Salt Lake City Area Integrated Projects Firm Power, Colorado River Storage Project Transmission and Ancillary Services Rates-Rate Order No. WAPA-137, 15519-15520 [E8-5868]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, and/or
Motions to Intervene—Anyone may
submit comments, a protest, or a motion
to intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any motion to intervene must
also be served upon each representative
of the applicant specified in the
particular application.
p. Agency Comments—Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5847 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
Western Area Power Administration
Salt Lake City Area Integrated Projects
Firm Power, Colorado River Storage
Project Transmission and Ancillary
Services Rates—Rate Order No.
WAPA–137
Western Area Power
Administration, DOE.
ACTION: Notice of Extension of Public
Process for Rate Adjustment.
AGENCY:
SUMMARY: Western initiated a public
process to modify the Salt Lake City
Area Integrated Projects (SLCA/IP) firm
power rates and extend the Colorado
River Storage Project (CRSP)
transmission and ancillary services rates
by publishing a notice in the Federal
Register on January 4, 2008. Western
held a Public Information Forum on
February 5, 2008, and a Public
Comment Forum on March 4, 2008.
Western is extending the comment
and consultation period to allow
sufficient time to finalize the 2010 Work
Program Review (WPR), which forms
the basis of the operation, maintenance
and replacement (OM&R) expenses, to
propose a two-step increase and to add
clarification to the Spinning and
Supplement Reserves (SP–SSR–3) rates.
In conjunction with extending the
comment and consultation period,
Western will hold an additional public
information forum and public comment
forum on April 10, 2008. Information
will be provided at this public
information forum and also on the CRSP
Management Center Web site under the
‘‘FY 2009 SLCA/IP Rate Adjustment’’
section located at: https://
www.wapa.gov/CRSP/ratescrsp/
default.htm.
Western mailed a brochure on January
11, 2008, that provided detailed
information about the rates to all
interested parties. The proposed rates in
Rate Order No. WAPA–137 under Rate
Schedules SLIP–F9, SP–PTP7, SP–NW3,
SP–NFT6, SP–CF1, SP–SD3, SP–RS3,
SP–EI3, SP–FR3, and SP–SSR3 are
scheduled to go into effect on October
1, 2008.
DATES: The extended consultation and
comment period begins today and will
end May 5, 2008. A public information
forum will be held on April 10, 2008,
1:30 p.m., at the Wallace F. Bennett
Federal Building, Room 8102, 125 S.
State Street, Salt Lake City, Utah. A
public comment forum will follow the
public information forum. Western will
accept written comments any time
during the consultation and comment
period.
Frm 00047
Fmt 4703
Sfmt 4703
Send written comments to
Mr. Bradley S. Warren, CRSP Manager,
CRSP Management Center, Western
Area Power Administration, 150 East
Social Hall Avenue, Suite 300, Salt Lake
City, UT 84111–1580; telephone (801)
524–5493; e-mail
CRSPMCadj@wapa.gov. Western will
post information about the rate process
on its Web site under the ‘‘FY 2009
SLCA/IP Rate Adjustment’’ section
located at: https://www.wapa.gov/CRSP/
ratescrsp/default.htm.
Western will post official comments
received by letter and e-mail to its Web
site after the close of the comment
period. Western must receive written
comments by the end of the
consultation and comment period to
ensure consideration in Western’s
decision process.
FOR FURTHER INFORMATION CONTACT: Ms.
Carol A. Loftin, Rates Manager, CRSP
Management Center, Western Area
Power Administration, 150 East Social
Hall Avenue, Suite 300, Salt Lake City,
UT 84111–1580; telephone (801) 524–
6380; e-mail loftinc@wapa.gov.
SUPPLEMENTARY INFORMATION: The
proposed rates for SLCA/IP firm power
are designed to return an annual amount
of revenue to meet the repayment of
power investment, payment of interest,
purchased power, OM&R expenses, and
the repayment of irrigation assistance
costs as required by law.
The Deputy Secretary of Energy
approved Rate Schedule SLIP–F8 for
firm power service on August 1, 2005.
Rate Schedule SLIP–F8 became effective
on October 1, 2005, for a 5-year period
ending September 30, 2010. The Deputy
Secretary of Energy also approved a rate
extension for the CRSP Transmission
and Ancillary Services Rates through
September 30, 2010.
ADDRESSES:
DEPARTMENT OF ENERGY
PO 00000
15519
Discussion
Western’s SLCA/IP Firm Power, CRSP
Transmission and Ancillary Services
rates entered into a rate adjustment
process with a Federal Register notice
published on January 4, 2008, which
began the initial public consultation and
comment period that would have ended
on April 3, 2008. Western seeks an
extension of the public process to
provide additional time to finalize the
2010 WPR, which forms the basis of the
OM&R expenses. The 2010 WPR shows
significant increases in some program
areas, and Western and the firm power
customers need more time to evaluate
these proposed increases. The
customers are requesting Western
consider a rate increase that is phased
in over a 2-year period, and Western
will provide options for customers’
E:\FR\FM\24MRN1.SGM
24MRN1
15520
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
comments. In addition, Western is
proposing to eliminate the reference to
the ‘‘Western System Power Pool’’ in the
Rate Schedule for Spinning and
Supplement Reserves (SP–SSR–3) to
make it consistent with the other
regions within Western and to clarify
better how those rates are determined.
In conjunction with extending the
comment and consultation period,
Western will hold an additional public
information and public comment forum.
mstockstill on PROD1PC66 with NOTICES
Legal Authority
Since the proposed rates constitute a
major rate adjustment as defined by 10
CFR part 903, Western has held both a
public information forum and a public
comment forum and, as indicated in this
notice, will hold an additional public
information and public comment forum.
After a review of public comments and
possible amendments or adjustments,
Western will recommend a proposed
rate for the Deputy Secretary of Energy
to approve on an interim basis.
Western is establishing firm electric
service rates for the SCLA/IP under the
Department of Energy Organization Act
(42 U.S.C. 7152); the Reclamation Act of
1902 (ch. 1093, 32 Stat. 388), as
amended and supplemented by
subsequent laws, particularly section
9(c) of the Reclamation Project Act of
1939 (43 U.S.C. 485h(c)); and other acts
that specifically apply to the projects
involved.
By Delegation Order No. 00–037.00,
effective December 6, 2001, the
Secretary of Energy delegated: (1) The
authority to develop power and
transmission rates to Western’s
Administrator; (2) the authority to
confirm, approve, and place such rates
into effect on an interim basis to the
Deputy Secretary of Energy; and (3) the
authority to confirm, approve, and place
into effect on a final basis, to remand,
or to disapprove such rates to the
Commission. Existing Department of
Energy (DOE) procedures for public
participation in power rate adjustments
(10 CFR part 903) were published on
September 18, 1985.
Availability of Information
All brochures, studies, comments,
letters, memorandums, or other
documents that Western initiates or uses
to develop the proposed rates are
available for inspection and copying at
the CRSP Management Center, 150 East
Social Hall Avenue, Suite 300, Salt Lake
City, Utah. Many of these documents
and supporting information are also
available on its Web site under the ‘‘FY
2009 SLCA/IP Rate Adjustment’’ section
located at: https://www.wapa.gov/CRSP/
ratescrsp/default.htm.
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
Regulatory Procedure Requirements
Environmental Compliance
In compliance with the National
Environmental Policy Act of 1969
(NEPA) (42 U.S.C. 4321, et seq.); the
Council on Environmental Quality
Regulations for implementing NEPA (40
CFR parts 1500–1508); and DOE NEPA
Implementing Procedures and
Guidelines (10 CFR part 1021), Western
has determined this action is
categorically excluded from preparing
an environmental assessment or an
environmental impact statement.
Determination Under Executive Order
12866
Western has an exemption from
centralized regulatory review under
Executive Order 12866; accordingly, no
clearance of this notice by the Office of
Management and Budget is required.
Dated: March 14, 2008.
Timothy J. Meeks,
Administrator.
[FR Doc. E8–5868 Filed 3–21–08; 8:45 am]
BILLING CODE 6450–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2008–001; FRL–8545–8]
Protection of Stratospheric Ozone;
Launch of Electronic Reporting
System
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
SUMMARY: EPA is prepared to receive, in
electronic form, certain documents
required under the regulations at 40
CFR Part 82 for the Stratospheric Ozone
Protection Program. EPA is launching
an electronic reporting system that will
allow producers, importers, and
exporters of Class I ozone-depleting
substances (except methyl bromide) and
Class II ozone-depleting substances to
submit quarterly reports electronically.
EPA believes that, for many users,
electronic reporting will allow reporting
to occur with greater ease, speed, and
accuracy than the paper-based reporting
systems.
FOR FURTHER INFORMATION CONTACT:
Jennifer Bohman, Stratospheric
Protection Division, Office of Air and
Radiation (6205J), Environmental
Protection Agency, 1200 Pennsylvania
Ave. NW., Washington, DC 20460;
telephone number: (202) 343–9548; fax
number: (202) 343–2338; e-mail address:
bohman.jennifer@epa.gov. Additional
information, including the electronic
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
reporting forms, training and guidance
documents are found at https://
www.epa.gov/ozone/record/
ereport.html.
SUPPLEMENTARY INFORMATION:
I. General Information
A. What Action is the Agency Taking?
EPA is launching an electronic
reporting system that will allow the
electronic submission of certain
quarterly reports. Over the past year,
EPA has conducted a pilot effort to use
and evaluate an electronic reporting
system. EPA has refined the system
based on recommendations from the
pilot participants. EPA is now
launching the electronic reporting
system and providing an opportunity for
all eligible participants to use the
system.
B. What Is the Agency’s Authority for
Taking This Action?
EPA is establishing this electronic
reporting system under section 603(b) of
the Clean Air Act which states that ‘‘on
a quarterly basis, or such other basis
(not less than annually) as determined
by the Administrator, each person who
produced, imported, or exported a class
I or class II substance shall file a report
with the Administrator. * * *’’
EPA offers the electronic reporting
system as an alternative to the existing
paper-based reporting system. The
electronic reporting system does not
contain any new or additional
requirements. The electronic reporting
system is compliant with EPA’s Cross
Media Electronic Reporting Rule.
C. What Reports Can Be Submitted
Electronically?
The electronic reporting system
currently allows producers, importers,
and exporters of Class I ozone-depleting
substances (except methyl bromide) and
Class II ozone-depleting substances to
submit quarterly reports electronically.
These quarterly reports, among others,
are required under our regulations at 40
CFR 82.13 and 82.24. In addition to the
quarterly report data, participants will
also be able to submit supporting
documents that would have been
attached to hard copy reports under the
previous system.
EPA anticipates expanding the
electronic reporting system to include
additional reports required by the
Stratospheric Ozone Protection
Program’s regulations.
D. Am I Required To Submit Reports
Electronically?
EPA strongly encourages companies
to use the electronic reporting system.
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 73, Number 57 (Monday, March 24, 2008)]
[Notices]
[Pages 15519-15520]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5868]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Western Area Power Administration
Salt Lake City Area Integrated Projects Firm Power, Colorado
River Storage Project Transmission and Ancillary Services Rates--Rate
Order No. WAPA-137
AGENCY: Western Area Power Administration, DOE.
ACTION: Notice of Extension of Public Process for Rate Adjustment.
-----------------------------------------------------------------------
SUMMARY: Western initiated a public process to modify the Salt Lake
City Area Integrated Projects (SLCA/IP) firm power rates and extend the
Colorado River Storage Project (CRSP) transmission and ancillary
services rates by publishing a notice in the Federal Register on
January 4, 2008. Western held a Public Information Forum on February 5,
2008, and a Public Comment Forum on March 4, 2008.
Western is extending the comment and consultation period to allow
sufficient time to finalize the 2010 Work Program Review (WPR), which
forms the basis of the operation, maintenance and replacement (OM&R)
expenses, to propose a two-step increase and to add clarification to
the Spinning and Supplement Reserves (SP-SSR-3) rates. In conjunction
with extending the comment and consultation period, Western will hold
an additional public information forum and public comment forum on
April 10, 2008. Information will be provided at this public information
forum and also on the CRSP Management Center Web site under the ``FY
2009 SLCA/IP Rate Adjustment'' section located at: https://www.wapa.gov/
CRSP/ratescrsp/default.htm.
Western mailed a brochure on January 11, 2008, that provided
detailed information about the rates to all interested parties. The
proposed rates in Rate Order No. WAPA-137 under Rate Schedules SLIP-F9,
SP-PTP7, SP-NW3, SP-NFT6, SP-CF1, SP-SD3, SP-RS3, SP-EI3, SP-FR3, and
SP-SSR3 are scheduled to go into effect on October 1, 2008.
DATES: The extended consultation and comment period begins today and
will end May 5, 2008. A public information forum will be held on April
10, 2008, 1:30 p.m., at the Wallace F. Bennett Federal Building, Room
8102, 125 S. State Street, Salt Lake City, Utah. A public comment forum
will follow the public information forum. Western will accept written
comments any time during the consultation and comment period.
ADDRESSES: Send written comments to Mr. Bradley S. Warren, CRSP
Manager, CRSP Management Center, Western Area Power Administration, 150
East Social Hall Avenue, Suite 300, Salt Lake City, UT 84111-1580;
telephone (801) 524-5493; e-mail CRSPMCadj@wapa.gov. Western will post
information about the rate process on its Web site under the ``FY 2009
SLCA/IP Rate Adjustment'' section located at: https://www.wapa.gov/CRSP/
ratescrsp/default.htm.
Western will post official comments received by letter and e-mail
to its Web site after the close of the comment period. Western must
receive written comments by the end of the consultation and comment
period to ensure consideration in Western's decision process.
FOR FURTHER INFORMATION CONTACT: Ms. Carol A. Loftin, Rates Manager,
CRSP Management Center, Western Area Power Administration, 150 East
Social Hall Avenue, Suite 300, Salt Lake City, UT 84111-1580; telephone
(801) 524-6380; e-mail loftinc@wapa.gov.
SUPPLEMENTARY INFORMATION: The proposed rates for SLCA/IP firm power
are designed to return an annual amount of revenue to meet the
repayment of power investment, payment of interest, purchased power,
OM&R expenses, and the repayment of irrigation assistance costs as
required by law.
The Deputy Secretary of Energy approved Rate Schedule SLIP-F8 for
firm power service on August 1, 2005. Rate Schedule SLIP-F8 became
effective on October 1, 2005, for a 5-year period ending September 30,
2010. The Deputy Secretary of Energy also approved a rate extension for
the CRSP Transmission and Ancillary Services Rates through September
30, 2010.
Discussion
Western's SLCA/IP Firm Power, CRSP Transmission and Ancillary
Services rates entered into a rate adjustment process with a Federal
Register notice published on January 4, 2008, which began the initial
public consultation and comment period that would have ended on April
3, 2008. Western seeks an extension of the public process to provide
additional time to finalize the 2010 WPR, which forms the basis of the
OM&R expenses. The 2010 WPR shows significant increases in some program
areas, and Western and the firm power customers need more time to
evaluate these proposed increases. The customers are requesting Western
consider a rate increase that is phased in over a 2-year period, and
Western will provide options for customers'
[[Page 15520]]
comments. In addition, Western is proposing to eliminate the reference
to the ``Western System Power Pool'' in the Rate Schedule for Spinning
and Supplement Reserves (SP-SSR-3) to make it consistent with the other
regions within Western and to clarify better how those rates are
determined. In conjunction with extending the comment and consultation
period, Western will hold an additional public information and public
comment forum.
Legal Authority
Since the proposed rates constitute a major rate adjustment as
defined by 10 CFR part 903, Western has held both a public information
forum and a public comment forum and, as indicated in this notice, will
hold an additional public information and public comment forum. After a
review of public comments and possible amendments or adjustments,
Western will recommend a proposed rate for the Deputy Secretary of
Energy to approve on an interim basis.
Western is establishing firm electric service rates for the SCLA/IP
under the Department of Energy Organization Act (42 U.S.C. 7152); the
Reclamation Act of 1902 (ch. 1093, 32 Stat. 388), as amended and
supplemented by subsequent laws, particularly section 9(c) of the
Reclamation Project Act of 1939 (43 U.S.C. 485h(c)); and other acts
that specifically apply to the projects involved.
By Delegation Order No. 00-037.00, effective December 6, 2001, the
Secretary of Energy delegated: (1) The authority to develop power and
transmission rates to Western's Administrator; (2) the authority to
confirm, approve, and place such rates into effect on an interim basis
to the Deputy Secretary of Energy; and (3) the authority to confirm,
approve, and place into effect on a final basis, to remand, or to
disapprove such rates to the Commission. Existing Department of Energy
(DOE) procedures for public participation in power rate adjustments (10
CFR part 903) were published on September 18, 1985.
Availability of Information
All brochures, studies, comments, letters, memorandums, or other
documents that Western initiates or uses to develop the proposed rates
are available for inspection and copying at the CRSP Management Center,
150 East Social Hall Avenue, Suite 300, Salt Lake City, Utah. Many of
these documents and supporting information are also available on its
Web site under the ``FY 2009 SLCA/IP Rate Adjustment'' section located
at: https://www.wapa.gov/CRSP/ratescrsp/default.htm.
Regulatory Procedure Requirements
Environmental Compliance
In compliance with the National Environmental Policy Act of 1969
(NEPA) (42 U.S.C. 4321, et seq.); the Council on Environmental Quality
Regulations for implementing NEPA (40 CFR parts 1500-1508); and DOE
NEPA Implementing Procedures and Guidelines (10 CFR part 1021), Western
has determined this action is categorically excluded from preparing an
environmental assessment or an environmental impact statement.
Determination Under Executive Order 12866
Western has an exemption from centralized regulatory review under
Executive Order 12866; accordingly, no clearance of this notice by the
Office of Management and Budget is required.
Dated: March 14, 2008.
Timothy J. Meeks,
Administrator.
[FR Doc. E8-5868 Filed 3-21-08; 8:45 am]
BILLING CODE 6450-01-P