Pacific Gas and Electric Company; Notice of Availability of Environmental Assessment, 14981 [E8-5595]
Download as PDF
Federal Register / Vol. 73, No. 55 / Thursday, March 20, 2008 / Notices
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5596 Filed 3–19–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 77–187]
Pacific Gas and Electric Company;
Notice of Availability of Environmental
Assessment
March 13, 2008.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s regulations,
18 CFR part 380 (Order No. 486, 52 FR
47879), the Commission has reviewed
an application, filed January 31, 2008,
requesting approval to temporarily
amend article 52 of the Potter Valley
Project license. The project is located on
the Eel River and the East Branch
Item No.
Russian River in Lake and Mendocino
Counties, California.
Pacific Gas and Electric Company
(licensee for the Potter Valley Project)
requested approval to allow the
diversion of additional water from the
Eel River through the Potter Valley
powerhouse for use by Potter Valley
Irrigation District (PVID) for frost
protection of commercial crops. The
additional water would be provided to
PVID between March 15 and April 14,
2008. The licensee would restore in
Lake Pillsbury all additional water
diverted for frost protection, starting on
April 15, 2008, resulting in a waterneutral situation.
An environmental assessment (EA),
prepared by Commission staff in the
Office of Energy Projects, analyzed the
probable environmental effects of the
proposed amendment and has
concluded that approval would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the EA is available for
review at the Commission or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access
documents. For assistance, contact
FERC Online Support at
ferconlinesupport@ferc.gov or toll-free
at 1–866–208–3676, or for TTY, (202)
502–8659.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5595 Filed 3–19–08; 8:45 am]
931th—Meeting
BILLING CODE 6717–01–P
14981
March 20, 2008, 10 a.m.
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
March 13, 2008.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
Federal
Energy Regulatory Commission.
AGENCY HOLDING MEETING:
DATE AND TIME:
March 20, 2008, 10 a.m.
Room 2C, 888 First Street, NE.,
Washington, DC 20426.
PLACE:
STATUS:
Open.
Agenda.
Note—Items listed on the agenda may
be deleted without further notice.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400. For a recorded message
listing items struck from or added to the
meeting, call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://www.ferc.gov using the
eLibrary link, or may be examined in
the Commission’s Public Reference
Room.
Regular Meeting
Docket No.
Company
ADMINISTRATIVE
A–1 ..................................................
A–2 ..................................................
A–3 ..................................................
AD02–1–000 ..................................
AD02–7–000 ..................................
AD06–3–000 ..................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
ELECTRIC
E–1 ..................................................
E–2 ..................................................
OMITTED.
RM08–3–000 .................................
E–3 ..................................................
AD07–12–000 ................................
E–4 ..................................................
RR06–1–012 ..................................
mstockstill on PROD1PC66 with NOTICES
RR07–1–002 ..................................
RR07–2–002 ..................................
RR07–3–002 ..................................
RR07–4–002 ..................................
VerDate Aug<31>2005
16:44 Mar 19, 2008
Jkt 214001
PO 00000
Frm 00026
Fmt 4703
Mandatory Reliability Standard for Nuclear Plant Interface Coordination.
Reliability Standard Compliance and Enforcement in Regions with
Regional Transmission Organizations or Independent System Operators.
North American Electric Reliability Council, North American Electric
Reliability Corporation.
Delegation Agreement Between the North American Electric Reliability Corporation and Texas Regional Entity, a division of
ERCOT.
Delegation Agreement Between the North American Electric Reliability Corporation and Midwest Reliability Organization.
Delegation Agreement Between the North American Electric Reliability Corporation and Northeast Power Coordinating Council, Inc.
Delegation Agreement Between the North American Electric Reliability Corporation and ReliabilityFirst Corporation.
Sfmt 4703
E:\FR\FM\20MRN1.SGM
20MRN1
Agencies
[Federal Register Volume 73, Number 55 (Thursday, March 20, 2008)]
[Notices]
[Page 14981]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5595]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 77-187]
Pacific Gas and Electric Company; Notice of Availability of
Environmental Assessment
March 13, 2008.
In accordance with the National Environmental Policy Act of 1969,
as amended, and the Federal Energy Regulatory Commission's regulations,
18 CFR part 380 (Order No. 486, 52 FR 47879), the Commission has
reviewed an application, filed January 31, 2008, requesting approval to
temporarily amend article 52 of the Potter Valley Project license. The
project is located on the Eel River and the East Branch Russian River
in Lake and Mendocino Counties, California.
Pacific Gas and Electric Company (licensee for the Potter Valley
Project) requested approval to allow the diversion of additional water
from the Eel River through the Potter Valley powerhouse for use by
Potter Valley Irrigation District (PVID) for frost protection of
commercial crops. The additional water would be provided to PVID
between March 15 and April 14, 2008. The licensee would restore in Lake
Pillsbury all additional water diverted for frost protection, starting
on April 15, 2008, resulting in a water-neutral situation.
An environmental assessment (EA), prepared by Commission staff in
the Office of Energy Projects, analyzed the probable environmental
effects of the proposed amendment and has concluded that approval would
not constitute a major federal action significantly affecting the
quality of the human environment.
A copy of the EA is available for review at the Commission or may
be viewed on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access documents. For assistance,
contact FERC Online Support at ferconlinesupport@ferc.gov or toll-free
at 1-866-208-3676, or for TTY, (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-5595 Filed 3-19-08; 8:45 am]
BILLING CODE 6717-01-P