Sunshine Act Meeting Notice, 14981-14983 [E8-5582]
Download as PDF
Federal Register / Vol. 73, No. 55 / Thursday, March 20, 2008 / Notices
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5596 Filed 3–19–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 77–187]
Pacific Gas and Electric Company;
Notice of Availability of Environmental
Assessment
March 13, 2008.
In accordance with the National
Environmental Policy Act of 1969, as
amended, and the Federal Energy
Regulatory Commission’s regulations,
18 CFR part 380 (Order No. 486, 52 FR
47879), the Commission has reviewed
an application, filed January 31, 2008,
requesting approval to temporarily
amend article 52 of the Potter Valley
Project license. The project is located on
the Eel River and the East Branch
Item No.
Russian River in Lake and Mendocino
Counties, California.
Pacific Gas and Electric Company
(licensee for the Potter Valley Project)
requested approval to allow the
diversion of additional water from the
Eel River through the Potter Valley
powerhouse for use by Potter Valley
Irrigation District (PVID) for frost
protection of commercial crops. The
additional water would be provided to
PVID between March 15 and April 14,
2008. The licensee would restore in
Lake Pillsbury all additional water
diverted for frost protection, starting on
April 15, 2008, resulting in a waterneutral situation.
An environmental assessment (EA),
prepared by Commission staff in the
Office of Energy Projects, analyzed the
probable environmental effects of the
proposed amendment and has
concluded that approval would not
constitute a major federal action
significantly affecting the quality of the
human environment.
A copy of the EA is available for
review at the Commission or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access
documents. For assistance, contact
FERC Online Support at
ferconlinesupport@ferc.gov or toll-free
at 1–866–208–3676, or for TTY, (202)
502–8659.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5595 Filed 3–19–08; 8:45 am]
931th—Meeting
BILLING CODE 6717–01–P
14981
March 20, 2008, 10 a.m.
Federal Energy Regulatory
Commission
Sunshine Act Meeting Notice
March 13, 2008.
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. No. 94–409), 5 U.S.C. 552b:
Federal
Energy Regulatory Commission.
AGENCY HOLDING MEETING:
DATE AND TIME:
March 20, 2008, 10 a.m.
Room 2C, 888 First Street, NE.,
Washington, DC 20426.
PLACE:
STATUS:
Open.
Agenda.
Note—Items listed on the agenda may
be deleted without further notice.
MATTERS TO BE CONSIDERED:
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400. For a recorded message
listing items struck from or added to the
meeting, call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
website at https://www.ferc.gov using the
eLibrary link, or may be examined in
the Commission’s Public Reference
Room.
Regular Meeting
Docket No.
Company
ADMINISTRATIVE
A–1 ..................................................
A–2 ..................................................
A–3 ..................................................
AD02–1–000 ..................................
AD02–7–000 ..................................
AD06–3–000 ..................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
Energy Market Update.
ELECTRIC
E–1 ..................................................
E–2 ..................................................
OMITTED.
RM08–3–000 .................................
E–3 ..................................................
AD07–12–000 ................................
E–4 ..................................................
RR06–1–012 ..................................
mstockstill on PROD1PC66 with NOTICES
RR07–1–002 ..................................
RR07–2–002 ..................................
RR07–3–002 ..................................
RR07–4–002 ..................................
VerDate Aug<31>2005
16:44 Mar 19, 2008
Jkt 214001
PO 00000
Frm 00026
Fmt 4703
Mandatory Reliability Standard for Nuclear Plant Interface Coordination.
Reliability Standard Compliance and Enforcement in Regions with
Regional Transmission Organizations or Independent System Operators.
North American Electric Reliability Council, North American Electric
Reliability Corporation.
Delegation Agreement Between the North American Electric Reliability Corporation and Texas Regional Entity, a division of
ERCOT.
Delegation Agreement Between the North American Electric Reliability Corporation and Midwest Reliability Organization.
Delegation Agreement Between the North American Electric Reliability Corporation and Northeast Power Coordinating Council, Inc.
Delegation Agreement Between the North American Electric Reliability Corporation and ReliabilityFirst Corporation.
Sfmt 4703
E:\FR\FM\20MRN1.SGM
20MRN1
14982
Federal Register / Vol. 73, No. 55 / Thursday, March 20, 2008 / Notices
Item No.
Docket No.
Company
RR07–5–002 ..................................
Delegation Agreement Between the North American Electric Reliability Corporation and SERC Reliability Corporation.
Delegation Agreement Between the North American Electric Reliability Corporation and Southwest Power Pool, Inc.
Delegation Agreement Between the North American Electric Reliability Corporation and Western Electricity Coordinating Council.
Delegation Agreement Between the North American Electric Reliability Corporation and Florida Reliability Coordinating Council.
North American Electric Reliability Corporation and Western Electricity Coordinating Council.
State of California, ex rel. Bill Lockyer, Attorney General of the State
of California v. British Columbia Power Exchange Corporation,
Coral Power, LLC, Dynegy Power Marketing, Inc., Enron Power
Marketing, Inc., Mirant Americas Energy Marketing, LP, Reliant Energy Services, Inc., Williams Energy Marketing & Trading Company, All Other Public Utility Sellers of Energy and Ancillary Services to the California Energy Resources Scheduling Division of the
California Department of Water Resources, and All Other Public
Utility Sellers of Energy and Ancillary Services into Markets Operated by the California Power Exchange and California Independent
System Operator.
Bangor Hydro-Electric Company, Central Maine Power Company,
NSTAR Electric & Gas Corporation, New England Power Company, Northeast Utilities Service Company, The United Illuminating
Company, Vermont Electric Power Company, Central Vermont
Public Service Corp, Green Mountain Power Corporation.
Florida Power & Light Company—New England Division.
Midwest Independent Transmission System Operator, Inc.
PJM Interconnection, L.L.C.
Westar Energy, Inc.
RR07–6–002 ..................................
RR07–7–002 ..................................
RR07–8–002 ..................................
RR08–2–000 ..................................
E–5 ..................................................
EL02–71–004 ................................
E–6 ..................................................
ER04–157–014 ..............................
E–13 ................................................
E–14 ................................................
E–15 ................................................
ER04–714–006 ..............................
ER08–394–000 ..............................
ER06–1474–002, ER06–1474–004
EL08–31–000, ER08–396–000 .....
OMITTED.
ER03–583–007, ER03–681–005,
ER03–682–006.
ER03–744–005 ..............................
ER06–615–011, ER06–615–012,
ER07–1257–000.
ER05–1410–006, EL05–148–006
ES08–24–000 ................................
RM01–8–008 .................................
E–16 ................................................
E–17 ................................................
EL08–19–000 ................................
EL08–17–000 ................................
E–18 ................................................
E–19 ................................................
OMITTED.
EL07–95–000 ................................
E–20 ................................................
E–21 ................................................
OMITTED.
ER04–449–007, ER04–449–008,
ER04–449–016.
ER07–543–000 ..............................
ER06–278–000, ER06–278–001,
ER06–278–002,
ER06–278–
003, ER06–278–004, ER06–
278–005, ER06–278–006.
EL00–95–000,
EL00–95–045,
EL00–95–187.
E–7 ..................................................
E–8 ..................................................
E–9 ..................................................
E–10 ................................................
E–11 ................................................
E–12 ................................................
E–22 ................................................
E–23 ................................................
E–24 ................................................
mstockstill on PROD1PC66 with NOTICES
E–25 ................................................
E–26 ................................................
E–27 ................................................
E–28 ................................................
Entergy Services, Inc. and EWO Marketing, L.P., Entergy Services,
Inc. and Energy Power, Inc.
Entergy Services, Inc. and Entergy Louisiana, Inc.
California Independent System Operator Corporation.
PJM Interconnection, L.L.C.
Startrans IO, L.L.C.
Revised Public Utility Filing Requirements for Electric Quarterly Reports; Xcel Energy Services, Inc.
Public Service Electric and Gas Company.
Connecticut Municipal Electric Energy Cooperative and Richard
Blumenthal Attorney General for the State of Connecticut v. Milford
Power Company, LLC and ISO New England Inc.
Black Oak Energy, LLC v. New York Independent System Operator,
Inc.
New York Independent System Operator, Inc., New York Transmission Owners.
Linden VFT, LLC.
The Nevada Hydro Company, Inc.
San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services into Markets Operated by the California Independent
System Operator and the California Power Exchange.
Investigation of Practices of the California Independent System Operator Corporation and the California Power Exchange.
Norwalk Power, LLC.
EL00–98–000,
EL00–98–069,
EL00–98–172.
ER07–799–002, ER07–799–003,
EL07–61–001, EL07–61–002.
OMITTED.
ER07–539–003, ER07–539–004, Niagara Mohawk Power Corporation.
ER07–540–003, ER07–540–004.
AD08–2–000 .................................. Interconnection Queuing Practices.
RR07–16–001 ................................ North American Electric Reliability Corporation.
MISCELLANEOUS
M–1 .................................................
M–2 .................................................
VerDate Aug<31>2005
16:44 Mar 19, 2008
RM07–1–000 .................................
RM07–9–000 .................................
Jkt 214001
PO 00000
Frm 00027
Fmt 4703
Standards of Conduct for Transmission Providers.
Revisions to Forms, Statements, and Reporting Requirements for
Natural Gas Pipelines.
Sfmt 4703
E:\FR\FM\20MRN1.SGM
20MRN1
Federal Register / Vol. 73, No. 55 / Thursday, March 20, 2008 / Notices
Item No.
Docket No.
14983
Company
GAS
G–1 ..................................................
OR06–10–000 ...............................
G–2
G–3
G–4
G–5
G–6
G–7
G–8
G–9
OMITTED.
RP08–110–000 ..............................
RP08–127–000 ..............................
RP08–124–000 ..............................
OMITTED.
RP00–445–021 ..............................
RP04–42–000, RP04–42–002 .......
OMITTED.
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
..................................................
BP Pipelines (Alaska) Inc., ConocoPhillips Transportation Alaska,
Inc., ExxonMobil Pipeline Company, Koch Alaska Pipeline Company, Unocal Pipeline Company.
Columbia Gas Transmission Corporation.
Columbia Gas Transmission Corporation.
Columbia Gulf Transmission Company.
Alliance Pipeline L.P.
Southern Natural Gas Company.
HYDRO
H–1 ..................................................
H–2 ..................................................
H–3 ..................................................
DI07–1–001, P–2225–011 .............
P–12751–001 ................................
P–2524–015 ..................................
Public Utility District No. 1 of Pend Oreille County, Washington.
Finavera Renewables Ocean Energy, Ltd.
Grand River Dam Authority.
CERTIFICATES
C–1 ..................................................
C–2 ..................................................
C–3 ..................................................
C–4 ..................................................
CP06–54–000 ................................
CP06–55–000, CP06–56–000 .......
CP07–207–000, RP08–190–000 ...
OMITTED.
CP07–457–000 ..............................
Broadwater Energy LLC
Broadwater Pipeline LLC.
Colorado Interstate Gas Company.
Iroquois Gas Transmission System, L.P.
Kimberly D. Bose,
Secretary.
ENVIRONMENTAL PROTECTION
AGENCY
A free webcast of this event is
available through https://www.ferc.gov.
Anyone with Internet access who
desires to view this event can do so by
navigating to www.ferc.gov’s Calendar
of Events and locating this event in the
Calendar. The event will contain a link
to its webcast. The Capitol Connection
provides technical support for the free
webcasts. It also offers access to this
event via television in the DC area and
via phone bridge for a fee. If you have
any questions, visit https://
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
[EPA–HQ–OW–2006–0771, FRL–8544–7]
mstockstill on PROD1PC66 with NOTICES
[FR Doc. E8–5582 Filed 3–19–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:11 Mar 19, 2008
Jkt 214001
Agency Information Collection
Activities: Proposed Collection;
Extension of Comment Period;
Coalbed Methane Extraction Sector
Questionnaire (New), EPA ICR Number
2291.01
Environmental Protection
Agency (EPA).
ACTION: Extension of Comment Period.
AGENCY:
SUMMARY: In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), EPA announced on
January 25, 2008, its plan to submit a
proposed Information Collection
Request (ICR) to the Office of
Management and Budget (OMB) and
solicited public comments on this
request for a new collection on the
coalbed methane extraction industry
sector. In response to requests from
several stakeholders, this action extends
the public comment period for an
additional 30 days.
DATES: EPA must receive your
comments on or before April 24, 2008.
Submit your comments, data and
information for the Coalbed Methane
Extraction Sector Questionnaire,
Attention Docket ID No. EPA–HQ–OW–
2006–0771, by one of the following
methods:
(1) www.regulations.gov. Follow the
on-line instructions for submitting
comments.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
(2) E-mail: OW-Docket@epa.gov,
Attention Docket ID No. EPA–HQ–OW–
2006–0771.
(3) Mail: Water Docket, Environmental
Protection Agency, Mailcode: 4203M,
1200 Pennsylvania Ave., NW.,
Washington, DC 20460, Attention
Docket ID No. EPA–HQ–OW–2006–
0771. Please include a total of 3 copies.
(4) Hand Delivery: Water Docket, EPA
Docket Center, EPA West, Room 3334,
1301 Constitution Ave., NW.,
Washington, DC, Attention Docket ID
No. EPA–HQ–OW–2006–0771. Such
deliveries are only accepted during the
Docket’s normal hours of operation and
special arrangements should be made.
Instructions: Direct your comments to
Docket ID No. EPA–HQ–OW–2006–
0771. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information through
regulations.gov or e-mail that you
consider to be CBI or otherwise
protected. The federal regulations.gov
Web site is an ‘‘anonymous access’’
system, which means EPA will not
know your identity or contact
E:\FR\FM\20MRN1.SGM
20MRN1
Agencies
[Federal Register Volume 73, Number 55 (Thursday, March 20, 2008)]
[Notices]
[Pages 14981-14983]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5582]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting Notice
March 13, 2008.
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5
U.S.C. 552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date and Time: March 20, 2008, 10 a.m.
Place: Room 2C, 888 First Street, NE., Washington, DC 20426.
Status: Open.
Matters to be Considered: Agenda. Note--Items listed on the agenda may
be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400. For a recorded message listing items struck
from or added to the meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's website at https://www.ferc.gov using the eLibrary link, or
may be examined in the Commission's Public Reference Room.
931th--Meeting
Regular Meeting
March 20, 2008, 10 a.m.
------------------------------------------------------------------------
Item No. Docket No. Company
------------------------------------------------------------------------
ADMINISTRATIVE
------------------------------------------------------------------------
A-1........................... AD02-1-000....... Agency Administrative
Matters.
A-2........................... AD02-7-000....... Customer Matters,
Reliability,
Security and Market
Operations.
A-3........................... AD06-3-000....... Energy Market Update.
------------------------------------------------------------------------
ELECTRIC
------------------------------------------------------------------------
E-1........................... OMITTED..........
E-2........................... RM08-3-000....... Mandatory Reliability
Standard for Nuclear
Plant Interface
Coordination.
E-3........................... AD07-12-000...... Reliability Standard
Compliance and
Enforcement in
Regions with
Regional
Transmission
Organizations or
Independent System
Operators.
E-4........................... RR06-1-012....... North American
Electric Reliability
Council, North
American Electric
Reliability
Corporation.
RR07-1-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and
Texas Regional
Entity, a division
of ERCOT.
RR07-2-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and
Midwest Reliability
Organization.
RR07-3-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and
Northeast Power
Coordinating
Council, Inc.
RR07-4-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and
ReliabilityFirst
Corporation.
[[Page 14982]]
RR07-5-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and SERC
Reliability
Corporation.
RR07-6-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and
Southwest Power
Pool, Inc.
RR07-7-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and
Western Electricity
Coordinating
Council.
RR07-8-002....... Delegation Agreement
Between the North
American Electric
Reliability
Corporation and
Florida Reliability
Coordinating
Council.
RR08-2-000....... North American
Electric Reliability
Corporation and
Western Electricity
Coordinating
Council.
E-5........................... EL02-71-004...... State of California,
ex rel. Bill
Lockyer, Attorney
General of the State
of California v.
British Columbia
Power Exchange
Corporation, Coral
Power, LLC, Dynegy
Power Marketing,
Inc., Enron Power
Marketing, Inc.,
Mirant Americas
Energy Marketing,
LP, Reliant Energy
Services, Inc.,
Williams Energy
Marketing & Trading
Company, All Other
Public Utility
Sellers of Energy
and Ancillary
Services to the
California Energy
Resources Scheduling
Division of the
California
Department of Water
Resources, and All
Other Public Utility
Sellers of Energy
and Ancillary
Services into
Markets Operated by
the California Power
Exchange and
California
Independent System
Operator.
E-6........................... ER04-157-014..... Bangor Hydro-Electric
Company, Central
Maine Power Company,
NSTAR Electric & Gas
Corporation, New
England Power
Company, Northeast
Utilities Service
Company, The United
Illuminating
Company, Vermont
Electric Power
Company, Central
Vermont Public
Service Corp, Green
Mountain Power
Corporation.
ER04-714-006..... Florida Power & Light
Company--New England
Division.
E-7........................... ER08-394-000..... Midwest Independent
Transmission System
Operator, Inc.
E-8........................... ER06-1474-002, PJM Interconnection,
ER06-1474-004 L.L.C.
E-9........................... EL08-31-000, ER08- Westar Energy, Inc.
396-000.
E-10.......................... OMITTED..........
E-11.......................... ER03-583-007, Entergy Services,
ER03-681-005, Inc. and EWO
ER03-682-006. Marketing, L.P.,
Entergy Services,
Inc. and Energy
Power, Inc.
ER03-744-005..... Entergy Services,
Inc. and Entergy
Louisiana, Inc.
E-12.......................... ER06-615-011, California
ER06-615-012, Independent System
ER07-1257-000. Operator
Corporation.
E-13.......................... ER05-1410-006, PJM Interconnection,
EL05-148-006. L.L.C.
E-14.......................... ES08-24-000...... Startrans IO, L.L.C.
E-15.......................... RM01-8-008....... Revised Public
Utility Filing
Requirements for
Electric Quarterly
Reports; Xcel Energy
Services, Inc.
E-16.......................... EL08-19-000...... Public Service
Electric and Gas
Company.
E-17.......................... EL08-17-000...... Connecticut Municipal
Electric Energy
Cooperative and
Richard Blumenthal
Attorney General for
the State of
Connecticut v.
Milford Power
Company, LLC and ISO
New England Inc.
E-18.......................... OMITTED..........
E-19.......................... EL07-95-000...... Black Oak Energy, LLC
v. New York
Independent System
Operator, Inc.
E-20.......................... OMITTED..........
E-21.......................... ER04-449-007, New York Independent
ER04-449-008, System Operator,
ER04-449-016. Inc., New York
Transmission Owners.
ER07-543-000..... Linden VFT, LLC.
E-22.......................... ER06-278-000, The Nevada Hydro
ER06-278-001, Company, Inc.
ER06-278-002,
ER06-278-003,
ER06-278-004,
ER06-278-005,
ER06-278-006.
E-23.......................... EL00-95-000, EL00- San Diego Gas &
95-045, EL00-95- Electric Company v.
187. Sellers of Energy
and Ancillary
Services into
Markets Operated by
the California
Independent System
Operator and the
California Power
Exchange.
EL00-98-000, EL00- Investigation of
98-069, EL00-98- Practices of the
172. California
Independent System
Operator Corporation
and the California
Power Exchange.
E-24.......................... ER07-799-002, Norwalk Power, LLC.
ER07-799-003,
EL07-61-001,
EL07-61-002.
E-25.......................... OMITTED..........
E-26.......................... ER07-539-003, Niagara Mohawk Power
ER07-539-004, Corporation.
ER07-540-003,
ER07-540-004.
E-27.......................... AD08-2-000....... Interconnection
Queuing Practices.
E-28.......................... RR07-16-001...... North American
Electric Reliability
Corporation.
------------------------------------------------------------------------
MISCELLANEOUS
------------------------------------------------------------------------
M-1........................... RM07-1-000....... Standards of Conduct
for Transmission
Providers.
M-2........................... RM07-9-000....... Revisions to Forms,
Statements, and
Reporting
Requirements for
Natural Gas
Pipelines.
------------------------------------------------------------------------
[[Page 14983]]
GAS
------------------------------------------------------------------------
G-1........................... OR06-10-000...... BP Pipelines (Alaska)
Inc., ConocoPhillips
Transportation
Alaska, Inc.,
ExxonMobil Pipeline
Company, Koch Alaska
Pipeline Company,
Unocal Pipeline
Company.
G-2........................... OMITTED..........
G-3........................... RP08-110-000..... Columbia Gas
Transmission
Corporation.
G-4........................... RP08-127-000..... Columbia Gas
Transmission
Corporation.
G-5........................... RP08-124-000..... Columbia Gulf
Transmission
Company.
G-6........................... OMITTED..........
G-7........................... RP00-445-021..... Alliance Pipeline
L.P.
G-8........................... RP04-42-000, RP04- Southern Natural Gas
42-002. Company.
G-9........................... OMITTED..........
------------------------------------------------------------------------
HYDRO
------------------------------------------------------------------------
H-1........................... DI07-1-001, P- Public Utility
2225-011. District No. 1 of
Pend Oreille County,
Washington.
H-2........................... P-12751-001...... Finavera Renewables
Ocean Energy, Ltd.
H-3........................... P-2524-015....... Grand River Dam
Authority.
------------------------------------------------------------------------
CERTIFICATES
------------------------------------------------------------------------
C-1........................... CP06-54-000...... Broadwater Energy LLC
CP06-55-000, CP06- Broadwater Pipeline
56-000. LLC.
C-2........................... CP07-207-000, Colorado Interstate
RP08-190-000. Gas Company.
C-3........................... OMITTED..........
C-4........................... CP07-457-000..... Iroquois Gas
Transmission System,
L.P.
------------------------------------------------------------------------
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through https://
www.ferc.gov. Anyone with Internet access who desires to view this
event can do so by navigating to www.ferc.gov's Calendar of Events and
locating this event in the Calendar. The event will contain a link to
its webcast. The Capitol Connection provides technical support for the
free webcasts. It also offers access to this event via television in
the DC area and via phone bridge for a fee. If you have any questions,
visit https://www.CapitolConnection.org or contact Danelle Springer or
David Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. E8-5582 Filed 3-19-08; 8:45 am]
BILLING CODE 6717-01-P