Environmental Impacts Statements; Notice of Availability, 19834 [E8-7787]

Download as PDF 19834 Federal Register / Vol. 73, No. 71 / Friday, April 11, 2008 / Notices Recommendations and Associated Actions for the 104th Fighter Wing Massachusetts Air National Guard, Base Realignment and Closure, Implementation, Westfield-Barnes Airport, Westfield, MA. Summary: EPA had no objection to the project and encouraged the National Guard Bureau to work closely with local communities. EIS No. 20080062, ERP No. F–USA– A11079–00, Permanent Home Stationing of the 2/25th Stryker Brigade Combat Team (SBECT), To Address a Full Range of Alternatives for Permanently Stationing the 2/25th SBCT, Hawaii and Honolulu Counties, HI; Anchorage and Southeast Fairbanks Boroughs, AK; El Paso, Pueblo, and Fremont Counties, CO. Summary: EPA’s previous concerns have been resolved; therefore, EPA does not object to the proposed project. EIS No. 20080073, ERP No. F–FHW– F40812–IL, Prairie Parkway Study, Transportation System Improvement between I–80 and I–88, Widening IL– 47 to 4 Lanes from I–80 to Caton Farm Road, Funding, U.S. Army COE section 404, Grundy, Kendall and Kane Counties, IL. Summary: EPA continues to have environmental concerns about water quality and aquatic life impacts due to road salt and other pollutants. Dated: April 8, 2008. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. E8–7784 Filed 4–10–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6697–7] mstockstill on PROD1PC66 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 03/31/2008 Through 04/04/2008 Pursuant to 40 CFR 1506.9. EIS No. 20080125, Draft EIS, FHW, NC, I–26 Connector Project, Proposed Multi-Land Freeway from I–40 to US 19–23–70 North of Asheville, Funding, U.S. Coast Guard Permit, US Army COE Section 10 and 404 Permit, Buncombe County, Asheville, NC, Comment Period Ends: 05/19/2008, VerDate Aug<31>2005 19:21 Apr 10, 2008 Jkt 214001 Contact: John F. Sullivan, III, P.E. 919–856–4346 Ext. 122 EIS No. 20080126, Draft EIS, AFS, ID, Corralled Bear Project, Management of Vegetation, Hazardous Fuels, and Access, Plus Watershed Improvements, Palouse Ranger District, Clearwater National Forest, Latah County, ID, Comment Period Ends: 05/19/2008, Contact: Kara Chadwick 208–875–1131. EIS No. 20080127, Final Supplement, FHW, MT, US 93 Highway Ninepipe/ Ronan Improvement Project, from Dublin Gulch Road/Red Horn Road, Funding, Special-Use-Permit, NPDES Permit and U.S. Army COE Section 404 Permit, Lake County, MT, Wait Period Ends: 05/05/2008, Contact: Craig Genzlinger, P.E. 406–449–5302. EIS No. 20080128, Draft Supplement, MMS, 00, Gulf of Mexico Outer Continental Shelf Oil and Gas Lease Sales: 2009–2012 Western Planning Area Sales: 210 in 2009, 215 in 2010, and 218 in 2011, and Central Planning Area Sales: 208 in 2009, 213 in 2010, 216 in 2011, and 222 in 2012, TX, LA, MS, AL and FL, Comment Period Ends: 06/03/2008, Contact: Dr. Mary Boatman 703–737–1662. EIS No. 20080129, Draft EIS, FHW, UT, Layton Interchange Project, Improvements on I–15 (Exit–330) to Provide Unrestricted Access Across the Unicon Pacific Railroad and to Address Traffic Congestion on Gentile St. in West Layton, Layton City, UT, Comment Period Ends: 05/27/2008, Contact: Doug Atkin 801–963–0182. EIS No. 20080130, Final EIS, AFS, 00, Mt. Ashland Late-Successional Reserve Habitat Restoration and Fuels Reduction Project, To Promote and Maintain Late-Successional Habitat, Oak Knoll Ranger District, Klamath National Forest, Siskiyou County, CA and Jackson County, OR, Wait Period Ends: 05/05/2008, Contact: Susan Stresser 530–841–4538. EIS No. 20080131, Final EIS, AFS, CA, Eldorado National Forest Public Wheeled Motorized Travel Management Project, Proposes to Regulate Unmanaged Public Wheeled Motor Vehicle, Implementation, Alphine, Amador, El Dorado and Placer Counties, CA, Wait Period Ends: 05/05/2008, Contact: Laura Hierholzer 530–647–5382. EIS No. 20080132, Final EIS, USN, VA, Marine Corps Base Quantico (MCBQ) Virginia Project, Proposes Development of the Westside of MCBQ and the 2005 Base Realignment and Closure Action at MCBQ, Implementation, Quantico, VA, Wait Period Ends: 05/05/2008, Contact: Jeff Gardner 703–432–6784. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Amended Notices EIS No. 20080111, Draft EIS, COE, 00, Programmatic—Hydropower Rehabilitations, Dissolved Oxygen and Minimum Flow Regimes at Wolf Creek Dam, Kentucky and Center Hill and Dale Hollow Dams, Tennessee, Implementation, Comment Period Ends: 05/12/2008, Contact: Chip Hall 615–736–7666. Revision to FR Notice Published 03/ 28/2008: EIS is withdrawn due to NonDistribution of the document. Dated: April 8, 2008. Ken Mittelholtz, Environmental Protection Specialist, Office of Federal Activities. [FR Doc. E8–7787 Filed 4–10–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–ORD–2008–0268; FRL–8553–3] Board of Scientific Counselors, Executive Committee Meeting—May 2008 Environmental Protection Agency (EPA). ACTION: Notice of meeting. AGENCY: SUMMARY: Pursuant to the Federal Advisory Committee Act, Public Law 92–463, the Environmental Protection Agency, Office of Research and Development (ORD), gives notice of one meeting of the Board of Scientific Counselors (BOSC) Executive Committee. The meeting will be held on Tuesday, May 6, 2008, from 8 a.m. to 4:30 p.m., and will continue on Wednesday, May 7, 2008, from 8:30 a.m. until 3:30 p.m. All times noted are central time. The meeting may adjourn early if all business is finished. Requests for the draft agenda or for making oral presentations at the meeting will be accepted up to 1 business day before the meeting. ADDRESSES: The meeting will be held at the Office of Research and Development, National Health and Environmental Effects Research Laboratory, Gulf Ecology Division, 1 Sabine Island Drive, Gulf Breeze, Florida 32561. Submit your comments, identified by Docket ID No. EPA–HQ– ORD–2008–0268, by one of the following methods: • https://www.regulations.gov: Follow the on-line instructions for submitting comments. • E-mail: Send comments by electronic mail (e-mail) to: DATES: E:\FR\FM\11APN1.SGM 11APN1

Agencies

[Federal Register Volume 73, Number 71 (Friday, April 11, 2008)]
[Notices]
[Page 19834]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-7787]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6697-7]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements
Filed 03/31/2008 Through 04/04/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080125, Draft EIS, FHW, NC, I-26 Connector Project, Proposed 
Multi-Land Freeway from I-40 to US 19-23-70 North of Asheville, 
Funding, U.S. Coast Guard Permit, US Army COE Section 10 and 404 
Permit, Buncombe County, Asheville, NC, Comment Period Ends: 05/19/
2008, Contact: John F. Sullivan, III, P.E. 919-856-4346 Ext. 122
EIS No. 20080126, Draft EIS, AFS, ID, Corralled Bear Project, 
Management of Vegetation, Hazardous Fuels, and Access, Plus Watershed 
Improvements, Palouse Ranger District, Clearwater National Forest, 
Latah County, ID, Comment Period Ends: 05/19/2008, Contact: Kara 
Chadwick 208-875-1131.
EIS No. 20080127, Final Supplement, FHW, MT, US 93 Highway Ninepipe/
Ronan Improvement Project, from Dublin Gulch Road/Red Horn Road, 
Funding, Special-Use-Permit, NPDES Permit and U.S. Army COE Section 404 
Permit, Lake County, MT, Wait Period Ends: 05/05/2008, Contact: Craig 
Genzlinger, P.E. 406-449-5302.
EIS No. 20080128, Draft Supplement, MMS, 00, Gulf of Mexico Outer 
Continental Shelf Oil and Gas Lease Sales: 2009-2012 Western Planning 
Area Sales: 210 in 2009, 215 in 2010, and 218 in 2011, and Central 
Planning Area Sales: 208 in 2009, 213 in 2010, 216 in 2011, and 222 in 
2012, TX, LA, MS, AL and FL, Comment Period Ends: 06/03/2008, Contact: 
Dr. Mary Boatman 703-737-1662.
EIS No. 20080129, Draft EIS, FHW, UT, Layton Interchange Project, 
Improvements on I-15 (Exit-330) to Provide Unrestricted Access Across 
the Unicon Pacific Railroad and to Address Traffic Congestion on 
Gentile St. in West Layton, Layton City, UT, Comment Period Ends: 05/
27/2008, Contact: Doug Atkin 801-963-0182.
EIS No. 20080130, Final EIS, AFS, 00, Mt. Ashland Late-Successional 
Reserve Habitat Restoration and Fuels Reduction Project, To Promote and 
Maintain Late-Successional Habitat, Oak Knoll Ranger District, Klamath 
National Forest, Siskiyou County, CA and Jackson County, OR, Wait 
Period Ends: 05/05/2008, Contact: Susan Stresser 530-841-4538.
EIS No. 20080131, Final EIS, AFS, CA, Eldorado National Forest Public 
Wheeled Motorized Travel Management Project, Proposes to Regulate 
Unmanaged Public Wheeled Motor Vehicle, Implementation, Alphine, 
Amador, El Dorado and Placer Counties, CA, Wait Period Ends: 05/05/
2008, Contact: Laura Hierholzer 530-647-5382.
EIS No. 20080132, Final EIS, USN, VA, Marine Corps Base Quantico (MCBQ) 
Virginia Project, Proposes Development of the Westside of MCBQ and the 
2005 Base Realignment and Closure Action at MCBQ, Implementation, 
Quantico, VA, Wait Period Ends: 05/05/2008, Contact: Jeff Gardner 703-
432-6784.

Amended Notices

EIS No. 20080111, Draft EIS, COE, 00, Programmatic--Hydropower 
Rehabilitations, Dissolved Oxygen and Minimum Flow Regimes at Wolf 
Creek Dam, Kentucky and Center Hill and Dale Hollow Dams, Tennessee, 
Implementation, Comment Period Ends: 05/12/2008, Contact: Chip Hall 
615-736-7666.
    Revision to FR Notice Published 03/28/2008: EIS is withdrawn due to 
Non-Distribution of the document.

    Dated: April 8, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
 [FR Doc. E8-7787 Filed 4-10-08; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.