Advisory Committee on Reactor Safeguards (ACRS); Meeting of the Subcommittee on Economic Simplified Boiling Water Reactor (ESBWR); Notice of Meeting, 14852-14853 [E8-5515]

Download as PDF jlentini on PROD1PC65 with NOTICES 14852 Federal Register / Vol. 73, No. 54 / Wednesday, March 19, 2008 / Notices https://www.nrc.gov/site-help/esubmittals.html. A filing is considered complete at the time the filer submits its documents through EIE. To be timely, an electronic filing must be submitted to the EIE system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The EIE system also distributes an e-mail notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/ petition to intervene is filed so that they can obtain access to the document via the E-Filing system. A person filing electronically may seek assistance through the ‘‘Contact Us’’ link located on the NRC Web site at https://www.nrc.gov/site-help/esubmittals.html or by calling the NRC technical help line, which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is (800) 397–4209 or locally, (301) 415–4737. Participants who believe that they have a good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) First class mail addressed to the Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001, Attention: Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants. Filing is considered complete by firstclass mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service. Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or VerDate Aug<31>2005 16:50 Mar 18, 2008 Jkt 214001 the Atomic Safety and Licensing Board that the petition and/or request should be granted and/or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)–(viii). To be timely, filings must be submitted no later than 11:59 p.m. Eastern Time on the due date. Documents submitted in adjudicatory proceedings will appear in NRC’s electronic hearing docket which is available to the public at https:// www.nrc.gov/about-nrc/regulatory/ adjudicatory.html, unless excluded pursuant to an order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, Participants are requested not to include copyrighted materials in their submissions. For further details with respect to this license amendment application, see the application for amendment dated February 16, 2007, which is available for public inspection at the Commission’s PDR, located at One White Flint North, File Public Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible from the Agencywide Documents Access and Management System’s (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, https:// www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1–800– 397–4209, 301–415–4737, or by e-mail to pdr@nrc.gov. Dated at Rockville, Maryland, this 12th day of March, 2008. For the Nuclear Regulatory Commission. G. Edward Miller, Project Manager, Plant Licensing Branch 1–2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. E8–5521 Filed 3–18–08; 8:45 am] BILLING CODE 7590–01–P PO 00000 Frm 00084 Fmt 4703 Sfmt 4703 NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the Subcommittee on Economic Simplified Boiling Water Reactor (ESBWR); Notice of Meeting The ACRS Subcommittee on ESBWR will hold a meeting on April 9, 2008, in the Commissioners’ Conference Room, 11555 Rockville Pike, Rockville, Maryland. The entire meeting will be open to public attendance, with the exception of a portion that may be closed to discuss General Electric—Hitachi Nuclear Energy Americas, LLC. (GEH) proprietary information pursuant to 5 U.S.C. 552b(c)(4). The agenda for the subject meeting shall be as follows: Wednesday, April 9, 2008—8:30 a.m. until 5 p.m. The Subcommittee will discuss the staff’s approach to resolve the thermalhydraulic issues previously identified by the Subcommittee during its review of Chapters 4, 6, 15, and 21 of the Safety Evaluation Report (SER) with open items associated with the ESBWR design certification application. In addition, the Subcommittee will review SER Chapter 18, ‘‘Human Factors Engineering.’’ The Subcommittee will hear presentations by and hold discussions with representatives of the NRC staff and other interested persons regarding this matter. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official, Mr. David Bessette (telephone 301/415–8065) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on September 26, 2007 (72 FR 54695). Further information regarding this meeting can be obtained by contacting the Designated Federal Official between 7:45 a.m. and 4:30 p.m. (ET). Persons planning to attend this meeting are urged to contact the above named individual at least two working days prior to the meeting to be advised of any potential changes to the agenda. E:\FR\FM\19MRN1.SGM 19MRN1 Federal Register / Vol. 73, No. 54 / Wednesday, March 19, 2008 / Notices Dated: March 12, 2008. Cayetano Santos, Branch Chief, ACRS. [FR Doc. E8–5515 Filed 3–18–08; 8:45 am] Dated: March 12, 2008. Cayetano Santos, Chief, Reactor Safety Branch. [FR Doc. E8–5516 Filed 3–18–08; 8:45 am] BILLING CODE 7590–01–P BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION NUCLEAR REGULATORY COMMISSION jlentini on PROD1PC65 with NOTICES Advisory Committee on Reactor Safeguards (ACRS); Subcommittee Meeting on Planning and Procedures; Notice of Meeting The ACRS Subcommittee on Planning and Procedures will hold a meeting on April 9, 2008, Room T–2B1, 11545 Rockville Pike, Rockville, Maryland. The entire meeting will be open to public attendance, with the exception of a portion that may be closed pursuant to 5 U.S.C. 552b ( c) (2) and (6) to discuss organizational and personnel matters that relate solely to the internal personnel rules and practices of the ACRS, and information the release of which would constitute a clearly unwarranted invasion of personal privacy. The agenda for the subject meeting shall be as follows: Wednesday, April 9, 2008, 12 p.m. until 1 p.m. The Subcommittee will discuss proposed ACRS activities and related matters. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Officer, Mr. Sam Duraiswamy (telephone: 301–415–7364) between 7:30 a.m. and 4 p.m. (ET) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on September 26, 2007 (72 FR 54695). Further information regarding this meeting can be obtained by contacting the Designated Federal Officer between 7:30 a.m. and 4 p.m. (ET). Persons planning to attend this meeting are urged to contact the above named individual at least two working days prior to the meeting to be advised of any potential changes in the agenda. VerDate Aug<31>2005 16:50 Mar 18, 2008 Jkt 214001 [Docket No. 50–395] South Carolina Electric & Gas Company; Virgil C. Summer Nuclear Station, Unit No. 1; Exemption 1.0 Background The South Carolina Electric & Gas Company (SCE&G, the licensee) is the holder of the Renewed Facility Operating License No. NPF–12 which authorizes operation of the Virgil C. Summer Nuclear Station, Unit No. 1 (VCSNS). The license provides, among other things, that the facility is subject to all rules, regulations, and orders of the Nuclear Regulatory Commission (NRC or the Commission) now or hereafter in effect. The facility consists of a pressurizedwater reactor located in Fairfield County in South Carolina. 2.0 Request/Action Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.12, ‘‘Specific Exemptions,’’ SCE&G has, by letters dated May 31 and October 11, 2007, requested an exemption from 10 CFR 50.46, ‘‘Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors,’’ and Appendix K to 10 CFR 50, ‘‘ECCS Evaluation Models,’’ (Appendix K). The regulation in 10 CFR 50.46 contains acceptance criteria for emergency core cooling system (ECCS) for reactors fueled with zircaloy or ZIRLOTM cladding. In addition, Appendix K requires that the Baker-Just equation be used to predict the rates of energy release, hydrogen concentration, and cladding oxidation from the metal-water reaction. The exemption request relates solely to the specific types of cladding material specified in these regulations. As written, the regulations presume the use of zircaloy or ZIRLOTM fuel rod cladding. Thus, an exemption from the requirements of 10 CFR 50.46, and Appendix K is needed to irradiate a lead test assembly (LTA) comprised of different cladding alloys at VCSNS. The exemptions requested by the licensee would allow the use of one LTA containing either all Optimized ZIRLOTM fuel rod cladding or a combination of Optimized ZIRLOTM and PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 14853 AXIOMTM fuel rod cladding to continue to be irradiated up to a burnup of 75 gigawatt days per metric ton uranium (GWd/MTU). Previously, by letter dated January 14, 2005, the NRC staff approved the irradiation of four LTAs containing fuel rods with Optimized ZIRLOTM and several different developmental clad (AXIOMTM) alloys. That exemption was contingent on the fuel rod burnup remaining within the applicable licensed limits, which for burnup, was a value of 62 GWd/MTU. The licensee inserted those LTAs into VCSNS for irradiation in fuel cycles 16 and 17. In the licensee’s letters of May 31 and October 11, 2007, the licensee requested an exemption to continue the irradiation of one of the four LTAs for a third operating cycle. This LTA would be irradiated in fuel cycle 18 in order to gain high burnup experience. The licensee requested to irradiate the LTA to a peak rod average of up to 75 GWd/ MTU. The licensee also requested an exemption from 10 CFR 50.44, ‘‘Combustible gas control for nuclear power reactors.’’ The requested exemption from 10 CFR 50.44 is not being considered further by the NRC staff because revisions were made to 10 CFR 50.44 (68 FR 54123; September 16, 2003), such that it does not refer to specific types of zirconium cladding, thus removing the need for such an exemption. 3.0 Discussion Pursuant to 10 CFR 50.12, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 50, when (1) the exemptions are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security; and (2) when special circumstances are present. Under Section 50.12(a)(2) of 10 CFR, special circumstances include, among other things, when application of the specific regulation in the particular circumstance would not serve, or is not necessary to achieve, the underlying purpose of the rule. Authorized by Law This exemption would allow the licensee to re-insert one LTA containing either all Optimized ZIRLOTM fuel rod cladding or a combination of Optimized ZIRLOTM and AXIOMTM fuel rod cladding that does not meet the definition of Zircaloy or ZIRLOTM as specified by 10 CFR 50.46, and Appendix K, into the core of VCSNS E:\FR\FM\19MRN1.SGM 19MRN1

Agencies

[Federal Register Volume 73, Number 54 (Wednesday, March 19, 2008)]
[Notices]
[Pages 14852-14853]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5515]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards (ACRS); Meeting of the 
Subcommittee on Economic Simplified Boiling Water Reactor (ESBWR); 
Notice of Meeting

    The ACRS Subcommittee on ESBWR will hold a meeting on April 9, 
2008, in the Commissioners' Conference Room, 11555 Rockville Pike, 
Rockville, Maryland.
    The entire meeting will be open to public attendance, with the 
exception of a portion that may be closed to discuss General Electric--
Hitachi Nuclear Energy Americas, LLC. (GEH) proprietary information 
pursuant to 5 U.S.C. 552b(c)(4).
    The agenda for the subject meeting shall be as follows:
    Wednesday, April 9, 2008--8:30 a.m. until 5 p.m.
    The Subcommittee will discuss the staff's approach to resolve the 
thermal-hydraulic issues previously identified by the Subcommittee 
during its review of Chapters 4, 6, 15, and 21 of the Safety Evaluation 
Report (SER) with open items associated with the ESBWR design 
certification application. In addition, the Subcommittee will review 
SER Chapter 18, ``Human Factors Engineering.'' The Subcommittee will 
hear presentations by and hold discussions with representatives of the 
NRC staff and other interested persons regarding this matter. The 
Subcommittee will gather information, analyze relevant issues and 
facts, and formulate proposed positions and actions, as appropriate, 
for deliberation by the full Committee.
    Members of the public desiring to provide oral statements and/or 
written comments should notify the Designated Federal Official, Mr. 
David Bessette (telephone 301/415-8065) five days prior to the meeting, 
if possible, so that appropriate arrangements can be made. Electronic 
recordings will be permitted only during those portions of the meeting 
that are open to the public. Detailed procedures for the conduct of and 
participation in ACRS meetings were published in the Federal Register 
on September 26, 2007 (72 FR 54695).
    Further information regarding this meeting can be obtained by 
contacting the Designated Federal Official between 7:45 a.m. and 4:30 
p.m. (ET). Persons planning to attend this meeting are urged to contact 
the above named individual at least two working days prior to the 
meeting to be advised of any potential changes to the agenda.


[[Page 14853]]


    Dated: March 12, 2008.
Cayetano Santos,
Branch Chief, ACRS.
[FR Doc. E8-5515 Filed 3-18-08; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.