Environmental Impact Statements and Regulations; Availability of EPA Comments, 16671-16672 [E8-6422]
Download as PDF
Federal Register / Vol. 73, No. 61 / Friday, March 28, 2008 / Notices
sroberts on PROD1PC70 with NOTICES
be 1,885 hours per respondent (i.e., an
annual average of 113,084 hours of
burden divided among an anticipated
annual average of 60 facilities). The
State reporting and record keeping
burden for the review, oversight, and
administration of the rule is estimated
to average 111 hours per respondent
(i.e., an annual average of 5,125 hours
of burden divided among an anticipated
46 States on average per year). Burden
means the total time, effort, or financial
resources expended by persons to
generate, maintain, retain, or disclose or
provide information to or for a Federal
agency. This includes the time needed
to review instructions; develop, acquire,
install, and utilize technology and
systems for the purposes of collecting,
validating, and verifying information,
processing and maintaining
information, and disclosing and
providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
The ICR provides a detailed
explanation of the Agency’s estimate,
which is only briefly summarized here:
Estimated total number of potential
respondents: 68 facilities and 46 States
and Territories.
Frequency of response: Annual
reports and application every 5 years.
Estimated total average number of
responses for each respondent: 5.3 for
facilities (317 annual average responses
for an average of 60 facility respondents)
and 6.1 for States and Territories (280
annual average responses for an average
of 46 State respondents).
Estimated total annual burden hours:
118,209 (113,084 for facilities and 5,125
for States and Territories).
Estimated total annual costs: $8.5
million per year. This includes an
estimated burden cost of $6.7 and an
estimated cost of $1.8 for capital
investment or maintenance and
operational costs.
Are There Changes in the Estimates
From the Last Approval?
There is an increase of 41,941 hours
in the total estimated respondent
burden compared with that identified in
the ICR currently approved by OMB.
This increase is due to the addition of
the newly built facilities, as well as the
continued performance of annual
activities by facilities that received their
permit during the previous ICR approval
periods. In addition, this ICR includes
VerDate Aug<31>2005
17:57 Mar 27, 2008
Jkt 214001
additional repermitting burden and
costs which were not in the currently
approved ICR (EPA ICR Number:
1973.03) because more facilities are
entering the renewal phase of their
permits.
What Is the Next Step in the Process for
This ICR?
EPA will consider the comments
received and amend the ICR as
appropriate. The final ICR package will
then be submitted to OMB for review
and approval pursuant to 5 CFR
1320.12. At that time, EPA will issue
another Federal Register notice
pursuant to 5 CFR 1320.5(a)(1)(iv) to
announce the submission of the ICR to
OMB and the opportunity to submit
additional comments to OMB. If you
have any questions about this ICR or the
approval process, please contact the
technical person listed under FOR
FURTHER INFORMATION CONTACT.
Dated: March 20, 2008.
James A. Hanlon,
Director, Office of Wastewater Management.
[FR Doc. E8–6408 Filed 3–27–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6697–4]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in the Federal Register dated April 6,
2007 (72 FR 17156).
Draft EISs
EIS No. 20070367, ERP No. D–AFS–
A65177–00
National Forest System Land
Management Planning, Implementation,
Proposed Land Management Planning
Rule at 36 CFR Part 219 to Finish
Rulemaking.
Summary: EPA expressed
environmental concerns about annual
monitoring, and how the proposed rule
would ensure that it would be
conducted. In addition, the final EIS
should clarify under what
circumstances the public will receive
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
16671
notification for changes in monitoring
plans/strategy.
Rating EC2.
EIS No. 20070550, ERP No. D–FHW–
F40441–MN
US–14 Reconstruction Project,
Improvement to Truck Highway 14 from
Front Street in New Ulm to Nicollet
County Road 6 in North Mankato Brown
and Nicollet Counties, MN.
Summary: EPA expressed
environmental concerns about impacts
to riparian forested wetlands and
surface water quality, and requested
additional information on mitigation
areas and the corridor preservation plan.
Rating EC2.
EIS No. 20070555, ERP No. D–DHS–
K80050–CA
U.S. Border Patrol San Diego Sector,
Proposed Construction, Operation, and
Maintenance of Tactical Infrastructure,
San Diego County, CA.
Summary: EPA expressed
environmental objections because of the
proposed filling of two riparian
corridors and has concerns about
erosion impacts. EPA recommended
avoiding fill in these canyons, avoiding
fence construction on steep slopes, and
alternatives to pedestrian fencing across
streams.
Rating EO2.
EIS No. 20080025, ERP No. D–FTA–
G59004–TX
Northwest Corridor Light Rail Transit
Line (LRT) to Irving /Dallas/Fort Worth
International Airport, Construction,
Dallas County, TX.
Summary: EPA does not object to the
proposed action.
Rating LO.
EIS No. 20080031, ERP No. D–AFS–
F65069–MN
Glacier Project, To Maintain and
Promote Native Vegetation,
Communities that are Diverse,
Productive, Healthy, Implementation,
Superior National Forest, Kawishiwi
Ranger District, St. Louis and Lake
Counties, MN.
Summary: EPA does not object to the
action alternatives proposed.
Rating LO.
EIS No. 20070450, ERP No. DS–WPA–
J08026–00
Big Stone II Power Plant and
Transmission Project, Addresses the
Impacts of Changes to the Proposed
Action relative to Cooling Alternatives
and the Use of Groundwater as Backup
Water Source, U.S. Army COE Section
10 and 404 Permits, Grant County, SD
and Big Stone County, MN.
E:\FR\FM\28MRN1.SGM
28MRN1
16672
Federal Register / Vol. 73, No. 61 / Friday, March 28, 2008 / Notices
Summary: EPA expressed
environmental concerns about ground
water impacts, and requested a detailed
assessment of the wetland and streamcrossing impacts of the transmission
line corridors and how mercury
emissions will be addressed.
Rating EC2.
EIS No. 20070547, ERP No. DS–COE–
G39044–TX
Central City Project, Proposed
Modification to the Authorized Projects
which provides Flood Damage
Reduction, Habitat Improvement,
Recreation and Urban Revitalization,
Upper Trinity River Central City, Upper
Trinity River Basin, Trinity River, TX.
Summary: No formal comment letter
was sent to the preparing agency.
Rating NC.
Final EISs
EIS No. 20080036, ERP No. F–GSA–
J80047–CO
Denver Federal Central Site Plan
Study, Master Site Plan,
Implementation, City of Lakewood,
Jefferson County, CO.
Summary: EPA’s previous concerns
have been resolved; therefore, EPA does
not object to the proposed action.
EIS No. 20080056, ERP No. F–AFS–
L65530–AK
Tonga’s Land and Resource
Management Plan, Plan Amendment,
Implementation, Tonga’s National
Forest, AK.
Summary: The final EIS addressed
EPA’s concerns; therefore, EPA does not
object to the project.
Dated: February 25, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–6422 Filed 3–27–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6697–3]
sroberts on PROD1PC70 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/17/2008 Through 03/21/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080101, Final EIS, FHW, ID,
ID–75 Timmerman to Ketchum—US–
20 to Saddle Road, Preferred
VerDate Aug<31>2005
17:57 Mar 27, 2008
Jkt 214001
Alternative is 2, Increase Roadway
and Transportation Safety, Cities of
Bellevue, Hailey, Ketchum and the
City of Sun Valley, Blaine County, ID,
Wait Period Ends: 04/28/2008,
Contact: Peter J. Hartman 208–334–
9180.
EIS No. 20080102, Final EIS, BLM, 00,
Yuma Field Office (YFO) Resource
Management Plan, Provide Direction
Managing Public Lands,
Implementation, Yuma, La Paz and
Maricopa Counties, AZ and Imperial
and Riverside Counties, CA, Wait
Period Ends: 04/28/2008, Contact:
Brenda Hudgens-Williams 202–452–
5112.
EIS No. 20080103, Draft EIS, USN, FL,
Mayport Naval Station Project,
Proposed Homeporting of Additional
Surface Ships, Several Permits,
Mayport, FL, Comment Period Ends:
05/12/2008, Contact: Erica Evans
703–412–7542.
EIS No. 20080104, Final EIS, JUS, NV,
Las Vegas Detention Facility,
Proposed Contractor-Owned/
Contractor-Operated Detention
Facility, Implementation, Nevada
Area, Wait Period Ends: 04/28/2008,
Contact: Scott P. Stermer 202–353–
4601.
EIS No. 20080105, Draft EIS, AFS, CA,
Orleans Community Fuels Reduction
and Forest Health Project, To Manage
Forest Stands to Reduce Hazardous
Fuel Conditions, Orleans Ranger
District, Six Rivers National Forest,
Humboldt County, CA, Comment
Period Ends: 05/13/2008, Contact:
William Rice 530–627–3291.
EIS No. 20080106, Draft EIS, AFS, CO,
Long Draw Reservoir Project, Re-Issue
a Special-Use-Authorization to Water
Supply and Storage to Allow the
Continued Use of Long Draw
Reservoir and Dam, Arapaho and
Roosevelt National Forests and
Pawnee National Grassland, Grand
and Larimer Counties, CO, Comment
Period Ends: 05/12/2008, Contact:
Ken Tu 970–295–6623.
EIS No. 20080107, Final Supplement,
NOA, 00, Atlantic Mackerel, Squid
and Butterfish, Fishery Management
Plan, Amendment #9,
Implementation, Essential Fish
Habitat (EFH), Exclusive Economic
Zone (EEZ), Wait Period Ends: 04/28/
2008, Contact: Patricia A. Kurkul
978–281–9250.
EIS No. 20080108, Revised Final EIS,
WAP, CA, Sacramento Area Voltage
Support Project, Revision to FSEIS
Filed February 2008, Selected
Preferred Alternative B, Proposal to
Build a Double-Circuit 230-kV
Transmission Line, Placer,
Sacramento and Sutter Counties, CA,
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
Wait Period Ends: 04/28/2008,
Contact: Catherine Cunningham 720–
962–7260.
EIS No. 20080109, Final EIS, AFS, OR,
Mt. Hood National Forest and
Columbia River Gorge National Scenic
Area, Site-Specific Invasive Plant
Treatments, Forest Plan Amendments
#16, Mt. Hood National Forest and
Columbia River Gorge National Scenic
Area, Clackamas, Hood River,
Multnomah and Wasco Counties, OR,
Wait Period Ends: 04/28/2008,
Contact: Jennie O’Connor 503–668–
1645.
EIS No. 20080110, Final EIS, BIA, CA,
Scotts Valley Band of Pomo Indians,
Proposed 29.87 Acre Fee-to-Trust
Transfer and Casino Project, Contra
Costa County, Comment Period Ends:
04/28/2008, Contact: John Rydzik
916–978–6042.
EIS No. 20080111, Draft EIS, COE, 00,
PROGRAMMATIC—Hydropower
Rehabilitations, Dissolved Oxygen
and Minimum Flow Regimes at Wolf
Creek Dam, Kentucky and Center Hill
and Dale Hollow Dams, Tennessee,
Implementation, Comment Period
Ends: 05/12/2008, Contact: Chip Hall
615–736–7666.
EIS No. 20080112, Draft Supplement,
NOA, CA, Channel Islands National
Marine Sanctuary Management Plan,
Supplement/Replace Information,
Implementation, Santa Barbara and
Ventura Counties, CA , Comment
Period Ends: 05/30/2008, Contact:
Chris Mobley 805–966–7107 Ext 465.
EIS No. 20080113, Draft EIS, FRC, FL,
Floridian Natural Gas Storage Project,
Construction and Operation,
Liquefied Natural Gas (LNG) Storage
and Natural Gas Transmission
Facilities, Martin County, FL,
Comment Period Ends: 05/12/2008,
Contact: Andy Black 1–866–208–
3372.
EIS No. 20080114, Draft EIS, BPA, WA,
Lyle Falls Fish Passage Project, To
Improve Fish Passage to Habitat in the
Upper Part of the Watershed, Located
on the Lower Klickitat River, Klickitat
County, WA, Comment Period Ends:
05/12/2008, Contact: Carl Keller 503–
230–7692.
EIS No. 20080115, Draft EIS, UAF, FL,
Eglin Air Force Base Program, Base
Realignment and Closure (BRAC)
2005 Decisions and Related Action,
Implementation, FL, Comment Period
Ends: 05/12/2008, Contact: Mike
Spaits 850–882–2878.
EIS No. 20080116, Final EIS, FRC, 00,
Gulf Crossing Project, Construction
and Operation of Natural Gas Pipeline
to Facilitate the Transport of up to
1.73 Billion Cubic Feet Per Day of
Natural Gas, Locate in various
E:\FR\FM\28MRN1.SGM
28MRN1
Agencies
[Federal Register Volume 73, Number 61 (Friday, March 28, 2008)]
[Notices]
[Pages 16671-16672]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-6422]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6697-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in the Federal Register dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070367, ERP No. D-AFS-A65177-00
National Forest System Land Management Planning, Implementation,
Proposed Land Management Planning Rule at 36 CFR Part 219 to Finish
Rulemaking.
Summary: EPA expressed environmental concerns about annual
monitoring, and how the proposed rule would ensure that it would be
conducted. In addition, the final EIS should clarify under what
circumstances the public will receive notification for changes in
monitoring plans/strategy.
Rating EC2.
EIS No. 20070550, ERP No. D-FHW-F40441-MN
US-14 Reconstruction Project, Improvement to Truck Highway 14 from
Front Street in New Ulm to Nicollet County Road 6 in North Mankato
Brown and Nicollet Counties, MN.
Summary: EPA expressed environmental concerns about impacts to
riparian forested wetlands and surface water quality, and requested
additional information on mitigation areas and the corridor
preservation plan.
Rating EC2.
EIS No. 20070555, ERP No. D-DHS-K80050-CA
U.S. Border Patrol San Diego Sector, Proposed Construction,
Operation, and Maintenance of Tactical Infrastructure, San Diego
County, CA.
Summary: EPA expressed environmental objections because of the
proposed filling of two riparian corridors and has concerns about
erosion impacts. EPA recommended avoiding fill in these canyons,
avoiding fence construction on steep slopes, and alternatives to
pedestrian fencing across streams.
Rating EO2.
EIS No. 20080025, ERP No. D-FTA-G59004-TX
Northwest Corridor Light Rail Transit Line (LRT) to Irving /Dallas/
Fort Worth International Airport, Construction, Dallas County, TX.
Summary: EPA does not object to the proposed action.
Rating LO.
EIS No. 20080031, ERP No. D-AFS-F65069-MN
Glacier Project, To Maintain and Promote Native Vegetation,
Communities that are Diverse, Productive, Healthy, Implementation,
Superior National Forest, Kawishiwi Ranger District, St. Louis and Lake
Counties, MN.
Summary: EPA does not object to the action alternatives proposed.
Rating LO.
EIS No. 20070450, ERP No. DS-WPA-J08026-00
Big Stone II Power Plant and Transmission Project, Addresses the
Impacts of Changes to the Proposed Action relative to Cooling
Alternatives and the Use of Groundwater as Backup Water Source, U.S.
Army COE Section 10 and 404 Permits, Grant County, SD and Big Stone
County, MN.
[[Page 16672]]
Summary: EPA expressed environmental concerns about ground water
impacts, and requested a detailed assessment of the wetland and stream-
crossing impacts of the transmission line corridors and how mercury
emissions will be addressed.
Rating EC2.
EIS No. 20070547, ERP No. DS-COE-G39044-TX
Central City Project, Proposed Modification to the Authorized
Projects which provides Flood Damage Reduction, Habitat Improvement,
Recreation and Urban Revitalization, Upper Trinity River Central City,
Upper Trinity River Basin, Trinity River, TX.
Summary: No formal comment letter was sent to the preparing agency.
Rating NC.
Final EISs
EIS No. 20080036, ERP No. F-GSA-J80047-CO
Denver Federal Central Site Plan Study, Master Site Plan,
Implementation, City of Lakewood, Jefferson County, CO.
Summary: EPA's previous concerns have been resolved; therefore, EPA
does not object to the proposed action.
EIS No. 20080056, ERP No. F-AFS-L65530-AK
Tonga's Land and Resource Management Plan, Plan Amendment,
Implementation, Tonga's National Forest, AK.
Summary: The final EIS addressed EPA's concerns; therefore, EPA
does not object to the project.
Dated: February 25, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-6422 Filed 3-27-08; 8:45 am]