Howell Heflin Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 15502-15503 [E8-5845]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
15502
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
applicable during the April 2008
outages to the period commencing on
the first gas day of the first outage
through and including the 30th gas day
following the second outage. This
amendment will allow Gulfstream’s firm
customers who take loans of line pack
during the April 2008 outages up to 30
days following the end of the second
outage to return all line pack taken
during both outages. In addition, in
order to ensure that the firm shippers
have a timely understanding of the
availability of, and cost associated with,
the parking and lending services
described in the Petition, as amended,
Gulfstream requests that the
Commission expedite action on the
amended Petition, shorten the notice
period to five days from the date of this
filing, and grant the Petition by March
21, 2008.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
Tuesday, March 18, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5827 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13000–000]
Howell Heflin Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene,
Protests, and Comments
March 17, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 13000–000.
c. Date filed: September 7, 2007.
d. Applicant: Howell Heflin Hydro,
LLC.
e. Name of Project: Howell Heflin
Lock and Dam Hydroelectric Project.
f. Location: Tombigbee River in
Greene County, Alabama. It would use
the U.S. Army Corps of Engineers’
Howell Heflin Lock and Dam.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Brent L.
Smith, COO, Symbiotics, LLC, P.O. Box
535, Rigby, ID 83442, (208) 745–0834.
i. FERC Contact: Robert Bell, (202)
502–4126.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–13000–000) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project using the U.S. Army
Corps of Engineers’ Howell Heflin Lock
and Dam and operated in a run-of-river
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
mode would consist of: (1) A new
powerhouse and switchyard; (2) four
turbine/generator units with a combined
installed capacity of 44 megawatts; (3) a
new 2-mile-long above ground 69kilovolt transmission line extending
from the switchyard to an
interconnection point with the utility
distribution system owned by Black
Warrior Electric Membership
Corporation; and (4) appurtenant
facilities. The proposed Howell Heflin
Lock and Dam Project would have an
average annual generation of 125
gigawatt-hours.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCONLINESUPPORT@FERC.GOV.
For TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item h
above.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
n. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
E:\FR\FM\24MRN1.SGM
24MRN1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5845 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 618–175]
Alabama Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
March 14, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for
Temporary Variance of Minimum Flow
Requirement.
b. Project No.: 618–175.
c. Date Filed: March 13, 2008.
d. Applicant: Alabama Power
Company.
e. Name of Project: Jordan Dam.
f. Location: On the Coosa River, in
Elmore, Chilton, and Coosa Counties,
Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Barry Lovett,
Alabama Power Company, 600 N. 18th
Street, P.O. Box 2641, Birmingham, AL
35291, (205) 257–1258.
i. FERC Contact: Peter Yarrington,
peter.yarrington@ferc.gov, (202) 502–
6129.
j. Deadline for filing comments,
motions to intervene and protests:
March 28, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
15503
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Alabama
Power Company (APC) is requesting a
temporary variance of the Jordan Dam
Project’s minimum flow requirements
due to continuing drought conditions in
the southeast, and to ensure, to the
extent possible, that there will be
sufficient water available in the Coosa
River to support both reservoir and
downstream environmental, municipal
and industrial water supply and
navigation needs. Beginning April 1, the
project license requires a continuous
minimum base flow of 4,000 cubic feet
per second (cfs) for 18 hours per day
and a pulse flow release for 6 hours per
day. During June, the base and pulse
flows are ramped down in daily
increments, to a continuous 2,000 cfs,
which is required up to March 31. APC
is requesting a variance to release from
Jordan Dam no less than a continuous
flow of 2,000 cfs (± 5 percent) from
April 1 through December 31, 2008,
unless further reduction in flows
becomes necessary to address
emergency operating conditions. Any
reduction in flows would be achieved
by ramping down flows by no more than
66.7 cfs per day. The licensee is also
proposing to conduct weekly conference
calls with the resource agencies to
discuss project releases and operations
to address drought related issues.
l. Location of the Application: The
filing is available for inspection and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street, NE., Room 2A, Washington,
DC 20426 or by calling (202) 502–8371,
or by calling (202) 502–8371. This filing
may also be viewed on the
Commission’s Web site at https://ferc.gov
using the ‘‘eLibrary’’ link. Enter the
docket number (P–618) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docsfiling/
esubscription.asp to be notified via email or new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 73, Number 57 (Monday, March 24, 2008)]
[Notices]
[Pages 15502-15503]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5845]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13000-000]
Howell Heflin Hydro, LLC; Notice of Application Accepted for
Filing and Soliciting Motions To Intervene, Protests, and Comments
March 17, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 13000-000.
c. Date filed: September 7, 2007.
d. Applicant: Howell Heflin Hydro, LLC.
e. Name of Project: Howell Heflin Lock and Dam Hydroelectric
Project.
f. Location: Tombigbee River in Greene County, Alabama. It would
use the U.S. Army Corps of Engineers' Howell Heflin Lock and Dam.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Brent L. Smith, COO, Symbiotics, LLC,
P.O. Box 535, Rigby, ID 83442, (208) 745-0834.
i. FERC Contact: Robert Bell, (202) 502-4126.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Comments, protests, and interventions may be
filed electronically via the Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. The Commission strongly encourages
electronic filings. Please include the project number (P-13000-000) on
any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project using the U.S. Army
Corps of Engineers' Howell Heflin Lock and Dam and operated in a run-
of-river mode would consist of: (1) A new powerhouse and switchyard;
(2) four turbine/generator units with a combined installed capacity of
44 megawatts; (3) a new 2-mile-long above ground 69-kilovolt
transmission line extending from the switchyard to an interconnection
point with the utility distribution system owned by Black Warrior
Electric Membership Corporation; and (4) appurtenant facilities. The
proposed Howell Heflin Lock and Dam Project would have an average
annual generation of 125 gigawatt-hours.
l. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, call toll-free 1-866-208-3676 or
e-mail FERCONLINESUPPORT@FERC.GOV. For TTY, call (202) 502-8659. A copy
is also available for inspection and reproduction at the address in
item h above.
m. Competing Preliminary Permit--Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR 4.30
and 4.36.
n. Competing Development Application--Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30 and 4.36.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include
[[Page 15503]]
an unequivocal statement of intent to submit, if such an application
may be filed, either a preliminary permit application or a development
application (specify which type of application). A notice of intent
must be served on the applicant(s) named in this public notice.
p. Proposed Scope of Studies Under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
r. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT
TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'',
``PROTEST'', and ``MOTION TO INTERVENE'', as applicable, and the
Project Number of the particular application to which the filing
refers. Any of the above-named documents must be filed by providing the
original and the number of copies provided by the Commission's
regulations to: The Secretary, Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC 20426. An additional copy must be
sent to Director, Division of Hydropower Administration and Compliance,
Federal Energy Regulatory Commission, at the above-mentioned address. A
copy of any notice of intent, competing application or motion to
intervene must also be served upon each representative of the Applicant
specified in the particular application.
s. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-5845 Filed 3-21-08; 8:45 am]