Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 15503-15504 [E8-5832]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
r. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
s. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5845 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 618–175]
Alabama Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
March 14, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Request for
Temporary Variance of Minimum Flow
Requirement.
b. Project No.: 618–175.
c. Date Filed: March 13, 2008.
d. Applicant: Alabama Power
Company.
e. Name of Project: Jordan Dam.
f. Location: On the Coosa River, in
Elmore, Chilton, and Coosa Counties,
Alabama.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Barry Lovett,
Alabama Power Company, 600 N. 18th
Street, P.O. Box 2641, Birmingham, AL
35291, (205) 257–1258.
i. FERC Contact: Peter Yarrington,
peter.yarrington@ferc.gov, (202) 502–
6129.
j. Deadline for filing comments,
motions to intervene and protests:
March 28, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
15503
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Alabama
Power Company (APC) is requesting a
temporary variance of the Jordan Dam
Project’s minimum flow requirements
due to continuing drought conditions in
the southeast, and to ensure, to the
extent possible, that there will be
sufficient water available in the Coosa
River to support both reservoir and
downstream environmental, municipal
and industrial water supply and
navigation needs. Beginning April 1, the
project license requires a continuous
minimum base flow of 4,000 cubic feet
per second (cfs) for 18 hours per day
and a pulse flow release for 6 hours per
day. During June, the base and pulse
flows are ramped down in daily
increments, to a continuous 2,000 cfs,
which is required up to March 31. APC
is requesting a variance to release from
Jordan Dam no less than a continuous
flow of 2,000 cfs (± 5 percent) from
April 1 through December 31, 2008,
unless further reduction in flows
becomes necessary to address
emergency operating conditions. Any
reduction in flows would be achieved
by ramping down flows by no more than
66.7 cfs per day. The licensee is also
proposing to conduct weekly conference
calls with the resource agencies to
discuss project releases and operations
to address drought related issues.
l. Location of the Application: The
filing is available for inspection and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street, NE., Room 2A, Washington,
DC 20426 or by calling (202) 502–8371,
or by calling (202) 502–8371. This filing
may also be viewed on the
Commission’s Web site at https://ferc.gov
using the ‘‘eLibrary’’ link. Enter the
docket number (P–618) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docsfiling/
esubscription.asp to be notified via email or new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
E:\FR\FM\24MRN1.SGM
24MRN1
15504
Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(I)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5832 Filed 3–21–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12991–000]
Kentucky Hydro 2, LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene,
Protests, and Comments
mstockstill on PROD1PC66 with NOTICES
March 17, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 12991–000.
c. Date filed: September 10, 2007.
d. Applicant: Kentucky Hydro 2, LLC.
e. Name of Project: Kentucky River
Lock and Dam #2 Hydroelectric Project.
VerDate Aug<31>2005
16:33 Mar 21, 2008
Jkt 214001
f. Location: Kentucky River in Henry
County, Kentucky. It would use the U.S.
Army Corps of Engineers’ Kentucky
River Lock and Dam #2.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Brent L.
Smith, COO, Symbiotics, LLC, P.O. Box
535, Rigby, ID 83442, (208) 745–0834.
i. FERC Contact: Robert Bell, (202)
502–4126.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings. Please include the
project number (P–12991–000) on any
comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project using the U.S. Army
Corps of Engineers’ Kentucky River
Lock and Dam #2 and operated in a runof-river mode would consist of: (1) A
new powerhouse and switchyard; (2)
two turbine/generator units with a
combined installed capacity of 13
megawatts; (3) a new 3-mile-long above
ground 25-kilovolt transmission line
extending from the switchyard to an
interconnection point with the local
utility’s distribution system; and (4)
appurtenant facilities. The proposed
Kentucky River Lock and Dam #2
Project would have an average annual
generation of 39 gigawatt-hours.
l. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or e-mail
FERCONLINESUPPORT@FERC.GOV.
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
For TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item h
above.
m. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
n. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
q. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
E:\FR\FM\24MRN1.SGM
24MRN1
Agencies
[Federal Register Volume 73, Number 57 (Monday, March 24, 2008)]
[Notices]
[Pages 15503-15504]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5832]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 618-175]
Alabama Power Company; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
March 14, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Request for Temporary Variance of Minimum
Flow Requirement.
b. Project No.: 618-175.
c. Date Filed: March 13, 2008.
d. Applicant: Alabama Power Company.
e. Name of Project: Jordan Dam.
f. Location: On the Coosa River, in Elmore, Chilton, and Coosa
Counties, Alabama.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Barry Lovett, Alabama Power Company, 600 N.
18th Street, P.O. Box 2641, Birmingham, AL 35291, (205) 257-1258.
i. FERC Contact: Peter Yarrington, peter.yarrington@ferc.gov, (202)
502-6129.
j. Deadline for filing comments, motions to intervene and protests:
March 28, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: Alabama Power Company (APC) is
requesting a temporary variance of the Jordan Dam Project's minimum
flow requirements due to continuing drought conditions in the
southeast, and to ensure, to the extent possible, that there will be
sufficient water available in the Coosa River to support both reservoir
and downstream environmental, municipal and industrial water supply and
navigation needs. Beginning April 1, the project license requires a
continuous minimum base flow of 4,000 cubic feet per second (cfs) for
18 hours per day and a pulse flow release for 6 hours per day. During
June, the base and pulse flows are ramped down in daily increments, to
a continuous 2,000 cfs, which is required up to March 31. APC is
requesting a variance to release from Jordan Dam no less than a
continuous flow of 2,000 cfs ( 5 percent) from April 1
through December 31, 2008, unless further reduction in flows becomes
necessary to address emergency operating conditions. Any reduction in
flows would be achieved by ramping down flows by no more than 66.7 cfs
per day. The licensee is also proposing to conduct weekly conference
calls with the resource agencies to discuss project releases and
operations to address drought related issues.
l. Location of the Application: The filing is available for
inspection and reproduction at the Commission's Public Reference Room,
located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by
calling (202) 502-8371, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's Web site at https://ferc.gov using
the ``eLibrary'' link. Enter the docket number (P-618) in the docket
number field to access the document. You may also register online at
https://www.ferc.gov/docsfiling/esubscription.asp to be notified via e-
mail or new filings and issuances related to this or other pending
projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
[[Page 15504]]
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-5832 Filed 3-21-08; 8:45 am]
BILLING CODE 6717-01-P