Environmental Impacts Statements; Notice of Availability, 13895 [E8-5184]
Download as PDF
Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080030, ERP No. F–BLM–
J65455–MT, Upper Missouri River
Breaks National Monument Resource
Management Plan, Implementation,
Blaine, Chouteau, Fergus and Phillips
Counties, MT.
Summary: EPA continues to have
environmental concerns about impacts
to water quality and aquatic resources
from road density, cumulative effects
and the adequacy of resources available
for monitoring and adaptive
management and for travel management
enforcement.
Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–5183 Filed 3–13–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6696–8]
rwilkins on PROD1PC63 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/
Weekly Receipt of Environmental
Impact Statements Filed 03/03/2008
Through 03/07/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080080, Second Draft
Supplement, COE, CA, Santa Ana
River Interceptor (SARI) Protection/
Relocation Project, Reduce the Risk of
Damage to the SARI to allow for the
Operation of Santa Ana River Project
(SARP), and Releases from Prado Dam
of up to 30,000 cubic feet per second
(cfs), Right-of-Way Permit and U.S.
COE Section 404 Permit, Orange and
Riverside Counties, CA, Comment
Period Ends: 04/28/2008, Contact:
Raina Fulton 213–452–3872.
EIS No. 20080081, Final EIS, FHW, CA,
Interstate 405 (San Diego Freeway)
Sepulveda Pass Widening Project,
Widening and High Occupancy
Vehicle (HOV) Improvements from
Interstate 10 to U.S.–101 in the City
of Los Angeles, Preferred Alternative
is 2, Los Angeles County, CA, Wait
Period Ends: 04/14/2008, Contact:
Cesar Perez 916–498–5065.
EIS No. 20080082, Final EIS, AFS, ID,
Cherry Dinner Project, Management of
Vegetation, Hazardous Fuels, and
Access Plus Watershed
Improvements, Amendment to the
VerDate Aug<31>2005
19:17 Mar 13, 2008
Jkt 214001
Forest Plan, Palouse Ranger District,
Clearwater National Forest, Latah
County, ID, Wait Period Ends: 04/14/
2008, Contact: Kara Chadwick 208–
875–1131.
EIS No. 20080083, Draft Supplement,
AFS, WV, Lower Williams Project
Area (LWPA), Additional Information,
Proposed to Perform Vegetation
Management and Wildlife Habitat
Improvements, Implementation,
Gauley Ranger District, Monongahela
National Forest, Webster County, WV,
Comment Period Ends: 04/28/2008,
Contact: O’Dell Tucker 304–799–4334
Ext 19.
EIS No. 20080084, Draft Supplement,
AFS, UT, West Bear Vegetation
Management Project, Additional
Information to Improve a Portion of
the Cumulative Effects Analysis and
Correct the Soils Analysis, Timber
Harvesting, Prescribed Burning, Roads
Construction, Township 1 North,
Range 9 East, Salt Lake Principle
Meridian, Evanston Ranger District,
Wasatch-Cache National Forest,
Summit County, UT, Comment Period
Ends: 04/28/2008, Contact: Larry
Johnson 307–783–3194.
EIS No. 20080085, Final EIS, NPS, WA,
Olympic National Park General
Management Plan, Implementation,
Clallam, Grays Harbor, Jefferson and
Mason Counties, WA, Wait Period
Ends: 04/14/2008, Contact: Nancy
Hendricks 360–565–3008.
EIS No. 20080086, Draft Supplement,
FTA, NJ, Access to the Region’s Core
Project, Additional Information on the
Build Alternative, To Increase TransHudson Commuter Rail Capacity,
Improve System Safety and Reliability
between Secaucus Junction Station in
NJ and midtown Manhattan, Funding,
Hudson County, NJ and New York
County, NY, Comment Period Ends:
04/28/2008, Contact: Donald Burns
212–668–2182.
EIS No. 20080087, Final EIS, FRC, 00,
Fayetteville/Greenville Expansion
Project, Construction and Operation
of the Natural Gas Pipeline Facilities
in Arkansas and Mississippi, Wait
Period Ends: 04/14/2008, Contact:
Andy Black 1–866–208–3372.
EIS No. 20080088, Final EIS, FHW, MT,
Miller Creek Road Project, To Provide
Safe and Improved Access between
U.S. 93 and the Miller Creek Area,
Missoula County, MT, Wait Period
Ends: 04/14/2008, Contact: Craig
Genzlinger 406–449–5302 Ext 240.
EIS No. 20080089, Final EIS, BLM, CA,
United States Gypsum Expansion/
Modernization Project, Expand and
Upgrade Plaster City Plant to Increase
Wallboard Production Capacity with
Related Increases in Water Supply,
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
13895
Right-of-Way Grant, Imperial County,
CA, Wait Period Ends: 04/14/2008,
Contact: Erin Dreyfuss 760–337–4436.
Amended Notices
EIS No. 20070514, Draft EIS, AFS, CO,
San Juan Public Lands, Draft Land
Management Plan (DLMP),
Implementation, San Juan National
Forest, Archuleta, Conejos, Dolores,
Hinsdale, LaPlata, Mineral,
Montezuma, Montrose, Rio Grande,
San Juan and San Miguel Counties,
CO, Comment Period Ends: 04/11/
2008, Contact: Gary Thrash 970–247–
4874. Revision of FR Published 12/14/
2007: Extending Comment Period
from 03/12/2008 to 04/11/2008.
EIS No. 20080019, Draft EIS, MMS, 00,
Cape Wind Energy Project,
Construction, Operation and
Maintenance, and Decommissioning
of a Electric Generation Facility,
Barnstable, Nantucket and Duke
County, MA and Washington County,
RI, Comment Period Ends: 04/21/
2008, Contact: Dr. Rodney E. Cluck
703–787–1087. Revision of FR
Published 01/18/2008: Extending
Comment Period from 03/20/2008 to
04/21/2008.
Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–5184 Filed 3–13–08; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL RESERVE SYSTEM
Formations of, Acquisitions by, and
Mergers of Bank Holding Companies
The companies listed in this notice
have applied to the Board for approval,
pursuant to the Bank Holding Company
Act of 1956 (12 U.S.C. 1841 et seq.)
(BHC Act), Regulation Y (12 CFR Part
225), and all other applicable statutes
and regulations to become a bank
holding company and/or to acquire the
assets or the ownership of, control of, or
the power to vote shares of a bank or
bank holding company and all of the
banks and nonbanking companies
owned by the bank holding company,
including the companies listed below.
The applications listed below, as well
as other related filings required by the
Board, are available for immediate
inspection at the Federal Reserve Bank
indicated. The application also will be
available for inspection at the offices of
the Board of Governors. Interested
persons may express their views in
writing on the standards enumerated in
the BHC Act (12 U.S.C. 1842(c)). If the
proposal also involves the acquisition of
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 73, Number 51 (Friday, March 14, 2008)]
[Notices]
[Page 13895]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5184]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6696-8]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/
Weekly Receipt of Environmental Impact Statements Filed 03/03/2008
Through 03/07/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080080, Second Draft Supplement, COE, CA, Santa Ana River
Interceptor (SARI) Protection/Relocation Project, Reduce the Risk of
Damage to the SARI to allow for the Operation of Santa Ana River
Project (SARP), and Releases from Prado Dam of up to 30,000 cubic feet
per second (cfs), Right-of-Way Permit and U.S. COE Section 404 Permit,
Orange and Riverside Counties, CA, Comment Period Ends: 04/28/2008,
Contact: Raina Fulton 213-452-3872.
EIS No. 20080081, Final EIS, FHW, CA, Interstate 405 (San Diego
Freeway) Sepulveda Pass Widening Project, Widening and High Occupancy
Vehicle (HOV) Improvements from Interstate 10 to U.S.-101 in the City
of Los Angeles, Preferred Alternative is 2, Los Angeles County, CA,
Wait Period Ends: 04/14/2008, Contact: Cesar Perez 916-498-5065.
EIS No. 20080082, Final EIS, AFS, ID, Cherry Dinner Project, Management
of Vegetation, Hazardous Fuels, and Access Plus Watershed Improvements,
Amendment to the Forest Plan, Palouse Ranger District, Clearwater
National Forest, Latah County, ID, Wait Period Ends: 04/14/2008,
Contact: Kara Chadwick 208-875-1131.
EIS No. 20080083, Draft Supplement, AFS, WV, Lower Williams Project
Area (LWPA), Additional Information, Proposed to Perform Vegetation
Management and Wildlife Habitat Improvements, Implementation, Gauley
Ranger District, Monongahela National Forest, Webster County, WV,
Comment Period Ends: 04/28/2008, Contact: O'Dell Tucker 304-799-4334
Ext 19.
EIS No. 20080084, Draft Supplement, AFS, UT, West Bear Vegetation
Management Project, Additional Information to Improve a Portion of the
Cumulative Effects Analysis and Correct the Soils Analysis, Timber
Harvesting, Prescribed Burning, Roads Construction, Township 1 North,
Range 9 East, Salt Lake Principle Meridian, Evanston Ranger District,
Wasatch-Cache National Forest, Summit County, UT, Comment Period Ends:
04/28/2008, Contact: Larry Johnson 307-783-3194.
EIS No. 20080085, Final EIS, NPS, WA, Olympic National Park General
Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and
Mason Counties, WA, Wait Period Ends: 04/14/2008, Contact: Nancy
Hendricks 360-565-3008.
EIS No. 20080086, Draft Supplement, FTA, NJ, Access to the Region's
Core Project, Additional Information on the Build Alternative, To
Increase Trans-Hudson Commuter Rail Capacity, Improve System Safety and
Reliability between Secaucus Junction Station in NJ and midtown
Manhattan, Funding, Hudson County, NJ and New York County, NY, Comment
Period Ends: 04/28/2008, Contact: Donald Burns 212-668-2182.
EIS No. 20080087, Final EIS, FRC, 00, Fayetteville/Greenville Expansion
Project, Construction and Operation of the Natural Gas Pipeline
Facilities in Arkansas and Mississippi, Wait Period Ends: 04/14/2008,
Contact: Andy Black 1-866-208-3372.
EIS No. 20080088, Final EIS, FHW, MT, Miller Creek Road Project, To
Provide Safe and Improved Access between U.S. 93 and the Miller Creek
Area, Missoula County, MT, Wait Period Ends: 04/14/2008, Contact: Craig
Genzlinger 406-449-5302 Ext 240.
EIS No. 20080089, Final EIS, BLM, CA, United States Gypsum Expansion/
Modernization Project, Expand and Upgrade Plaster City Plant to
Increase Wallboard Production Capacity with Related Increases in Water
Supply, Right-of-Way Grant, Imperial County, CA, Wait Period Ends: 04/
14/2008, Contact: Erin Dreyfuss 760-337-4436.
Amended Notices
EIS No. 20070514, Draft EIS, AFS, CO, San Juan Public Lands, Draft Land
Management Plan (DLMP), Implementation, San Juan National Forest,
Archuleta, Conejos, Dolores, Hinsdale, LaPlata, Mineral, Montezuma,
Montrose, Rio Grande, San Juan and San Miguel Counties, CO, Comment
Period Ends: 04/11/2008, Contact: Gary Thrash 970-247-4874. Revision of
FR Published 12/14/2007: Extending Comment Period from 03/12/2008 to
04/11/2008.
EIS No. 20080019, Draft EIS, MMS, 00, Cape Wind Energy Project,
Construction, Operation and Maintenance, and Decommissioning of a
Electric Generation Facility, Barnstable, Nantucket and Duke County, MA
and Washington County, RI, Comment Period Ends: 04/21/2008, Contact:
Dr. Rodney E. Cluck 703-787-1087. Revision of FR Published 01/18/2008:
Extending Comment Period from 03/20/2008 to 04/21/2008.
Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-5184 Filed 3-13-08; 8:45 am]
BILLING CODE 6560-50-P