Environmental Impacts Statements; Notice of Availability, 13895 [E8-5184]

Download as PDF Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices Summary: No formal comment letter was sent to the preparing agency. EIS No. 20080030, ERP No. F–BLM– J65455–MT, Upper Missouri River Breaks National Monument Resource Management Plan, Implementation, Blaine, Chouteau, Fergus and Phillips Counties, MT. Summary: EPA continues to have environmental concerns about impacts to water quality and aquatic resources from road density, cumulative effects and the adequacy of resources available for monitoring and adaptive management and for travel management enforcement. Dated: March 11, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–5183 Filed 3–13–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6696–8] rwilkins on PROD1PC63 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/ Weekly Receipt of Environmental Impact Statements Filed 03/03/2008 Through 03/07/2008 Pursuant to 40 CFR 1506.9. EIS No. 20080080, Second Draft Supplement, COE, CA, Santa Ana River Interceptor (SARI) Protection/ Relocation Project, Reduce the Risk of Damage to the SARI to allow for the Operation of Santa Ana River Project (SARP), and Releases from Prado Dam of up to 30,000 cubic feet per second (cfs), Right-of-Way Permit and U.S. COE Section 404 Permit, Orange and Riverside Counties, CA, Comment Period Ends: 04/28/2008, Contact: Raina Fulton 213–452–3872. EIS No. 20080081, Final EIS, FHW, CA, Interstate 405 (San Diego Freeway) Sepulveda Pass Widening Project, Widening and High Occupancy Vehicle (HOV) Improvements from Interstate 10 to U.S.–101 in the City of Los Angeles, Preferred Alternative is 2, Los Angeles County, CA, Wait Period Ends: 04/14/2008, Contact: Cesar Perez 916–498–5065. EIS No. 20080082, Final EIS, AFS, ID, Cherry Dinner Project, Management of Vegetation, Hazardous Fuels, and Access Plus Watershed Improvements, Amendment to the VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 Forest Plan, Palouse Ranger District, Clearwater National Forest, Latah County, ID, Wait Period Ends: 04/14/ 2008, Contact: Kara Chadwick 208– 875–1131. EIS No. 20080083, Draft Supplement, AFS, WV, Lower Williams Project Area (LWPA), Additional Information, Proposed to Perform Vegetation Management and Wildlife Habitat Improvements, Implementation, Gauley Ranger District, Monongahela National Forest, Webster County, WV, Comment Period Ends: 04/28/2008, Contact: O’Dell Tucker 304–799–4334 Ext 19. EIS No. 20080084, Draft Supplement, AFS, UT, West Bear Vegetation Management Project, Additional Information to Improve a Portion of the Cumulative Effects Analysis and Correct the Soils Analysis, Timber Harvesting, Prescribed Burning, Roads Construction, Township 1 North, Range 9 East, Salt Lake Principle Meridian, Evanston Ranger District, Wasatch-Cache National Forest, Summit County, UT, Comment Period Ends: 04/28/2008, Contact: Larry Johnson 307–783–3194. EIS No. 20080085, Final EIS, NPS, WA, Olympic National Park General Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA, Wait Period Ends: 04/14/2008, Contact: Nancy Hendricks 360–565–3008. EIS No. 20080086, Draft Supplement, FTA, NJ, Access to the Region’s Core Project, Additional Information on the Build Alternative, To Increase TransHudson Commuter Rail Capacity, Improve System Safety and Reliability between Secaucus Junction Station in NJ and midtown Manhattan, Funding, Hudson County, NJ and New York County, NY, Comment Period Ends: 04/28/2008, Contact: Donald Burns 212–668–2182. EIS No. 20080087, Final EIS, FRC, 00, Fayetteville/Greenville Expansion Project, Construction and Operation of the Natural Gas Pipeline Facilities in Arkansas and Mississippi, Wait Period Ends: 04/14/2008, Contact: Andy Black 1–866–208–3372. EIS No. 20080088, Final EIS, FHW, MT, Miller Creek Road Project, To Provide Safe and Improved Access between U.S. 93 and the Miller Creek Area, Missoula County, MT, Wait Period Ends: 04/14/2008, Contact: Craig Genzlinger 406–449–5302 Ext 240. EIS No. 20080089, Final EIS, BLM, CA, United States Gypsum Expansion/ Modernization Project, Expand and Upgrade Plaster City Plant to Increase Wallboard Production Capacity with Related Increases in Water Supply, PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 13895 Right-of-Way Grant, Imperial County, CA, Wait Period Ends: 04/14/2008, Contact: Erin Dreyfuss 760–337–4436. Amended Notices EIS No. 20070514, Draft EIS, AFS, CO, San Juan Public Lands, Draft Land Management Plan (DLMP), Implementation, San Juan National Forest, Archuleta, Conejos, Dolores, Hinsdale, LaPlata, Mineral, Montezuma, Montrose, Rio Grande, San Juan and San Miguel Counties, CO, Comment Period Ends: 04/11/ 2008, Contact: Gary Thrash 970–247– 4874. Revision of FR Published 12/14/ 2007: Extending Comment Period from 03/12/2008 to 04/11/2008. EIS No. 20080019, Draft EIS, MMS, 00, Cape Wind Energy Project, Construction, Operation and Maintenance, and Decommissioning of a Electric Generation Facility, Barnstable, Nantucket and Duke County, MA and Washington County, RI, Comment Period Ends: 04/21/ 2008, Contact: Dr. Rodney E. Cluck 703–787–1087. Revision of FR Published 01/18/2008: Extending Comment Period from 03/20/2008 to 04/21/2008. Dated: March 11, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–5184 Filed 3–13–08; 8:45 am] BILLING CODE 6560–50–P FEDERAL RESERVE SYSTEM Formations of, Acquisitions by, and Mergers of Bank Holding Companies The companies listed in this notice have applied to the Board for approval, pursuant to the Bank Holding Company Act of 1956 (12 U.S.C. 1841 et seq.) (BHC Act), Regulation Y (12 CFR Part 225), and all other applicable statutes and regulations to become a bank holding company and/or to acquire the assets or the ownership of, control of, or the power to vote shares of a bank or bank holding company and all of the banks and nonbanking companies owned by the bank holding company, including the companies listed below. The applications listed below, as well as other related filings required by the Board, are available for immediate inspection at the Federal Reserve Bank indicated. The application also will be available for inspection at the offices of the Board of Governors. Interested persons may express their views in writing on the standards enumerated in the BHC Act (12 U.S.C. 1842(c)). If the proposal also involves the acquisition of E:\FR\FM\14MRN1.SGM 14MRN1

Agencies

[Federal Register Volume 73, Number 51 (Friday, March 14, 2008)]
[Notices]
[Page 13895]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5184]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6696-8]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/

Weekly Receipt of Environmental Impact Statements Filed 03/03/2008 
Through 03/07/2008
Pursuant to 40 CFR 1506.9.

EIS No. 20080080, Second Draft Supplement, COE, CA, Santa Ana River 
Interceptor (SARI) Protection/Relocation Project, Reduce the Risk of 
Damage to the SARI to allow for the Operation of Santa Ana River 
Project (SARP), and Releases from Prado Dam of up to 30,000 cubic feet 
per second (cfs), Right-of-Way Permit and U.S. COE Section 404 Permit, 
Orange and Riverside Counties, CA, Comment Period Ends: 04/28/2008, 
Contact: Raina Fulton 213-452-3872.
EIS No. 20080081, Final EIS, FHW, CA, Interstate 405 (San Diego 
Freeway) Sepulveda Pass Widening Project, Widening and High Occupancy 
Vehicle (HOV) Improvements from Interstate 10 to U.S.-101 in the City 
of Los Angeles, Preferred Alternative is 2, Los Angeles County, CA, 
Wait Period Ends: 04/14/2008, Contact: Cesar Perez 916-498-5065.
EIS No. 20080082, Final EIS, AFS, ID, Cherry Dinner Project, Management 
of Vegetation, Hazardous Fuels, and Access Plus Watershed Improvements, 
Amendment to the Forest Plan, Palouse Ranger District, Clearwater 
National Forest, Latah County, ID, Wait Period Ends: 04/14/2008, 
Contact: Kara Chadwick 208-875-1131.
EIS No. 20080083, Draft Supplement, AFS, WV, Lower Williams Project 
Area (LWPA), Additional Information, Proposed to Perform Vegetation 
Management and Wildlife Habitat Improvements, Implementation, Gauley 
Ranger District, Monongahela National Forest, Webster County, WV, 
Comment Period Ends: 04/28/2008, Contact: O'Dell Tucker 304-799-4334 
Ext 19.
EIS No. 20080084, Draft Supplement, AFS, UT, West Bear Vegetation 
Management Project, Additional Information to Improve a Portion of the 
Cumulative Effects Analysis and Correct the Soils Analysis, Timber 
Harvesting, Prescribed Burning, Roads Construction, Township 1 North, 
Range 9 East, Salt Lake Principle Meridian, Evanston Ranger District, 
Wasatch-Cache National Forest, Summit County, UT, Comment Period Ends: 
04/28/2008, Contact: Larry Johnson 307-783-3194.
EIS No. 20080085, Final EIS, NPS, WA, Olympic National Park General 
Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and 
Mason Counties, WA, Wait Period Ends: 04/14/2008, Contact: Nancy 
Hendricks 360-565-3008.
EIS No. 20080086, Draft Supplement, FTA, NJ, Access to the Region's 
Core Project, Additional Information on the Build Alternative, To 
Increase Trans-Hudson Commuter Rail Capacity, Improve System Safety and 
Reliability between Secaucus Junction Station in NJ and midtown 
Manhattan, Funding, Hudson County, NJ and New York County, NY, Comment 
Period Ends: 04/28/2008, Contact: Donald Burns 212-668-2182.
EIS No. 20080087, Final EIS, FRC, 00, Fayetteville/Greenville Expansion 
Project, Construction and Operation of the Natural Gas Pipeline 
Facilities in Arkansas and Mississippi, Wait Period Ends: 04/14/2008, 
Contact: Andy Black 1-866-208-3372.
EIS No. 20080088, Final EIS, FHW, MT, Miller Creek Road Project, To 
Provide Safe and Improved Access between U.S. 93 and the Miller Creek 
Area, Missoula County, MT, Wait Period Ends: 04/14/2008, Contact: Craig 
Genzlinger 406-449-5302 Ext 240.
EIS No. 20080089, Final EIS, BLM, CA, United States Gypsum Expansion/
Modernization Project, Expand and Upgrade Plaster City Plant to 
Increase Wallboard Production Capacity with Related Increases in Water 
Supply, Right-of-Way Grant, Imperial County, CA, Wait Period Ends: 04/
14/2008, Contact: Erin Dreyfuss 760-337-4436.

Amended Notices

EIS No. 20070514, Draft EIS, AFS, CO, San Juan Public Lands, Draft Land 
Management Plan (DLMP), Implementation, San Juan National Forest, 
Archuleta, Conejos, Dolores, Hinsdale, LaPlata, Mineral, Montezuma, 
Montrose, Rio Grande, San Juan and San Miguel Counties, CO, Comment 
Period Ends: 04/11/2008, Contact: Gary Thrash 970-247-4874. Revision of 
FR Published 12/14/2007: Extending Comment Period from 03/12/2008 to 
04/11/2008.
EIS No. 20080019, Draft EIS, MMS, 00, Cape Wind Energy Project, 
Construction, Operation and Maintenance, and Decommissioning of a 
Electric Generation Facility, Barnstable, Nantucket and Duke County, MA 
and Washington County, RI, Comment Period Ends: 04/21/2008, Contact: 
Dr. Rodney E. Cluck 703-787-1087. Revision of FR Published 01/18/2008: 
Extending Comment Period from 03/20/2008 to 04/21/2008.

    Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E8-5184 Filed 3-13-08; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.