8:30 a.m.
until 3:30 p.m. All times noted are
central time. The meeting may adjourn
early if all business is finished. Requests
for the draft agenda or for making oral
presentations at the meeting will be
accepted up to 1 business day before the
meeting.
ADDRESSES: The meeting will be held at
the Office of Research and
Development, National Health and
Environmental Effects Research
Laboratory, Gulf Ecology Division, 1
Sabine Island Drive, Gulf Breeze,
Florida 32561. Submit your comments,
identified by Docket ID No. EPA–HQ–
ORD–2008–0268, by one of the
following methods:
• https://www.regulations.gov: Follow
the on-line instructions for submitting
comments.
• E-mail: Send comments by
electronic mail (e-mail) to:
DATES:
E:\FR\FM\11APN1.SGM
11APN1
Agencies
[Federal Register Volume 73, Number 71 (Friday, April 11, 2008)]
[Notices]
[Page 19834]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-7787]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6697-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 03/31/2008 Through 04/04/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080125, Draft EIS, FHW, NC, I-26 Connector Project, Proposed
Multi-Land Freeway from I-40 to US 19-23-70 North of Asheville,
Funding, U.S. Coast Guard Permit, US Army COE Section 10 and 404
Permit, Buncombe County, Asheville, NC, Comment Period Ends: 05/19/
2008, Contact: John F. Sullivan, III, P.E. 919-856-4346 Ext. 122
EIS No. 20080126, Draft EIS, AFS, ID, Corralled Bear Project,
Management of Vegetation, Hazardous Fuels, and Access, Plus Watershed
Improvements, Palouse Ranger District, Clearwater National Forest,
Latah County, ID, Comment Period Ends: 05/19/2008, Contact: Kara
Chadwick 208-875-1131.
EIS No. 20080127, Final Supplement, FHW, MT, US 93 Highway Ninepipe/
Ronan Improvement Project, from Dublin Gulch Road/Red Horn Road,
Funding, Special-Use-Permit, NPDES Permit and U.S. Army COE Section 404
Permit, Lake County, MT, Wait Period Ends: 05/05/2008, Contact: Craig
Genzlinger, P.E. 406-449-5302.
EIS No. 20080128, Draft Supplement, MMS, 00, Gulf of Mexico Outer
Continental Shelf Oil and Gas Lease Sales: 2009-2012 Western Planning
Area Sales: 210 in 2009, 215 in 2010, and 218 in 2011, and Central
Planning Area Sales: 208 in 2009, 213 in 2010, 216 in 2011, and 222 in
2012, TX, LA, MS, AL and FL, Comment Period Ends: 06/03/2008, Contact:
Dr. Mary Boatman 703-737-1662.
EIS No. 20080129, Draft EIS, FHW, UT, Layton Interchange Project,
Improvements on I-15 (Exit-330) to Provide Unrestricted Access Across
the Unicon Pacific Railroad and to Address Traffic Congestion on
Gentile St. in West Layton, Layton City, UT, Comment Period Ends: 05/
27/2008, Contact: Doug Atkin 801-963-0182.
EIS No. 20080130, Final EIS, AFS, 00, Mt. Ashland Late-Successional
Reserve Habitat Restoration and Fuels Reduction Project, To Promote and
Maintain Late-Successional Habitat, Oak Knoll Ranger District, Klamath
National Forest, Siskiyou County, CA and Jackson County, OR, Wait
Period Ends: 05/05/2008, Contact: Susan Stresser 530-841-4538.
EIS No. 20080131, Final EIS, AFS, CA, Eldorado National Forest Public
Wheeled Motorized Travel Management Project, Proposes to Regulate
Unmanaged Public Wheeled Motor Vehicle, Implementation, Alphine,
Amador, El Dorado and Placer Counties, CA, Wait Period Ends: 05/05/
2008, Contact: Laura Hierholzer 530-647-5382.
EIS No. 20080132, Final EIS, USN, VA, Marine Corps Base Quantico (MCBQ)
Virginia Project, Proposes Development of the Westside of MCBQ and the
2005 Base Realignment and Closure Action at MCBQ, Implementation,
Quantico, VA, Wait Period Ends: 05/05/2008, Contact: Jeff Gardner 703-
432-6784.
Amended Notices
EIS No. 20080111, Draft EIS, COE, 00, Programmatic--Hydropower
Rehabilitations, Dissolved Oxygen and Minimum Flow Regimes at Wolf
Creek Dam, Kentucky and Center Hill and Dale Hollow Dams, Tennessee,
Implementation, Comment Period Ends: 05/12/2008, Contact: Chip Hall
615-736-7666.
Revision to FR Notice Published 03/28/2008: EIS is withdrawn due to
Non-Distribution of the document.
Dated: April 8, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E8-7787 Filed 4-10-08; 8:45 am]
BILLING CODE 6560-50-P