Crisp County Power Commission; Notice of Availability of Environmental Assessment, 19212 [E8-7416]
Download as PDF
19212
Federal Register / Vol. 73, No. 69 / Wednesday, April 9, 2008 / Notices
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the web site that
enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–7437 Filed 4–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL08–51–000]
Louisiana Public Service Commission:
Complainant v. Entergy Corporation, et
al.: Respondents; Notice of Complaint
mstockstill on PROD1PC66 with NOTICES
April 2, 2008.
Take notice that on March 31, 2008,
the Louisiana Public Service
Commission filed a formal complaint
against Entergy Corporation, Entergy
Services, Inc., Entergy Louisiana, LLC,
Entergy Arkansas, Inc., Entergy
Mississippi, Inc., Entergy New Orleans,
Inc., Entergy Gulf States Louisiana, Inc.,
and Entergy Texas, Inc. (collectively,
Energgy), pursuant to section 206 of the
Federal Power Act, 16 U.S.C. 824e and
18 CFR 386.206, alleging that there are
errors in the calculation of Exhibits
ETR–26 and ETR–28, which form the
basis for the rough equalization remedy
and that Entergy used incorrect data and
included imprudent costs in its
implementation filing in Docket No.
ER07–956–000.
The Louisiana Public Service
Commission certifies that copies of the
complaint were served on the contacts
for Entergy Corporation and Entergy
Services, Inc as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
VerDate Aug<31>2005
18:06 Apr 08, 2008
Jkt 214001
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 pm Eastern Time on
April 21, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–7417 Filed 4–8–08; 8:45 am]
not occupy any federal lands. Staff has
prepared an Environmental Assessment
(EA) for the project.
The EA contains staff’s analysis of the
potential environmental effects of the
project and concludes that licensing the
project, with appropriate environmental
protective measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
Any comments should be filed within
30 days from the date of this notice and
should be addressed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE, Washington, DC 20426.
Please affix Project No. 659–014 to all
comments. Comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
For further information, please
contact Allyson Conner at (202) 502–
6082 or at allyson.conner@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–7416 Filed 4–8–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Project No. 659–014]
Crisp County Power Commission;
Notice of Availability of Environmental
Assessment
April 2, 2008.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR Part 380 (Order No.
486, 52 F.R. 47897), the Office of Energy
Projects has reviewed the application
for a New Major License for the Lake
Blackshear Hydroelectric Project.
The project is located in Southwest
Georgia in Worth, Lee, Sumter, Dooly,
and Crisp Counties. The project does
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 12882–000]
Hydro Green Energy, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene,
Protests, and Comments
April 2, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12882–000.
c. Date filed: July 25, 2007.
E:\FR\FM\09APN1.SGM
09APN1
Agencies
[Federal Register Volume 73, Number 69 (Wednesday, April 9, 2008)]
[Notices]
[Page 19212]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-7416]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 659-014]
Crisp County Power Commission; Notice of Availability of
Environmental Assessment
April 2, 2008.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR Part 380 (Order No. 486, 52 F.R. 47897), the Office
of Energy Projects has reviewed the application for a New Major License
for the Lake Blackshear Hydroelectric Project.
The project is located in Southwest Georgia in Worth, Lee, Sumter,
Dooly, and Crisp Counties. The project does not occupy any federal
lands. Staff has prepared an Environmental Assessment (EA) for the
project.
The EA contains staff's analysis of the potential environmental
effects of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659.
Any comments should be filed within 30 days from the date of this
notice and should be addressed to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE, Washington, DC
20426. Please affix Project No. 659-014 to all comments. Comments may
be filed electronically via the Internet in lieu of paper. The
Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov) under the ``e-Filing'' link.
For further information, please contact Allyson Conner at (202)
502-6082 or at allyson.conner@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-7416 Filed 4-8-08; 8:45 am]
BILLING CODE 6717-01-P