TransColorado Gas Transmission Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Love Ranch Relocation Project and Request for Comments on Environmental Issues, 15515-15516 [E8-5852]
Download as PDF
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
Scoping meetings will be recorded by
a stenographer and will become part of
the Commission’s formal record for this
proceeding.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5830 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP05–45–001; CP06–401–001]
TransColorado Gas Transmission
Company; Notice of Intent To Prepare
an Environmental Assessment for the
Proposed Love Ranch Relocation
Project and Request for Comments on
Environmental Issues
mstockstill on PROD1PC66 with NOTICES
March 18, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the potential environmental
impacts of the Love Ranch Relocation
Project involving the relocation of
previously authorized, but uninstalled,
natural gas transmission system
facilities by TransColorado Gas
Transmission Company (TransColorado)
in Rio Blanco County, Colorado. The EA
will be used by the Commission in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on April 18, 2008. Details on how
to submit comments are provided in the
‘‘Public Participation’’ section of this
notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
TransColorado proposes to relocate
two compressor units previously
authorized for installation at the
existing Greasewood Compressor
Station to an alternative site about 6
miles west (referred to as the Love
Ranch Compressor Station site). Both
locations are in Rio Blanco County,
Colorado. Specifically, TransColorado
proposes to amend its authorizations for
both the North Expansion Project in
Docket No. CP05–45–000 and the
Blanco-Meeker Expansion Project in
Docket No. CP06–401–000 to relocate a
2,370 horsepower unit and a 3,550
horsepower unit, respectively, to the
Love Ranch Compressor Station site.
TransColorado further seeks authority to
construct and operate a new
interconnect with Rockies Express
Pipeline, LLC (Rockies Express) at the
existing Meeker Compressor Station.
Both compressor units were originally
authorized to allow TransColorado to
deliver up to 300,000 dekatherms per
day (Dth/d) to Williams Energy
Marketing and Trading Company
(Williams) through Wyoming Interstate
Company’s pipeline system. Installation
of the units was deferred to coincide
with an increase in Williams’ contract
quantities beginning January 1, 2008.
TransColorado states that relocating the
compressor units and the new
interconnect would accommodate the
changing market needs of Williams on
the TransColorado pipeline system and
increases the overall delivery flexibility
of the pipeline. Upon installation of the
two compressors at the Love Ranch
Compressor Station site, TransColorado
would be capable of delivering 130,000
Dth/d to WIC at the Greasewood
Compressor Station and 210,000 Dth/d
to Rockies Express via the proposed
interconnect at the Meeker Compressor
Station.
Construction and operation of the
proposed project would affect 7.2 acres,
including the compressor station (6.75
acres), access road (0.25 acre), and the
meter station (0.2 acre). The compressor
station would be located immediately
adjacent to TransColorado’s existing
natural gas transmission pipeline
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
15515
system on privately-owned rangeland
that is currently used for grazing.
TransColorado would access the site by
a new 230-foot-long by 50-foot-wide
access road off of Rio Blanco County
Road 5.
The general location of the proposed
facilities is shown in appendix 1.1
The EA Process
We 2 are preparing this EA to comply
with the National Environmental Policy
Act (NEPA) which requires the
Commission to take into account the
environmental impact that could result
if it authorizes TransColorado’s
proposal. By this notice, we are also
asking federal, state, and local agencies
with jurisdiction and/or special
expertise with respect to environmental
issues to formally cooperate with us in
the preparation of the EA. Agencies that
would like to request cooperating status
should follow the instructions for filing
comments provided below.
NEPA also requires the FERC to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, we are requesting
public comments on the scope of the
issues to address in the EA. All
comments received will be considered
during the preparation of the EA.
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils
• land use and visual quality
• cultural resources
• vegetation and wildlife (including
threatened and endangered species)
• air quality and noise
• reliability and safety.
We will also evaluate possible
alternatives to the proposed project or
portions of the project, where necessary,
and make recommendations on how to
lessen or avoid impacts on the various
resource areas.
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s
website at the ‘‘eLibrary’’ link or from the
Commission’s Public Reference Room, 888 First
Street, NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary refer to the ‘‘Additional Information’’
section of this notice. Copies of the appendices
were sent to all those receiving this notice in the
mail. Requests for detailed maps of the proposed
facilities should be made directly to TransColorado.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
E:\FR\FM\24MRN1.SGM
24MRN1
15516
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
mstockstill on PROD1PC66 with NOTICES
Our independent analysis of the
issues will be presented in the EA.
Depending on the comments received
during the scoping process, the EA may
be published and mailed to Federal,
State, and local agencies, public interest
groups, interested individuals, affected
landowners, local libraries and
newspapers, and the Commission’s
official service list for this proceeding.
A comment period will be allotted for
review if the EA is published. We will
consider all comments on the EA before
we make our recommendations to the
Commission.
To ensure your comments are
received and considered, please
carefully follow the instructions in the
‘‘Public Participation’’ section below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal
and alternatives to the proposal,
including alternative compressor station
sites and measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Room 1A, Washington, DC 20426;
• Label one copy of the comments for
the attention of Gas Branch 1, PJ–11.1;
• Reference Docket Nos. CP05–45–
001 and CP06–401–001; and
• Mail your comments so that they
will be received in Washington, DC, on
or before April 18, 2008.
Please note that the Commission
strongly encourages electronic filing of
any comments, interventions, or
protests to this proceeding. See Title 18
of the Code of Federal Regulations
(CFR), Part 385.2001(a)(1)(iii) and the
instructions on the Commission’s
Internet Web site at https://www.ferc.gov
under the ‘‘eFiling’’ link and the link to
the User’s Guide. Prepare your
submission in the same manner as you
would if filing on paper and save it to
a file on your hard drive. Before you can
file comments you will need to create an
account by clicking on ‘‘Login to File’’
and then ‘‘New User Account.’’ You will
be asked to select the type of filing you
are making. This filing is considered a
‘‘Comment on Filing.’’ In addition, there
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
is a ‘‘Quick Comment’’ option available,
which is an easy method for interested
persons to submit text only comments
on a project. The Quick-Comment User
Guide can be viewed at https://
www.ferc.gov/docs-filing/efiling/quickcomment-guide.pdf. Quick Comment
does not require a FERC eRegistration
account; however, you will be asked to
provide a valid email address. All
comments submitted under either
eFiling or the Quick Comment option
are placed in the public record for the
specified docket.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor.’’
Intervenors play a more formal role in
the process. Among other things,
intervenors have the right to receive
copies of case-related Commission
documents and filings by other
intervenors. Likewise, each intervenor
must send one electronic copy (using
the Commission’s eFiling system) or 14
paper copies of its filings to the
Secretary of the Commission and must
send a copy of its filings to all other
parties on the Commission’s service list
for this proceeding.
If you want to become an intervenor
you must file a motion to intervene
according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214) (see
appendix 2).3 Only intervenors have the
right to seek rehearing of the
Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Environmental Mailing List
As described above, we may publish
and distribute the EA for comment. If
you are interested in receiving an EA for
review and/or comment, please return
the Environmental Mailing List Form
(appendix 3). If you do not return the
Environmental Mailing List Form, you
will be taken off the mailing list. All
individuals who provide written
comments will remain on our
environmental mailing list for this
project.
3 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, any public meetings or site
visits scheduled for this proposed
project will be posted on the
Commission’s calendar located at
https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5852 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER08–23–000; ER08–23–001;
ER08–23–002]
Massie Power, LLC; Notice of Issuance
of Order
March 17, 2008.
Massie Power, LLC (Massie Power)
filed an application for market-based
rate authority, with an accompanying
market-based rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Massie Power also requested
waivers of various Commission
regulations. In particular, Massie Power
requested that the Commission grant
blanket approval under 18 CFR part 34
of all future issuances of securities and
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 73, Number 57 (Monday, March 24, 2008)]
[Notices]
[Pages 15515-15516]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5852]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP05-45-001; CP06-401-001]
TransColorado Gas Transmission Company; Notice of Intent To
Prepare an Environmental Assessment for the Proposed Love Ranch
Relocation Project and Request for Comments on Environmental Issues
March 18, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the potential environmental impacts of the Love Ranch
Relocation Project involving the relocation of previously authorized,
but uninstalled, natural gas transmission system facilities by
TransColorado Gas Transmission Company (TransColorado) in Rio Blanco
County, Colorado. The EA will be used by the Commission in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help determine which issues
need to be evaluated in the EA. Please note that the scoping period
will close on April 18, 2008. Details on how to submit comments are
provided in the ``Public Participation'' section of this notice.
This notice is being sent to affected landowners; federal, state,
and local government agencies; elected officials; Native American
tribes; other interested parties; and local libraries and newspapers.
State and local government representatives are asked to notify their
constituents of this proposed project and to encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses a number
of typically asked questions, including the use of eminent domain and
how to participate in the Commission's proceedings. It is available for
viewing on the FERC Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
TransColorado proposes to relocate two compressor units previously
authorized for installation at the existing Greasewood Compressor
Station to an alternative site about 6 miles west (referred to as the
Love Ranch Compressor Station site). Both locations are in Rio Blanco
County, Colorado. Specifically, TransColorado proposes to amend its
authorizations for both the North Expansion Project in Docket No. CP05-
45-000 and the Blanco-Meeker Expansion Project in Docket No. CP06-401-
000 to relocate a 2,370 horsepower unit and a 3,550 horsepower unit,
respectively, to the Love Ranch Compressor Station site. TransColorado
further seeks authority to construct and operate a new interconnect
with Rockies Express Pipeline, LLC (Rockies Express) at the existing
Meeker Compressor Station.
Both compressor units were originally authorized to allow
TransColorado to deliver up to 300,000 dekatherms per day (Dth/d) to
Williams Energy Marketing and Trading Company (Williams) through
Wyoming Interstate Company's pipeline system. Installation of the units
was deferred to coincide with an increase in Williams' contract
quantities beginning January 1, 2008. TransColorado states that
relocating the compressor units and the new interconnect would
accommodate the changing market needs of Williams on the TransColorado
pipeline system and increases the overall delivery flexibility of the
pipeline. Upon installation of the two compressors at the Love Ranch
Compressor Station site, TransColorado would be capable of delivering
130,000 Dth/d to WIC at the Greasewood Compressor Station and 210,000
Dth/d to Rockies Express via the proposed interconnect at the Meeker
Compressor Station.
Construction and operation of the proposed project would affect 7.2
acres, including the compressor station (6.75 acres), access road (0.25
acre), and the meter station (0.2 acre). The compressor station would
be located immediately adjacent to TransColorado's existing natural gas
transmission pipeline system on privately-owned rangeland that is
currently used for grazing. TransColorado would access the site by a
new 230-foot-long by 50-foot-wide access road off of Rio Blanco County
Road 5.
The general location of the proposed facilities is shown in
appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's website at the ``eLibrary'' link or
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary refer to the ``Additional Information''
section of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail. Requests for detailed maps
of the proposed facilities should be made directly to TransColorado.
---------------------------------------------------------------------------
The EA Process
We \2\ are preparing this EA to comply with the National
Environmental Policy Act (NEPA) which requires the Commission to take
into account the environmental impact that could result if it
authorizes TransColorado's proposal. By this notice, we are also asking
federal, state, and local agencies with jurisdiction and/or special
expertise with respect to environmental issues to formally cooperate
with us in the preparation of the EA. Agencies that would like to
request cooperating status should follow the instructions for filing
comments provided below.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
NEPA also requires the FERC to discover and address concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
Notice of Intent, we are requesting public comments on the scope of the
issues to address in the EA. All comments received will be considered
during the preparation of the EA.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils
land use and visual quality
cultural resources
vegetation and wildlife (including threatened and endangered
species)
air quality and noise
reliability and safety.
We will also evaluate possible alternatives to the proposed project
or portions of the project, where necessary, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
[[Page 15516]]
Our independent analysis of the issues will be presented in the EA.
Depending on the comments received during the scoping process, the EA
may be published and mailed to Federal, State, and local agencies,
public interest groups, interested individuals, affected landowners,
local libraries and newspapers, and the Commission's official service
list for this proceeding. A comment period will be allotted for review
if the EA is published. We will consider all comments on the EA before
we make our recommendations to the Commission.
To ensure your comments are received and considered, please
carefully follow the instructions in the ``Public Participation''
section below.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the proposal
and alternatives to the proposal, including alternative compressor
station sites and measures to avoid or lessen environmental impact. The
more specific your comments, the more useful they will be. Please
carefully follow these instructions to ensure that your comments are
received in time and properly recorded:
Send an original and two copies of your letter to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of Gas
Branch 1, PJ-11.1;
Reference Docket Nos. CP05-45-001 and CP06-401-001; and
Mail your comments so that they will be received in
Washington, DC, on or before April 18, 2008.
Please note that the Commission strongly encourages electronic
filing of any comments, interventions, or protests to this proceeding.
See Title 18 of the Code of Federal Regulations (CFR), Part
385.2001(a)(1)(iii) and the instructions on the Commission's Internet
Web site at https://www.ferc.gov under the ``eFiling'' link and the link
to the User's Guide. Prepare your submission in the same manner as you
would if filing on paper and save it to a file on your hard drive.
Before you can file comments you will need to create an account by
clicking on ``Login to File'' and then ``New User Account.'' You will
be asked to select the type of filing you are making. This filing is
considered a ``Comment on Filing.'' In addition, there is a ``Quick
Comment'' option available, which is an easy method for interested
persons to submit text only comments on a project. The Quick-Comment
User Guide can be viewed at https://www.ferc.gov/docs-filing/efiling/
quick-comment-guide.pdf. Quick Comment does not require a FERC
eRegistration account; however, you will be asked to provide a valid
email address. All comments submitted under either eFiling or the Quick
Comment option are placed in the public record for the specified
docket.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding known as an
``intervenor.'' Intervenors play a more formal role in the process.
Among other things, intervenors have the right to receive copies of
case-related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding.
If you want to become an intervenor you must file a motion to
intervene according to Rule 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.214) (see appendix 2).\3\ Only intervenors
have the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\3\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
As described above, we may publish and distribute the EA for
comment. If you are interested in receiving an EA for review and/or
comment, please return the Environmental Mailing List Form (appendix
3). If you do not return the Environmental Mailing List Form, you will
be taken off the mailing list. All individuals who provide written
comments will remain on our environmental mailing list for this
project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary''
link. Click on the eLibrary link, then on ``General Search'' and enter
the docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, any public meetings or site visits scheduled for this
proposed project will be posted on the Commission's calendar located at
https://www.ferc.gov/EventCalendar/EventsList.aspx along with other
related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-5852 Filed 3-21-08; 8:45 am]
BILLING CODE 6717-01-P