Seabrook Station, Unit No. 1; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards; Consideration Determination and Opportunity for a Hearing, 14850-14852 [E8-5521]
Download as PDF
14850
Federal Register / Vol. 73, No. 54 / Wednesday, March 19, 2008 / Notices
reading-rm/adams.html. The accession
number for the application is
ML080640433. Future publicly available
documents related to the application
will also be posted in ADAMS. Persons
who do not have access to ADAMS, or
who encounter problems in accessing
the documents located in ADAMS,
should contact the NRC Public
Document Room staff by telephone at 1–
800–397–4209 or 301–415–4737, or by
e-mail to pdr@nrc.gov. The application
is also available at https://www.nrc.gov/
reactors/new-licensing/col.html.
operation of the facility in accordance
with the proposed amendment would
not: (1) Involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
Dated at Rockville, Maryland, this 10th day
of March, 2008.
For the Nuclear Regulatory Commission.
Eric R. Oesterle,
Senior Project Manager, ESBWR/ABWR
Projects Branch 1, Division of New Reactor
Licensing, Office of New Reactors.
[FR Doc. E8–5522 Filed 3–18–08; 8:45 am]
1. Does the proposed amendment involve
a significant increase in the probability or
consequences of an accident previously
evaluated?
The probability or consequences of
accidents previously evaluated in the
[Updated Final Safety Analysis Report] are
unaffected by this proposed change. The
duration for obtaining neutron detector
plateau curves is not an initiator of any
accident previously analyzed. There is no
change to any equipment response or
accident scenario, and this change results in
no additional challenges to fission product
barrier integrity. The proposed change does
not alter the design, configuration, operation,
or function of any plant system, structure, or
component.
The requested amendment modifies the
frequency of the channel calibrations for the
intermediate and power range detectors by
permitting 24 hours to perform the SR
[surveillance requirement] (measure and
obtain neutron detector plateau curves) after
achieving steady-state operation at rated
thermal power. This change has no impact on
the consequences or probability of any
accident previously evaluated. The proposed
change does not impact the ability of the
nuclear instrumentation, reactor protection
system, or any other system, structure, or
component to perform its intended function
to mitigate the consequences of an accident
within acceptable limits. The proposed
change does not affect the source term,
containment isolation, or radiological
assumptions used in analyzing the
consequences of accidents previously
evaluated. Further, the proposed change
neither increases the type or amount of
radioactivity released offsite nor increases
public or occupational radiation exposures.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed amendment create
the possibility of a new or different kind of
accident from any accident previously
evaluated?
No new accident scenarios, failure
mechanisms, or limiting single failures are
introduced as a result of the proposed
change. The proposed change does not
challenge the performance or integrity of any
safety-related system. The proposed change
neither installs nor removes any plant
equipment, and it does not alter the design,
physical configuration, or operation of any
plant structure, system, or component. No
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–443]
jlentini on PROD1PC65 with NOTICES
Seabrook Station, Unit No. 1; Notice of
Consideration of Issuance of
Amendment to Facility Operating
License, Proposed No Significant
Hazards; Consideration Determination
and Opportunity for a Hearing
The U.S. Nuclear Regulatory
Commission (the Commission or NRC)
is considering issuance of an
amendment to Facility Operating
License No. NPF–86 issued to FPL
Energy Seabrook, LLC (the licensee) for
operation of Seabrook Station, Unit No.
1, located in Rockingham County, New
Hampshire.
The proposed amendment would
revise Technical Specification (TS)
Table 4.3–1, ‘‘Reactor Trip System
Instrumentation Surveillance
Requirements’’ to require the initial
plateau curves to be measured within 24
hours after attaining 100 percent steadystate power. Currently, initial plateau
curves are required to be taken within
24 hours of entry into Mode 2.
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment request involves no
significant hazards consideration. Under
the Commission’s regulations in Title 10
of the Code of Federal Regulations (10
CFR), Section 50.92, this means that
VerDate Aug<31>2005
16:50 Mar 18, 2008
Jkt 214001
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
physical changes are being made to the plant,
so no new accident causal mechanisms are
being introduced. Therefore, the proposed
change does not create the possibility of a
new or different kind of accident from any
previously evaluated.
3. Does the proposed amendment involve
a significant reduction in a margin of safety?
The margin of safety associated with the
acceptance criteria of any accident is
unchanged. The proposed change will have
no affect on the operability or performance of
the safety-related systems and components.
The proposed change does not alter the
design, configuration, operation, or function
of any plant system, structure, or component.
The ability of any operable structure, system,
or component to perform its designated
safety function is unaffected by this change.
With this change, the TS will continue to
require operable nuclear instrumentation.
The proposed change does not create an
initiating event, increase the likelihood of an
initiating event, affect the ability to mitigate
an event, affect containment performance, or
affect operator actions in response to an
event. Therefore, the margin of safety as
defined in the TS is not reduced and the
proposed change does not involve a
significant reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
E:\FR\FM\19MRN1.SGM
19MRN1
jlentini on PROD1PC65 with NOTICES
Federal Register / Vol. 73, No. 54 / Wednesday, March 19, 2008 / Notices
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division
of Administrative Services, Office of
Administration, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, and should cite the publication
date and page number of this Federal
Register notice. Written comments may
also be delivered to Room 6D59, Two
White Flint North, 11545 Rockville
Pike, Rockville, Maryland, from 7:30
a.m. to 4:15 p.m. Federal workdays.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
White Flint North, Public File Area
O1F21, 11555 Rockville Pike (first
floor), Rockville, Maryland.
The filing of requests for hearing and
petitions for leave to intervene is
discussed below.
Within 60 days after the date of
publication of this notice, the person(s)
may file a request for a hearing with
respect to issuance of the amendment to
the subject facility operating license,
and any person(s) whose interest may be
affected by this proceeding and who
wishes to participate as a party in the
proceeding must file a written request
via electronic submission through the
NRC E-filing system for a hearing and a
petition for leave to intervene. Requests
for a hearing and a petition for leave to
intervene shall be filed in accordance
with the Commission’s ‘‘Rules of
Practice for Domestic Licensing
Proceedings’’ in 10 CFR Part 2.
Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Public
File Area O1F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed by the above
date, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
VerDate Aug<31>2005
16:50 Mar 18, 2008
Jkt 214001
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted,
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner/requestor must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
petitioner/requestor who fails to satisfy
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
14851
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
Non-timely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission or the presiding officer of
the Atomic Safety and Licensing Board
that the petition, request and/or the
contentions should be granted based on
a balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii).
A request for hearing or a petition for
leave to intervene must be filed in
accordance with the NRC E-Filing rule,
which the NRC promulgated on August
28, 2007 (72 FR 49139). The E-Filing
process requires participants to submit
and serve documents over the internet
or in some cases to mail copies on
electronic storage media. Participants
may not submit paper copies of their
filings unless they seek a waiver in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least five (5)
days prior to the filing deadline, the
petitioner/requestor must contact the
Office of the Secretary by e-mail at
hearingdocket@nrc.gov, or by calling
(301) 415–1677, to request: (1) A digital
ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and/or (2) creation of an
electronic docket for the proceeding
(even in instances in which the
petitioner/requestor (or its counsel or
representative) already holds an NRCissued digital ID certificate). Each
petitioner/requestor will need to
download the Workplace Forms
ViewerTM to access the Electronic
Information Exchange (EIE), a
component of the E-Filing system. The
Workplace Forms ViewerTM is free and
is available at https://www.nrc.gov/sitehelp/e-submittals/install-viewer.html.
Information about applying for a digital
ID certificate is available on NRC’s
public Web site at https://www.nrc.gov/
site-help/e-submittals/applycertificates.html.
Once a petitioner/requestor has
obtained a digital ID certificate, had a
docket created, and downloaded the EIE
viewer, it can then submit a request for
hearing or petition for leave to
intervene. Submissions should be in
Portable Document Format (PDF) in
accordance with NRC guidance
available on the NRC public Web site at
E:\FR\FM\19MRN1.SGM
19MRN1
jlentini on PROD1PC65 with NOTICES
14852
Federal Register / Vol. 73, No. 54 / Wednesday, March 19, 2008 / Notices
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the filer submits its
documents through EIE. To be timely,
an electronic filing must be submitted to
the EIE system no later than 11:59 p.m.
Eastern Time on the due date. Upon
receipt of a transmission, the E-Filing
system time-stamps the document and
sends the submitter an e-mail notice
confirming receipt of the document. The
EIE system also distributes an e-mail
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically may
seek assistance through the ‘‘Contact
Us’’ link located on the NRC Web site
at https://www.nrc.gov/site-help/esubmittals.html or by calling the NRC
technical help line, which is available
between 8:30 a.m. and 4:15 p.m.,
Eastern Time, Monday through Friday.
The help line number is (800) 397–4209
or locally, (301) 415–4737. Participants
who believe that they have a good cause
for not submitting documents
electronically must file a motion, in
accordance with 10 CFR 2.302(g), with
their initial paper filing requesting
authorization to continue to submit
documents in paper format. Such filings
must be submitted by: (1) First class
mail addressed to the Office of the
Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, Sixteenth Floor, One White
Flint North, 11555 Rockville Pike,
Rockville, Maryland 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service.
Non-timely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission, the presiding officer, or
VerDate Aug<31>2005
16:50 Mar 18, 2008
Jkt 214001
the Atomic Safety and Licensing Board
that the petition and/or request should
be granted and/or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)–(viii). To be timely,
filings must be submitted no later than
11:59 p.m. Eastern Time on the due
date.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
www.nrc.gov/about-nrc/regulatory/
adjudicatory.html, unless excluded
pursuant to an order of the Commission,
an Atomic Safety and Licensing Board,
or a Presiding Officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings.
With respect to copyrighted works,
except for limited excerpts that serve
the purpose of the adjudicatory filings
and would constitute a Fair Use
application, Participants are requested
not to include copyrighted materials in
their submissions.
For further details with respect to this
license amendment application, see the
application for amendment dated
February 16, 2007, which is available
for public inspection at the
Commission’s PDR, located at One
White Flint North, File Public Area
O1F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible from
the Agencywide Documents Access and
Management System’s (ADAMS) Public
Electronic Reading Room on the Internet
at the NRC Web site, https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209, 301–415–4737, or by e-mail
to pdr@nrc.gov.
Dated at Rockville, Maryland, this 12th day
of March, 2008.
For the Nuclear Regulatory Commission.
G. Edward Miller,
Project Manager, Plant Licensing Branch
1–2, Division of Operating Reactor Licensing,
Office of Nuclear Reactor Regulation.
[FR Doc. E8–5521 Filed 3–18–08; 8:45 am]
BILLING CODE 7590–01–P
PO 00000
Frm 00084
Fmt 4703
Sfmt 4703
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
Subcommittee on Economic Simplified
Boiling Water Reactor (ESBWR);
Notice of Meeting
The ACRS Subcommittee on ESBWR
will hold a meeting on April 9, 2008, in
the Commissioners’ Conference Room,
11555 Rockville Pike, Rockville,
Maryland.
The entire meeting will be open to
public attendance, with the exception of
a portion that may be closed to discuss
General Electric—Hitachi Nuclear
Energy Americas, LLC. (GEH)
proprietary information pursuant to 5
U.S.C. 552b(c)(4).
The agenda for the subject meeting
shall be as follows:
Wednesday, April 9, 2008—8:30 a.m.
until 5 p.m.
The Subcommittee will discuss the
staff’s approach to resolve the thermalhydraulic issues previously identified
by the Subcommittee during its review
of Chapters 4, 6, 15, and 21 of the Safety
Evaluation Report (SER) with open
items associated with the ESBWR
design certification application. In
addition, the Subcommittee will review
SER Chapter 18, ‘‘Human Factors
Engineering.’’ The Subcommittee will
hear presentations by and hold
discussions with representatives of the
NRC staff and other interested persons
regarding this matter. The
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official, Mr. David Bessette
(telephone 301/415–8065) five days
prior to the meeting, if possible, so that
appropriate arrangements can be made.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
on September 26, 2007 (72 FR 54695).
Further information regarding this
meeting can be obtained by contacting
the Designated Federal Official between
7:45 a.m. and 4:30 p.m. (ET). Persons
planning to attend this meeting are
urged to contact the above named
individual at least two working days
prior to the meeting to be advised of any
potential changes to the agenda.
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 73, Number 54 (Wednesday, March 19, 2008)]
[Notices]
[Pages 14850-14852]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5521]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-443]
Seabrook Station, Unit No. 1; Notice of Consideration of Issuance
of Amendment to Facility Operating License, Proposed No Significant
Hazards; Consideration Determination and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission or NRC) is
considering issuance of an amendment to Facility Operating License No.
NPF-86 issued to FPL Energy Seabrook, LLC (the licensee) for operation
of Seabrook Station, Unit No. 1, located in Rockingham County, New
Hampshire.
The proposed amendment would revise Technical Specification (TS)
Table 4.3-1, ``Reactor Trip System Instrumentation Surveillance
Requirements'' to require the initial plateau curves to be measured
within 24 hours after attaining 100 percent steady-state power.
Currently, initial plateau curves are required to be taken within 24
hours of entry into Mode 2.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), Section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not: (1) Involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed amendment involve a significant increase in
the probability or consequences of an accident previously evaluated?
The probability or consequences of accidents previously
evaluated in the [Updated Final Safety Analysis Report] are
unaffected by this proposed change. The duration for obtaining
neutron detector plateau curves is not an initiator of any accident
previously analyzed. There is no change to any equipment response or
accident scenario, and this change results in no additional
challenges to fission product barrier integrity. The proposed change
does not alter the design, configuration, operation, or function of
any plant system, structure, or component.
The requested amendment modifies the frequency of the channel
calibrations for the intermediate and power range detectors by
permitting 24 hours to perform the SR [surveillance requirement]
(measure and obtain neutron detector plateau curves) after achieving
steady-state operation at rated thermal power. This change has no
impact on the consequences or probability of any accident previously
evaluated. The proposed change does not impact the ability of the
nuclear instrumentation, reactor protection system, or any other
system, structure, or component to perform its intended function to
mitigate the consequences of an accident within acceptable limits.
The proposed change does not affect the source term, containment
isolation, or radiological assumptions used in analyzing the
consequences of accidents previously evaluated. Further, the
proposed change neither increases the type or amount of
radioactivity released offsite nor increases public or occupational
radiation exposures. Therefore, the proposed change does not involve
a significant increase in the probability or consequences of an
accident previously evaluated.
2. Does the proposed amendment create the possibility of a new
or different kind of accident from any accident previously
evaluated?
No new accident scenarios, failure mechanisms, or limiting
single failures are introduced as a result of the proposed change.
The proposed change does not challenge the performance or integrity
of any safety-related system. The proposed change neither installs
nor removes any plant equipment, and it does not alter the design,
physical configuration, or operation of any plant structure, system,
or component. No physical changes are being made to the plant, so no
new accident causal mechanisms are being introduced. Therefore, the
proposed change does not create the possibility of a new or
different kind of accident from any previously evaluated.
3. Does the proposed amendment involve a significant reduction
in a margin of safety?
The margin of safety associated with the acceptance criteria of
any accident is unchanged. The proposed change will have no affect
on the operability or performance of the safety-related systems and
components. The proposed change does not alter the design,
configuration, operation, or function of any plant system,
structure, or component. The ability of any operable structure,
system, or component to perform its designated safety function is
unaffected by this change. With this change, the TS will continue to
require operable nuclear instrumentation. The proposed change does
not create an initiating event, increase the likelihood of an
initiating event, affect the ability to mitigate an event, affect
containment performance, or affect operator actions in response to
an event. Therefore, the margin of safety as defined in the TS is
not reduced and the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that
[[Page 14851]]
the need to take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking,
Directives and Editing Branch, Division of Administrative Services,
Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike,
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays.
Documents may be examined, and/or copied for a fee, at the NRC's Public
Document Room (PDR), located at One White Flint North, Public File Area
O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
The filing of requests for hearing and petitions for leave to
intervene is discussed below.
Within 60 days after the date of publication of this notice, the
person(s) may file a request for a hearing with respect to issuance of
the amendment to the subject facility operating license, and any
person(s) whose interest may be affected by this proceeding and who
wishes to participate as a party in the proceeding must file a written
request via electronic submission through the NRC E-filing system for a
hearing and a petition for leave to intervene. Requests for a hearing
and a petition for leave to intervene shall be filed in accordance with
the Commission's ``Rules of Practice for Domestic Licensing
Proceedings'' in 10 CFR Part 2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is available at the Commission's
PDR, located at One White Flint North, Public File Area O1F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/doc-
collections/cfr/. If a request for a hearing or petition for leave to
intervene is filed by the above date, the Commission or a presiding
officer designated by the Commission or by the Chief Administrative
Judge of the Atomic Safety and Licensing Board Panel, will rule on the
request and/or petition; and the Secretary or the Chief Administrative
Judge of the Atomic Safety and Licensing Board will issue a notice of a
hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted, with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A petitioner/requestor
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission or the presiding
officer of the Atomic Safety and Licensing Board that the petition,
request and/or the contentions should be granted based on a balancing
of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii).
A request for hearing or a petition for leave to intervene must be
filed in accordance with the NRC E-Filing rule, which the NRC
promulgated on August 28, 2007 (72 FR 49139). The E-Filing process
requires participants to submit and serve documents over the internet
or in some cases to mail copies on electronic storage media.
Participants may not submit paper copies of their filings unless they
seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
five (5) days prior to the filing deadline, the petitioner/requestor
must contact the Office of the Secretary by e-mail at
hearingdocket@nrc.gov, or by calling (301) 415-1677, to request: (1) A
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms ViewerTM
to access the Electronic Information Exchange (EIE), a component of the
E-Filing system. The Workplace Forms ViewerTM is free and is
available at https://www.nrc.gov/site-help/e-submittals/install-
viewer.html. Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-
submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at
[[Page 14852]]
https://www.nrc.gov/site-help/e-submittals.html. A filing is considered
complete at the time the filer submits its documents through EIE. To be
timely, an electronic filing must be submitted to the EIE system no
later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically may seek assistance through the
``Contact Us'' link located on the NRC Web site at https://www.nrc.gov/
site-help/e-submittals.html or by calling the NRC technical help line,
which is available between 8:30 a.m. and 4:15 p.m., Eastern Time,
Monday through Friday. The help line number is (800) 397-4209 or
locally, (301) 415-4737. Participants who believe that they have a good
cause for not submitting documents electronically must file a motion,
in accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the petition
and/or request should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later
than 11:59 p.m. Eastern Time on the due date.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://www.nrc.gov/about-nrc/regulatory/adjudicatory.html, unless
excluded pursuant to an order of the Commission, an Atomic Safety and
Licensing Board, or a Presiding Officer. Participants are requested not
to include personal privacy information, such as social security
numbers, home addresses, or home phone numbers in their filings. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, Participants are requested not to include copyrighted
materials in their submissions.
For further details with respect to this license amendment
application, see the application for amendment dated February 16, 2007,
which is available for public inspection at the Commission's PDR,
located at One White Flint North, File Public Area O1F21, 11555
Rockville Pike (first floor), Rockville, Maryland. Publicly available
records will be accessible from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 12th day of March, 2008.
For the Nuclear Regulatory Commission.
G. Edward Miller,
Project Manager, Plant Licensing Branch 1-2, Division of Operating
Reactor Licensing, Office of Nuclear Reactor Regulation.
[FR Doc. E8-5521 Filed 3-18-08; 8:45 am]
BILLING CODE 7590-01-P