Crisp County Power Commission; Notice of Availability of Environmental Assessment, 19212 [E8-7416]

Download as PDF 19212 Federal Register / Vol. 73, No. 69 / Wednesday, April 9, 2008 / Notices Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E8–7437 Filed 4–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL08–51–000] Louisiana Public Service Commission: Complainant v. Entergy Corporation, et al.: Respondents; Notice of Complaint mstockstill on PROD1PC66 with NOTICES April 2, 2008. Take notice that on March 31, 2008, the Louisiana Public Service Commission filed a formal complaint against Entergy Corporation, Entergy Services, Inc., Entergy Louisiana, LLC, Entergy Arkansas, Inc., Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Gulf States Louisiana, Inc., and Entergy Texas, Inc. (collectively, Energgy), pursuant to section 206 of the Federal Power Act, 16 U.S.C. 824e and 18 CFR 386.206, alleging that there are errors in the calculation of Exhibits ETR–26 and ETR–28, which form the basis for the rough equalization remedy and that Entergy used incorrect data and included imprudent costs in its implementation filing in Docket No. ER07–956–000. The Louisiana Public Service Commission certifies that copies of the complaint were served on the contacts for Entergy Corporation and Entergy Services, Inc as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). VerDate Aug<31>2005 18:06 Apr 08, 2008 Jkt 214001 Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 pm Eastern Time on April 21, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–7417 Filed 4–8–08; 8:45 am] not occupy any federal lands. Staff has prepared an Environmental Assessment (EA) for the project. The EA contains staff’s analysis of the potential environmental effects of the project and concludes that licensing the project, with appropriate environmental protective measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Any comments should be filed within 30 days from the date of this notice and should be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Please affix Project No. 659–014 to all comments. Comments may be filed electronically via the Internet in lieu of paper. The Commission strongly encourages electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘eFiling’’ link. For further information, please contact Allyson Conner at (202) 502– 6082 or at allyson.conner@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E8–7416 Filed 4–8–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY BILLING CODE 6717–01–P Federal Energy Regulatory Commission DEPARTMENT OF ENERGY [Project No. 659–014] Crisp County Power Commission; Notice of Availability of Environmental Assessment April 2, 2008. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s (Commission) regulations, 18 CFR Part 380 (Order No. 486, 52 F.R. 47897), the Office of Energy Projects has reviewed the application for a New Major License for the Lake Blackshear Hydroelectric Project. The project is located in Southwest Georgia in Worth, Lee, Sumter, Dooly, and Crisp Counties. The project does PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Project No. 12882–000] Hydro Green Energy, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments April 2, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 12882–000. c. Date filed: July 25, 2007. E:\FR\FM\09APN1.SGM 09APN1

Agencies

[Federal Register Volume 73, Number 69 (Wednesday, April 9, 2008)]
[Notices]
[Page 19212]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-7416]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 659-014]


Crisp County Power Commission; Notice of Availability of 
Environmental Assessment

April 2, 2008.
    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission's (Commission) 
regulations, 18 CFR Part 380 (Order No. 486, 52 F.R. 47897), the Office 
of Energy Projects has reviewed the application for a New Major License 
for the Lake Blackshear Hydroelectric Project.
    The project is located in Southwest Georgia in Worth, Lee, Sumter, 
Dooly, and Crisp Counties. The project does not occupy any federal 
lands. Staff has prepared an Environmental Assessment (EA) for the 
project.
    The EA contains staff's analysis of the potential environmental 
effects of the project and concludes that licensing the project, with 
appropriate environmental protective measures, would not constitute a 
major federal action that would significantly affect the quality of the 
human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
(202) 502-8659.
    Any comments should be filed within 30 days from the date of this 
notice and should be addressed to: Kimberly D. Bose, Secretary, Federal 
Energy Regulatory Commission, 888 First Street, NE, Washington, DC 
20426. Please affix Project No. 659-014 to all comments. Comments may 
be filed electronically via the Internet in lieu of paper. The 
Commission strongly encourages electronic filings. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(https://www.ferc.gov) under the ``e-Filing'' link.
    For further information, please contact Allyson Conner at (202) 
502-6082 or at allyson.conner@ferc.gov.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-7416 Filed 4-8-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.