Food Lion 1194 Wilson, NC; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Cogeneration Facility, 15512-15513 [E8-5848]

Download as PDF mstockstill on PROD1PC66 with NOTICES 15512 Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices California, and has prepared a Final Environmental Impact Statement (final EIS) for the projects. The existing 688-megawatt (MW) Upper American River Project occupies 6,375 acres of federal land administered by the U.S. Department of Agriculture, Forest Service (Forest Service), in Eldorado National Forest and 42.3 acres of federal land administered by the U.S. Department of the Interior, Bureau of Land Management (BLM). The Forest Service is reviewing an application for a special use permit for constructing the Iowa Hill development on National Forest System lands. The Forest Service is also a cooperating agency in preparing this final EIS for the Upper American River Project. Pacific Gas & Electric Company’s 7– MW Chili Bar Project is located on the South Fork of the American River immediately downstream of the Upper American River Project. The project occupies 47.81 acres of federal land administered by the BLM. In the final EIS, staff evaluates the applicant’s proposals and alternatives for relicensing the projects. The final EIS documents the views of governmental agencies, nongovernmental organizations, affected Indian tribes, the public, the license applicant, and Commission staff. Copies of the final EIS are available for review in the Commission’s Public Reference Branch, Room 2A, located at 888 First Street, NE., Washington, DC 20426. The final EIS also may be viewed on the Internet at https://www.ferc.gov under the eLibrary link. Enter the docket number (either P–2101 or P– 2155) to access the document. For assistance, contact FERC Online Support at: FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. CD versions of the final EIS have been mailed to everyone on the mailing list for the projects. Copies of the CD, as well as a limited number of paper copies, are available from the Public Reference Room identified above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to these or other pending projects. For assistance, contact FERC Online Support. For further information, contact James Fargo at (202) 502–6095 or at: james.fargo@ferc.gov. Kimberly D. Bose, Secretary. [FR Doc. E8–5831 Filed 3–21–08; 8:45 am] BILLING CODE 6717–01–P VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on April 2, 2008. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL08–46–000] MMC Energy, Inc., Complainant, v. California Independent System Operator, Inc., Respondent; Notice of Complaint Kimberly D. Bose, Secretary. [FR Doc. E8–5828 Filed 3–21–08; 8:45 am] BILLING CODE 6717–01–P March 14, 2008. Take notice that on March 13, 2008, MMC Energy, Inc. (MMC), filed a formal complaint against California Independent System Operator, Inc. (CASIO), pursuant to sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824e and 825e (2000), and Rule 206 of the Commission’s Rules of Practice and Procedures, 18 CFR 385.206 (2007), alleging that the CAISO has unlawfully failed to allow three generating facilities owned by MMC to fully participate in the spinning reserve ancillary services market. MMC certifies that copies of the complaint were served on the contacts for CAISO as listed on the Commission’s list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. QF08–419–000] Food Lion 1194 Wilson, NC; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Cogeneration Facility March 18, 2008. Take notice that on March 5, 2008, Food Lion, LLC, 2110 Executive Drive, Salisbury, NC 28145 filed with the Federal Energy Regulatory Commission a notice of self-certification of a facility as a qualifying cogeneration facility pursuant to 18 CFR 292.207(a) of the Commission’s regulations. This qualifying cogeneration facility consist of a 350 kW packaged diesel engine generator set operating on #2 fuel oil. This package is set on a concrete pad. The unit is self-contained, including all necessary switchgear and controls. The electricity is generated at 208 V, 3 phase, 60 Hz. The facility is located at 2021 Lipscombe Road, Wilson, NC 27893. This qualifying facility interconnects with Wilson Energy’s electric distribution system. The facility will provide standby power and occasionally supplementary power to Food Lion. A notice of self-certification does not institute a proceeding regarding qualifying facility status; a notice of selfcertification provides notice that the entity making the filing has determined the Facility meets the applicable criteria to be a qualifying facility. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail E:\FR\FM\24MRN1.SGM 24MRN1 Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices 15513 Comment Date: 5 p.m. Eastern Time on March 20, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–5851 Filed 3–21–08; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E8–5829 Filed 3–21–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Kimberly D. Bose, Secretary. [FR Doc. E8–5848 Filed 3–21–08; 8:45 am] (866) 208–3676 (toll free). For TTY, call (202) 502–8659. BILLING CODE 6717–01–P FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Federal Energy Regulatory Commission BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12707–001] [Docket No. OA07–36–001] [Docket No. QF08–418–000] Food Lion 2552 Wilson, NC; Notice of Filing of Notice of Self-Certification of Qualifying Status of a Cogeneration Facility mstockstill on PROD1PC66 with NOTICES March 18, 2008. Take notice that on March 5, 2008, Food Lion, LLC, 2110 Executive Drive, Salisbury, NC 28145 filed with the Federal Energy Regulatory Commission a notice of self-certification of a facility as a qualifying cogeneration facility pursuant to 18 CFR 292.207(a) of the Commission’s regulations. This qualifying cogeneration facility consists of a 350 kW packaged diesel engine generator set operating on #2 fuel oil. This package is set on a concrete pad. The unit is self-contained, including all necessary switchgear and controls. The electricity is generated at 208 V, 3 phase, 60 Hz. The facility is located at 3711 Peppermill Drive North, Wilson, NC 27893. This qualifying facility interconnects with Wilson Energy’s electric distribution system. The facility will provide standby power and occasionally supplementary power to Food Lion. A notice of self-certification does not institute a proceeding regarding qualifying facility status; a notice of selfcertification provides notice that the entity making the filing has determined the Facility meets the applicable criteria to be a qualifying facility. Any person seeking to challenge such qualifying facility status may do so by filing a motion pursuant to 18 CFR 292.207(d)(iii). This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 South Carolina Electric & Gas Company; Notice of Filing March 14, 2008. Take notice that on February 28, 2008, South Carolina Electric & Gas Company filed a compliance filing in response to the Commission’s January 31, 2008 Order, South Carolina Electric & Gas Company, 122 FERC ¶ 61,070 (2008). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 Hook Canyon Energy, LLC; Notice of Intent to File License Application, Filing of Pre-Application Document (PAD), Commencement of Licensing Proceeding, Scoping, Solicitation of Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests March 14, 2008. a. Type of Filing: Notice of Intent to File License Application for a New License and Commencing Licensing Proceeding. b. Project No.: 12707–001. c. Dated Filed: September 10, 2007. d. Submitted by: Hook Canyon Energy, LLC. e. Name of Project: Hook Canyon Pump Storage Project. f. Location: The project would be located in Rich County, Utah and Bear Lake County, Idaho. The project’s upper reservoir would be constructed in Hook Canyon on the eastern side of Bear Lake. Bear Lake would be the project’s lower reservoir. The proposed project would not occupy any federal lands. g. Filed Pursuant to: 18 CFR Part 5 of the Commission’s Regulations. h. Potential Applicant Contact: Brent Smith, Symbiotics LLC, P.O. Box 535, Rigby, ID 83442; (208) 745–0834. i. FERC Contact: Steve Hocking at steve.hocking@ferc.gov or (202) 502– 8753. j. We are asking federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues to cooperate with us in the preparation of the environmental document. Agencies who would like to request cooperating status should follow the instructions for filing comments described in paragraph o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of an environmental document cannot also intervene in that same proceeding. See, 94 FERC ¶ 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) The U.S. E:\FR\FM\24MRN1.SGM 24MRN1

Agencies

[Federal Register Volume 73, Number 57 (Monday, March 24, 2008)]
[Notices]
[Pages 15512-15513]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5848]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. QF08-419-000]


Food Lion 1194 Wilson, NC; Notice of Filing of Notice of Self-
Certification of Qualifying Status of a Cogeneration Facility

March 18, 2008.
    Take notice that on March 5, 2008, Food Lion, LLC, 2110 Executive 
Drive, Salisbury, NC 28145 filed with the Federal Energy Regulatory 
Commission a notice of self-certification of a facility as a qualifying 
cogeneration facility pursuant to 18 CFR 292.207(a) of the Commission's 
regulations.
    This qualifying cogeneration facility consist of a 350 kW packaged 
diesel engine generator set operating on 2 fuel oil. This 
package is set on a concrete pad. The unit is self-contained, including 
all necessary switchgear and controls. The electricity is generated at 
208 V, 3 phase, 60 Hz. The facility is located at 2021 Lipscombe Road, 
Wilson, NC 27893.
    This qualifying facility interconnects with Wilson Energy's 
electric distribution system. The facility will provide standby power 
and occasionally supplementary power to Food Lion.
    A notice of self-certification does not institute a proceeding 
regarding qualifying facility status; a notice of self-certification 
provides notice that the entity making the filing has determined the 
Facility meets the applicable criteria to be a qualifying facility. Any 
person seeking to challenge such qualifying facility status may do so 
by filing a motion pursuant to 18 CFR 292.207(d)(iii).
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail

[[Page 15513]]

FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Kimberly D. Bose,
Secretary.
[FR Doc. E8-5848 Filed 3-21-08; 8:45 am]