Environmental Impact Statements and Regulations; Availability of EPA Comments, 13894-13895 [E8-5183]
Download as PDF
13894
Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices
the Agency may lengthen the process
and include a second comment period,
as needed.
All comments should be submitted
using the methods in ADDRESSES, and
must be received by EPA on or before
the closing date. Comments will become
part of the Agency Docket for sumithrin.
Comments received after the close of the
comment period will be marked ‘‘late.’’
EPA is not required to consider these
late comments.
B. What is the Agency’s Authority for
Taking this Action?
Section 4(g)(2) of FIFRA, as amended,
directs that, after submission of all data
concerning a pesticide active ingredient,
‘‘the Administrator shall determine
whether pesticides containing such
active ingredient are eligible for
reregistration,’’ before calling in
product-specific data on individual enduse products and either reregistering
products or taking other ‘‘appropriate
regulatory action.’’
List of Subjects
Environmental protection, Pesticides
and pests.
Dated: March 7, 2008.
Steven Bradbury,
Director, Special Review and Reregistration
Division, Office of Pesticide Programs.
[FR Doc. E8–5044 Filed 3–13–08; 8:45 am]
BILLING CODE 6560–50–S
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6696–9]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7167. An explanation of the
ratings assigned to draft environmental
impact statements (EISs) was published
in Federal Register dated April 6, 2007
(72 FR 17156).
rwilkins on PROD1PC63 with NOTICES
Draft EISs
EIS No. 20070452, ERP No. D–BLM–
J65496–CO, Canyons of the Ancients
National Monument Resource
Management Plan, To Address Future
Management Options for
Approximately 165.00 Acres of Land,
VerDate Aug<31>2005
19:17 Mar 13, 2008
Jkt 214001
Dolores and Montezuma Counties,
CO.
Summary: EPA does not object to the
preferred alternative. Rating: LO.
EIS No. 20070497, ERP No. D–FAA–
K51043–CA, Horizon Air Service to
Mammoth Yosemite Airport Project,
Proposed Operations Specifications
Amendment to Provide Scheduled Air
Service, Town of Mammoth Lakes,
Mono County, CA.
Summary: EPA does not object to the
proposed action. Rating: LO.
EIS No. 20070523, ERP No. D–NRC–
E06025–NC, Generic—License
Renewal of Nuclear Plants (GEIS)
Regarding Shearon Harris Nuclear
Power Plant, Unit 1, Plant-Specific
Supplement 33 to NUREG–1437,
Wake County, NC.
Summary: EPA expressed
environmental concerns about water
withdrawal impacts to surface water
under exceptional drought conditions,
and requested radiological monitoring
of all plant effluents, and appropriate
storage and disposition of radioactive
waste. Rating: EC1.
EIS No. 20080006, ERP No. D–FHW–
H40192–NE, Nebraska Highway 35
(N–35) Corridor, To Improve 66-mile
from Norfolk to South Sioux City,
Funding, Madison, Stanton, Wayne,
Dixon, and Dakota Counties, NE.
Summary: EPA expressed
environmental concern about impacts
on two impaired steams, and the
cumulative impacts of induced
residential development, and
recommended that noise attenuation
measures other than structural be
examined. Rating: EC2.
EIS No. 20080013, ERP No. D–AFS–
G65107–NM, Santa Fe National Forest
Project, Settlement Land Transfers:
Pueblo de San Ildefonso, Pueblo of
Santa Clara and Los Alamos County,
Implementation, Santa Fe National
Forest, Los Alamos, Rio Arriba and
Santa Fe Counties, NM.
Summary: EPA does not object to the
proposed action. Rating: LO.
EIS No. 20080016, ERP No. D–FHW–
L40233–ID, Three Cities River
Crossing Project, New Roadway
Crossing of the Boise River at the
Juncture of the Cities of Boise, Eagle
and Garden, Ada County Highway
District (ACHD), Ada County, ID.
Summary: EPA expressed
environmental concerns about air
quality, including ozone, particulate
matter, air toxics, wetlands, aquatic
resources, floodplains, water quality
and stormwater management, and the
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
need to mitigate these impacts. Rating:
EC2.
EIS No. 20080018, ERP No. D–FHW–
K40267–CA, Phase I—CA 11 Corridor
Location and Route Adoption and
Location Identification of the Otay
Mesa East Port of Entry (POE) on Otay
Mesa, Presidential Permit for the POE
and Acquisition of Right-Of-Way
Permit, San Diego County, CA.
Summary: EPA expressed
environmental concerns about air
quality impacts associated with idling
trucks and mobile source air toxics and
cumulative impacts to multiple
resources, and recommended
completing a full cumulative impact
analysis, addressing mobile source air
toxics and committing to anti-idling
methods. Rating: EC2.
EIS No. 20070541, ERP No. DS–NOA–
L91011–AK, Cook Inlet Beluga Whale
Subsistence Harvest Project, Proposes
to Implement a Long-Term Harvest
Plan and Fulfill the Federal
Government’s Trust Responsibility,
Cook Inlet, AK.
Summary: EPA does not object to the
proposed project. Rating: LO.
Final EISs
EIS No. 20070415, ERP No. F–AFS–
J65435–UT, Ogden Ranger District
Travel Plan Revision, To Present
Additional Analysis for Six
Alternatives, Wasatch-Cache National
Forest, Ogden Ranger District, Box
Elder, Cache, Morgan, Weber and
Rich Counties, UT.
Summary: EPA continues to have
environmental concerns about impacts
from trails needing maintenance and
that new trails may not receive
sufficient upkeep.
EIS No. 20070539, ERP No. F–SFW–
K39015–CA, PROGRAMMATIC—
South Bay Salt Pond Restoration
Project, Restored Tidal Marsh,
Managed Ponds, Flood Control
Measures and Public Access Features,
Don Edward San Francisco Bay
National Wildlife Refuge, Alameda,
Santa Clara and San Mateo Counties,
CA.
Summary: The Final PEIS addressed
EPA’s previous concerns; therefore, EPA
does not object to the proposed action.
EIS No. 20080009, ERP No. F–AFS–
J65465–WY, Lower Valley Energy
(LVE) Natural Gas Pipeline Project,
Construction and Operation of a
Pressurized Natural Gas Pipeline,
Special-Use-Authorization, Big Piney
and Jackson Ranger Districts, BridgerTeton National Forest, Sublette and
Teton Counties, WY.
E:\FR\FM\14MRN1.SGM
14MRN1
Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080030, ERP No. F–BLM–
J65455–MT, Upper Missouri River
Breaks National Monument Resource
Management Plan, Implementation,
Blaine, Chouteau, Fergus and Phillips
Counties, MT.
Summary: EPA continues to have
environmental concerns about impacts
to water quality and aquatic resources
from road density, cumulative effects
and the adequacy of resources available
for monitoring and adaptive
management and for travel management
enforcement.
Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–5183 Filed 3–13–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6696–8]
rwilkins on PROD1PC63 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/
Weekly Receipt of Environmental
Impact Statements Filed 03/03/2008
Through 03/07/2008
Pursuant to 40 CFR 1506.9.
EIS No. 20080080, Second Draft
Supplement, COE, CA, Santa Ana
River Interceptor (SARI) Protection/
Relocation Project, Reduce the Risk of
Damage to the SARI to allow for the
Operation of Santa Ana River Project
(SARP), and Releases from Prado Dam
of up to 30,000 cubic feet per second
(cfs), Right-of-Way Permit and U.S.
COE Section 404 Permit, Orange and
Riverside Counties, CA, Comment
Period Ends: 04/28/2008, Contact:
Raina Fulton 213–452–3872.
EIS No. 20080081, Final EIS, FHW, CA,
Interstate 405 (San Diego Freeway)
Sepulveda Pass Widening Project,
Widening and High Occupancy
Vehicle (HOV) Improvements from
Interstate 10 to U.S.–101 in the City
of Los Angeles, Preferred Alternative
is 2, Los Angeles County, CA, Wait
Period Ends: 04/14/2008, Contact:
Cesar Perez 916–498–5065.
EIS No. 20080082, Final EIS, AFS, ID,
Cherry Dinner Project, Management of
Vegetation, Hazardous Fuels, and
Access Plus Watershed
Improvements, Amendment to the
VerDate Aug<31>2005
19:17 Mar 13, 2008
Jkt 214001
Forest Plan, Palouse Ranger District,
Clearwater National Forest, Latah
County, ID, Wait Period Ends: 04/14/
2008, Contact: Kara Chadwick 208–
875–1131.
EIS No. 20080083, Draft Supplement,
AFS, WV, Lower Williams Project
Area (LWPA), Additional Information,
Proposed to Perform Vegetation
Management and Wildlife Habitat
Improvements, Implementation,
Gauley Ranger District, Monongahela
National Forest, Webster County, WV,
Comment Period Ends: 04/28/2008,
Contact: O’Dell Tucker 304–799–4334
Ext 19.
EIS No. 20080084, Draft Supplement,
AFS, UT, West Bear Vegetation
Management Project, Additional
Information to Improve a Portion of
the Cumulative Effects Analysis and
Correct the Soils Analysis, Timber
Harvesting, Prescribed Burning, Roads
Construction, Township 1 North,
Range 9 East, Salt Lake Principle
Meridian, Evanston Ranger District,
Wasatch-Cache National Forest,
Summit County, UT, Comment Period
Ends: 04/28/2008, Contact: Larry
Johnson 307–783–3194.
EIS No. 20080085, Final EIS, NPS, WA,
Olympic National Park General
Management Plan, Implementation,
Clallam, Grays Harbor, Jefferson and
Mason Counties, WA, Wait Period
Ends: 04/14/2008, Contact: Nancy
Hendricks 360–565–3008.
EIS No. 20080086, Draft Supplement,
FTA, NJ, Access to the Region’s Core
Project, Additional Information on the
Build Alternative, To Increase TransHudson Commuter Rail Capacity,
Improve System Safety and Reliability
between Secaucus Junction Station in
NJ and midtown Manhattan, Funding,
Hudson County, NJ and New York
County, NY, Comment Period Ends:
04/28/2008, Contact: Donald Burns
212–668–2182.
EIS No. 20080087, Final EIS, FRC, 00,
Fayetteville/Greenville Expansion
Project, Construction and Operation
of the Natural Gas Pipeline Facilities
in Arkansas and Mississippi, Wait
Period Ends: 04/14/2008, Contact:
Andy Black 1–866–208–3372.
EIS No. 20080088, Final EIS, FHW, MT,
Miller Creek Road Project, To Provide
Safe and Improved Access between
U.S. 93 and the Miller Creek Area,
Missoula County, MT, Wait Period
Ends: 04/14/2008, Contact: Craig
Genzlinger 406–449–5302 Ext 240.
EIS No. 20080089, Final EIS, BLM, CA,
United States Gypsum Expansion/
Modernization Project, Expand and
Upgrade Plaster City Plant to Increase
Wallboard Production Capacity with
Related Increases in Water Supply,
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
13895
Right-of-Way Grant, Imperial County,
CA, Wait Period Ends: 04/14/2008,
Contact: Erin Dreyfuss 760–337–4436.
Amended Notices
EIS No. 20070514, Draft EIS, AFS, CO,
San Juan Public Lands, Draft Land
Management Plan (DLMP),
Implementation, San Juan National
Forest, Archuleta, Conejos, Dolores,
Hinsdale, LaPlata, Mineral,
Montezuma, Montrose, Rio Grande,
San Juan and San Miguel Counties,
CO, Comment Period Ends: 04/11/
2008, Contact: Gary Thrash 970–247–
4874. Revision of FR Published 12/14/
2007: Extending Comment Period
from 03/12/2008 to 04/11/2008.
EIS No. 20080019, Draft EIS, MMS, 00,
Cape Wind Energy Project,
Construction, Operation and
Maintenance, and Decommissioning
of a Electric Generation Facility,
Barnstable, Nantucket and Duke
County, MA and Washington County,
RI, Comment Period Ends: 04/21/
2008, Contact: Dr. Rodney E. Cluck
703–787–1087. Revision of FR
Published 01/18/2008: Extending
Comment Period from 03/20/2008 to
04/21/2008.
Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E8–5184 Filed 3–13–08; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL RESERVE SYSTEM
Formations of, Acquisitions by, and
Mergers of Bank Holding Companies
The companies listed in this notice
have applied to the Board for approval,
pursuant to the Bank Holding Company
Act of 1956 (12 U.S.C. 1841 et seq.)
(BHC Act), Regulation Y (12 CFR Part
225), and all other applicable statutes
and regulations to become a bank
holding company and/or to acquire the
assets or the ownership of, control of, or
the power to vote shares of a bank or
bank holding company and all of the
banks and nonbanking companies
owned by the bank holding company,
including the companies listed below.
The applications listed below, as well
as other related filings required by the
Board, are available for immediate
inspection at the Federal Reserve Bank
indicated. The application also will be
available for inspection at the offices of
the Board of Governors. Interested
persons may express their views in
writing on the standards enumerated in
the BHC Act (12 U.S.C. 1842(c)). If the
proposal also involves the acquisition of
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 73, Number 51 (Friday, March 14, 2008)]
[Notices]
[Pages 13894-13895]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5183]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6696-9]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared pursuant to the Environmental
Review Process (ERP), under section 309 of the Clean Air Act and
Section 102(2)(c) of the National Environmental Policy Act as amended.
Requests for copies of EPA comments can be directed to the Office of
Federal Activities at 202-564-7167. An explanation of the ratings
assigned to draft environmental impact statements (EISs) was published
in Federal Register dated April 6, 2007 (72 FR 17156).
Draft EISs
EIS No. 20070452, ERP No. D-BLM-J65496-CO, Canyons of the Ancients
National Monument Resource Management Plan, To Address Future
Management Options for Approximately 165.00 Acres of Land, Dolores and
Montezuma Counties, CO.
Summary: EPA does not object to the preferred alternative. Rating:
LO.
EIS No. 20070497, ERP No. D-FAA-K51043-CA, Horizon Air Service to
Mammoth Yosemite Airport Project, Proposed Operations Specifications
Amendment to Provide Scheduled Air Service, Town of Mammoth Lakes, Mono
County, CA.
Summary: EPA does not object to the proposed action. Rating: LO.
EIS No. 20070523, ERP No. D-NRC-E06025-NC, Generic--License Renewal of
Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant,
Unit 1, Plant-Specific Supplement 33 to NUREG-1437, Wake County, NC.
Summary: EPA expressed environmental concerns about water
withdrawal impacts to surface water under exceptional drought
conditions, and requested radiological monitoring of all plant
effluents, and appropriate storage and disposition of radioactive
waste. Rating: EC1.
EIS No. 20080006, ERP No. D-FHW-H40192-NE, Nebraska Highway 35 (N-35)
Corridor, To Improve 66-mile from Norfolk to South Sioux City, Funding,
Madison, Stanton, Wayne, Dixon, and Dakota Counties, NE.
Summary: EPA expressed environmental concern about impacts on two
impaired steams, and the cumulative impacts of induced residential
development, and recommended that noise attenuation measures other than
structural be examined. Rating: EC2.
EIS No. 20080013, ERP No. D-AFS-G65107-NM, Santa Fe National Forest
Project, Settlement Land Transfers: Pueblo de San Ildefonso, Pueblo of
Santa Clara and Los Alamos County, Implementation, Santa Fe National
Forest, Los Alamos, Rio Arriba and Santa Fe Counties, NM.
Summary: EPA does not object to the proposed action. Rating: LO.
EIS No. 20080016, ERP No. D-FHW-L40233-ID, Three Cities River Crossing
Project, New Roadway Crossing of the Boise River at the Juncture of the
Cities of Boise, Eagle and Garden, Ada County Highway District (ACHD),
Ada County, ID.
Summary: EPA expressed environmental concerns about air quality,
including ozone, particulate matter, air toxics, wetlands, aquatic
resources, floodplains, water quality and stormwater management, and
the need to mitigate these impacts. Rating: EC2.
EIS No. 20080018, ERP No. D-FHW-K40267-CA, Phase I--CA 11 Corridor
Location and Route Adoption and Location Identification of the Otay
Mesa East Port of Entry (POE) on Otay Mesa, Presidential Permit for the
POE and Acquisition of Right-Of-Way Permit, San Diego County, CA.
Summary: EPA expressed environmental concerns about air quality
impacts associated with idling trucks and mobile source air toxics and
cumulative impacts to multiple resources, and recommended completing a
full cumulative impact analysis, addressing mobile source air toxics
and committing to anti-idling methods. Rating: EC2.
EIS No. 20070541, ERP No. DS-NOA-L91011-AK, Cook Inlet Beluga Whale
Subsistence Harvest Project, Proposes to Implement a Long-Term Harvest
Plan and Fulfill the Federal Government's Trust Responsibility, Cook
Inlet, AK.
Summary: EPA does not object to the proposed project. Rating: LO.
Final EISs
EIS No. 20070415, ERP No. F-AFS-J65435-UT, Ogden Ranger District Travel
Plan Revision, To Present Additional Analysis for Six Alternatives,
Wasatch-Cache National Forest, Ogden Ranger District, Box Elder, Cache,
Morgan, Weber and Rich Counties, UT.
Summary: EPA continues to have environmental concerns about impacts
from trails needing maintenance and that new trails may not receive
sufficient upkeep.
EIS No. 20070539, ERP No. F-SFW-K39015-CA, PROGRAMMATIC--South Bay Salt
Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood
Control Measures and Public Access Features, Don Edward San Francisco
Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo
Counties, CA.
Summary: The Final PEIS addressed EPA's previous concerns;
therefore, EPA does not object to the proposed action.
EIS No. 20080009, ERP No. F-AFS-J65465-WY, Lower Valley Energy (LVE)
Natural Gas Pipeline Project, Construction and Operation of a
Pressurized Natural Gas Pipeline, Special-Use-Authorization, Big Piney
and Jackson Ranger Districts, Bridger-Teton National Forest, Sublette
and Teton Counties, WY.
[[Page 13895]]
Summary: No formal comment letter was sent to the preparing agency.
EIS No. 20080030, ERP No. F-BLM-J65455-MT, Upper Missouri River Breaks
National Monument Resource Management Plan, Implementation, Blaine,
Chouteau, Fergus and Phillips Counties, MT.
Summary: EPA continues to have environmental concerns about impacts
to water quality and aquatic resources from road density, cumulative
effects and the adequacy of resources available for monitoring and
adaptive management and for travel management enforcement.
Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E8-5183 Filed 3-13-08; 8:45 am]
BILLING CODE 6560-50-P