Food Lion 1194 Wilson, NC; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Cogeneration Facility, 15512-15513 [E8-5848]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
15512
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
California, and has prepared a Final
Environmental Impact Statement (final
EIS) for the projects.
The existing 688-megawatt (MW)
Upper American River Project occupies
6,375 acres of federal land administered
by the U.S. Department of Agriculture,
Forest Service (Forest Service), in
Eldorado National Forest and 42.3 acres
of federal land administered by the U.S.
Department of the Interior, Bureau of
Land Management (BLM). The Forest
Service is reviewing an application for
a special use permit for constructing the
Iowa Hill development on National
Forest System lands. The Forest Service
is also a cooperating agency in
preparing this final EIS for the Upper
American River Project.
Pacific Gas & Electric Company’s 7–
MW Chili Bar Project is located on the
South Fork of the American River
immediately downstream of the Upper
American River Project. The project
occupies 47.81 acres of federal land
administered by the BLM.
In the final EIS, staff evaluates the
applicant’s proposals and alternatives
for relicensing the projects. The final
EIS documents the views of
governmental agencies, nongovernmental organizations, affected
Indian tribes, the public, the license
applicant, and Commission staff.
Copies of the final EIS are available
for review in the Commission’s Public
Reference Branch, Room 2A, located at
888 First Street, NE., Washington, DC
20426. The final EIS also may be viewed
on the Internet at https://www.ferc.gov
under the eLibrary link. Enter the
docket number (either P–2101 or P–
2155) to access the document. For
assistance, contact FERC Online
Support at:
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
CD versions of the final EIS have been
mailed to everyone on the mailing list
for the projects. Copies of the CD, as
well as a limited number of paper
copies, are available from the Public
Reference Room identified above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to these or other pending
projects. For assistance, contact FERC
Online Support.
For further information, contact James
Fargo at (202) 502–6095 or at:
james.fargo@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5831 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on April 2, 2008.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL08–46–000]
MMC Energy, Inc., Complainant, v.
California Independent System
Operator, Inc., Respondent; Notice of
Complaint
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5828 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
March 14, 2008.
Take notice that on March 13, 2008,
MMC Energy, Inc. (MMC), filed a formal
complaint against California
Independent System Operator, Inc.
(CASIO), pursuant to sections 206 and
306 of the Federal Power Act, 16 U.S.C.
824e and 825e (2000), and Rule 206 of
the Commission’s Rules of Practice and
Procedures, 18 CFR 385.206 (2007),
alleging that the CAISO has unlawfully
failed to allow three generating facilities
owned by MMC to fully participate in
the spinning reserve ancillary services
market.
MMC certifies that copies of the
complaint were served on the contacts
for CAISO as listed on the Commission’s
list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. QF08–419–000]
Food Lion 1194 Wilson, NC; Notice of
Filing of Notice of Self-Certification of
Qualifying Status of a Cogeneration
Facility
March 18, 2008.
Take notice that on March 5, 2008,
Food Lion, LLC, 2110 Executive Drive,
Salisbury, NC 28145 filed with the
Federal Energy Regulatory Commission
a notice of self-certification of a facility
as a qualifying cogeneration facility
pursuant to 18 CFR 292.207(a) of the
Commission’s regulations.
This qualifying cogeneration facility
consist of a 350 kW packaged diesel
engine generator set operating on #2 fuel
oil. This package is set on a concrete
pad. The unit is self-contained,
including all necessary switchgear and
controls. The electricity is generated at
208 V, 3 phase, 60 Hz. The facility is
located at 2021 Lipscombe Road,
Wilson, NC 27893.
This qualifying facility interconnects
with Wilson Energy’s electric
distribution system. The facility will
provide standby power and occasionally
supplementary power to Food Lion.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification provides notice that the
entity making the filing has determined
the Facility meets the applicable criteria
to be a qualifying facility. Any person
seeking to challenge such qualifying
facility status may do so by filing a
motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
E:\FR\FM\24MRN1.SGM
24MRN1
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
15513
Comment Date: 5 p.m. Eastern Time
on March 20, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5851 Filed 3–21–08; 8:45 am]
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5829 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5848 Filed 3–21–08; 8:45 am]
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
BILLING CODE 6717–01–P
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12707–001]
[Docket No. OA07–36–001]
[Docket No. QF08–418–000]
Food Lion 2552 Wilson, NC; Notice of
Filing of Notice of Self-Certification of
Qualifying Status of a Cogeneration
Facility
mstockstill on PROD1PC66 with NOTICES
March 18, 2008.
Take notice that on March 5, 2008,
Food Lion, LLC, 2110 Executive Drive,
Salisbury, NC 28145 filed with the
Federal Energy Regulatory Commission
a notice of self-certification of a facility
as a qualifying cogeneration facility
pursuant to 18 CFR 292.207(a) of the
Commission’s regulations.
This qualifying cogeneration facility
consists of a 350 kW packaged diesel
engine generator set operating on #2 fuel
oil. This package is set on a concrete
pad. The unit is self-contained,
including all necessary switchgear and
controls. The electricity is generated at
208 V, 3 phase, 60 Hz. The facility is
located at 3711 Peppermill Drive North,
Wilson, NC 27893.
This qualifying facility interconnects
with Wilson Energy’s electric
distribution system. The facility will
provide standby power and occasionally
supplementary power to Food Lion.
A notice of self-certification does not
institute a proceeding regarding
qualifying facility status; a notice of selfcertification provides notice that the
entity making the filing has determined
the Facility meets the applicable criteria
to be a qualifying facility. Any person
seeking to challenge such qualifying
facility status may do so by filing a
motion pursuant to 18 CFR
292.207(d)(iii).
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
South Carolina Electric & Gas
Company; Notice of Filing
March 14, 2008.
Take notice that on February 28, 2008,
South Carolina Electric & Gas Company
filed a compliance filing in response to
the Commission’s January 31, 2008
Order, South Carolina Electric & Gas
Company, 122 FERC ¶ 61,070 (2008).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
Hook Canyon Energy, LLC; Notice of
Intent to File License Application,
Filing of Pre-Application Document
(PAD), Commencement of Licensing
Proceeding, Scoping, Solicitation of
Comments on the PAD and Scoping
Document, and Identification of Issues
and Associated Study Requests
March 14, 2008.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Licensing
Proceeding.
b. Project No.: 12707–001.
c. Dated Filed: September 10, 2007.
d. Submitted by: Hook Canyon
Energy, LLC.
e. Name of Project: Hook Canyon
Pump Storage Project.
f. Location: The project would be
located in Rich County, Utah and Bear
Lake County, Idaho. The project’s upper
reservoir would be constructed in Hook
Canyon on the eastern side of Bear Lake.
Bear Lake would be the project’s lower
reservoir. The proposed project would
not occupy any federal lands.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact: Brent
Smith, Symbiotics LLC, P.O. Box 535,
Rigby, ID 83442; (208) 745–0834.
i. FERC Contact: Steve Hocking at
steve.hocking@ferc.gov or (202) 502–
8753.
j. We are asking federal, state, local,
and tribal agencies with jurisdiction
and/or special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in paragraph o
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of an environmental
document cannot also intervene in that
same proceeding. See, 94 FERC ¶ 61,076
(2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 73, Number 57 (Monday, March 24, 2008)]
[Notices]
[Pages 15512-15513]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5848]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. QF08-419-000]
Food Lion 1194 Wilson, NC; Notice of Filing of Notice of Self-
Certification of Qualifying Status of a Cogeneration Facility
March 18, 2008.
Take notice that on March 5, 2008, Food Lion, LLC, 2110 Executive
Drive, Salisbury, NC 28145 filed with the Federal Energy Regulatory
Commission a notice of self-certification of a facility as a qualifying
cogeneration facility pursuant to 18 CFR 292.207(a) of the Commission's
regulations.
This qualifying cogeneration facility consist of a 350 kW packaged
diesel engine generator set operating on 2 fuel oil. This
package is set on a concrete pad. The unit is self-contained, including
all necessary switchgear and controls. The electricity is generated at
208 V, 3 phase, 60 Hz. The facility is located at 2021 Lipscombe Road,
Wilson, NC 27893.
This qualifying facility interconnects with Wilson Energy's
electric distribution system. The facility will provide standby power
and occasionally supplementary power to Food Lion.
A notice of self-certification does not institute a proceeding
regarding qualifying facility status; a notice of self-certification
provides notice that the entity making the filing has determined the
Facility meets the applicable criteria to be a qualifying facility. Any
person seeking to challenge such qualifying facility status may do so
by filing a motion pursuant to 18 CFR 292.207(d)(iii).
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
[[Page 15513]]
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Kimberly D. Bose,
Secretary.