Environmental Impact Statements and Regulations; Availability of EPA Comments, 13894-13895 [E8-5183]

Download as PDF 13894 Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices the Agency may lengthen the process and include a second comment period, as needed. All comments should be submitted using the methods in ADDRESSES, and must be received by EPA on or before the closing date. Comments will become part of the Agency Docket for sumithrin. Comments received after the close of the comment period will be marked ‘‘late.’’ EPA is not required to consider these late comments. B. What is the Agency’s Authority for Taking this Action? Section 4(g)(2) of FIFRA, as amended, directs that, after submission of all data concerning a pesticide active ingredient, ‘‘the Administrator shall determine whether pesticides containing such active ingredient are eligible for reregistration,’’ before calling in product-specific data on individual enduse products and either reregistering products or taking other ‘‘appropriate regulatory action.’’ List of Subjects Environmental protection, Pesticides and pests. Dated: March 7, 2008. Steven Bradbury, Director, Special Review and Reregistration Division, Office of Pesticide Programs. [FR Doc. E8–5044 Filed 3–13–08; 8:45 am] BILLING CODE 6560–50–S ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6696–9] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in Federal Register dated April 6, 2007 (72 FR 17156). rwilkins on PROD1PC63 with NOTICES Draft EISs EIS No. 20070452, ERP No. D–BLM– J65496–CO, Canyons of the Ancients National Monument Resource Management Plan, To Address Future Management Options for Approximately 165.00 Acres of Land, VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 Dolores and Montezuma Counties, CO. Summary: EPA does not object to the preferred alternative. Rating: LO. EIS No. 20070497, ERP No. D–FAA– K51043–CA, Horizon Air Service to Mammoth Yosemite Airport Project, Proposed Operations Specifications Amendment to Provide Scheduled Air Service, Town of Mammoth Lakes, Mono County, CA. Summary: EPA does not object to the proposed action. Rating: LO. EIS No. 20070523, ERP No. D–NRC– E06025–NC, Generic—License Renewal of Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant, Unit 1, Plant-Specific Supplement 33 to NUREG–1437, Wake County, NC. Summary: EPA expressed environmental concerns about water withdrawal impacts to surface water under exceptional drought conditions, and requested radiological monitoring of all plant effluents, and appropriate storage and disposition of radioactive waste. Rating: EC1. EIS No. 20080006, ERP No. D–FHW– H40192–NE, Nebraska Highway 35 (N–35) Corridor, To Improve 66-mile from Norfolk to South Sioux City, Funding, Madison, Stanton, Wayne, Dixon, and Dakota Counties, NE. Summary: EPA expressed environmental concern about impacts on two impaired steams, and the cumulative impacts of induced residential development, and recommended that noise attenuation measures other than structural be examined. Rating: EC2. EIS No. 20080013, ERP No. D–AFS– G65107–NM, Santa Fe National Forest Project, Settlement Land Transfers: Pueblo de San Ildefonso, Pueblo of Santa Clara and Los Alamos County, Implementation, Santa Fe National Forest, Los Alamos, Rio Arriba and Santa Fe Counties, NM. Summary: EPA does not object to the proposed action. Rating: LO. EIS No. 20080016, ERP No. D–FHW– L40233–ID, Three Cities River Crossing Project, New Roadway Crossing of the Boise River at the Juncture of the Cities of Boise, Eagle and Garden, Ada County Highway District (ACHD), Ada County, ID. Summary: EPA expressed environmental concerns about air quality, including ozone, particulate matter, air toxics, wetlands, aquatic resources, floodplains, water quality and stormwater management, and the PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 need to mitigate these impacts. Rating: EC2. EIS No. 20080018, ERP No. D–FHW– K40267–CA, Phase I—CA 11 Corridor Location and Route Adoption and Location Identification of the Otay Mesa East Port of Entry (POE) on Otay Mesa, Presidential Permit for the POE and Acquisition of Right-Of-Way Permit, San Diego County, CA. Summary: EPA expressed environmental concerns about air quality impacts associated with idling trucks and mobile source air toxics and cumulative impacts to multiple resources, and recommended completing a full cumulative impact analysis, addressing mobile source air toxics and committing to anti-idling methods. Rating: EC2. EIS No. 20070541, ERP No. DS–NOA– L91011–AK, Cook Inlet Beluga Whale Subsistence Harvest Project, Proposes to Implement a Long-Term Harvest Plan and Fulfill the Federal Government’s Trust Responsibility, Cook Inlet, AK. Summary: EPA does not object to the proposed project. Rating: LO. Final EISs EIS No. 20070415, ERP No. F–AFS– J65435–UT, Ogden Ranger District Travel Plan Revision, To Present Additional Analysis for Six Alternatives, Wasatch-Cache National Forest, Ogden Ranger District, Box Elder, Cache, Morgan, Weber and Rich Counties, UT. Summary: EPA continues to have environmental concerns about impacts from trails needing maintenance and that new trails may not receive sufficient upkeep. EIS No. 20070539, ERP No. F–SFW– K39015–CA, PROGRAMMATIC— South Bay Salt Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood Control Measures and Public Access Features, Don Edward San Francisco Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo Counties, CA. Summary: The Final PEIS addressed EPA’s previous concerns; therefore, EPA does not object to the proposed action. EIS No. 20080009, ERP No. F–AFS– J65465–WY, Lower Valley Energy (LVE) Natural Gas Pipeline Project, Construction and Operation of a Pressurized Natural Gas Pipeline, Special-Use-Authorization, Big Piney and Jackson Ranger Districts, BridgerTeton National Forest, Sublette and Teton Counties, WY. E:\FR\FM\14MRN1.SGM 14MRN1 Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices Summary: No formal comment letter was sent to the preparing agency. EIS No. 20080030, ERP No. F–BLM– J65455–MT, Upper Missouri River Breaks National Monument Resource Management Plan, Implementation, Blaine, Chouteau, Fergus and Phillips Counties, MT. Summary: EPA continues to have environmental concerns about impacts to water quality and aquatic resources from road density, cumulative effects and the adequacy of resources available for monitoring and adaptive management and for travel management enforcement. Dated: March 11, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–5183 Filed 3–13–08; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–6696–8] rwilkins on PROD1PC63 with NOTICES Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7167 or https://www.epa.gov/ compliance/nepa/ Weekly Receipt of Environmental Impact Statements Filed 03/03/2008 Through 03/07/2008 Pursuant to 40 CFR 1506.9. EIS No. 20080080, Second Draft Supplement, COE, CA, Santa Ana River Interceptor (SARI) Protection/ Relocation Project, Reduce the Risk of Damage to the SARI to allow for the Operation of Santa Ana River Project (SARP), and Releases from Prado Dam of up to 30,000 cubic feet per second (cfs), Right-of-Way Permit and U.S. COE Section 404 Permit, Orange and Riverside Counties, CA, Comment Period Ends: 04/28/2008, Contact: Raina Fulton 213–452–3872. EIS No. 20080081, Final EIS, FHW, CA, Interstate 405 (San Diego Freeway) Sepulveda Pass Widening Project, Widening and High Occupancy Vehicle (HOV) Improvements from Interstate 10 to U.S.–101 in the City of Los Angeles, Preferred Alternative is 2, Los Angeles County, CA, Wait Period Ends: 04/14/2008, Contact: Cesar Perez 916–498–5065. EIS No. 20080082, Final EIS, AFS, ID, Cherry Dinner Project, Management of Vegetation, Hazardous Fuels, and Access Plus Watershed Improvements, Amendment to the VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 Forest Plan, Palouse Ranger District, Clearwater National Forest, Latah County, ID, Wait Period Ends: 04/14/ 2008, Contact: Kara Chadwick 208– 875–1131. EIS No. 20080083, Draft Supplement, AFS, WV, Lower Williams Project Area (LWPA), Additional Information, Proposed to Perform Vegetation Management and Wildlife Habitat Improvements, Implementation, Gauley Ranger District, Monongahela National Forest, Webster County, WV, Comment Period Ends: 04/28/2008, Contact: O’Dell Tucker 304–799–4334 Ext 19. EIS No. 20080084, Draft Supplement, AFS, UT, West Bear Vegetation Management Project, Additional Information to Improve a Portion of the Cumulative Effects Analysis and Correct the Soils Analysis, Timber Harvesting, Prescribed Burning, Roads Construction, Township 1 North, Range 9 East, Salt Lake Principle Meridian, Evanston Ranger District, Wasatch-Cache National Forest, Summit County, UT, Comment Period Ends: 04/28/2008, Contact: Larry Johnson 307–783–3194. EIS No. 20080085, Final EIS, NPS, WA, Olympic National Park General Management Plan, Implementation, Clallam, Grays Harbor, Jefferson and Mason Counties, WA, Wait Period Ends: 04/14/2008, Contact: Nancy Hendricks 360–565–3008. EIS No. 20080086, Draft Supplement, FTA, NJ, Access to the Region’s Core Project, Additional Information on the Build Alternative, To Increase TransHudson Commuter Rail Capacity, Improve System Safety and Reliability between Secaucus Junction Station in NJ and midtown Manhattan, Funding, Hudson County, NJ and New York County, NY, Comment Period Ends: 04/28/2008, Contact: Donald Burns 212–668–2182. EIS No. 20080087, Final EIS, FRC, 00, Fayetteville/Greenville Expansion Project, Construction and Operation of the Natural Gas Pipeline Facilities in Arkansas and Mississippi, Wait Period Ends: 04/14/2008, Contact: Andy Black 1–866–208–3372. EIS No. 20080088, Final EIS, FHW, MT, Miller Creek Road Project, To Provide Safe and Improved Access between U.S. 93 and the Miller Creek Area, Missoula County, MT, Wait Period Ends: 04/14/2008, Contact: Craig Genzlinger 406–449–5302 Ext 240. EIS No. 20080089, Final EIS, BLM, CA, United States Gypsum Expansion/ Modernization Project, Expand and Upgrade Plaster City Plant to Increase Wallboard Production Capacity with Related Increases in Water Supply, PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 13895 Right-of-Way Grant, Imperial County, CA, Wait Period Ends: 04/14/2008, Contact: Erin Dreyfuss 760–337–4436. Amended Notices EIS No. 20070514, Draft EIS, AFS, CO, San Juan Public Lands, Draft Land Management Plan (DLMP), Implementation, San Juan National Forest, Archuleta, Conejos, Dolores, Hinsdale, LaPlata, Mineral, Montezuma, Montrose, Rio Grande, San Juan and San Miguel Counties, CO, Comment Period Ends: 04/11/ 2008, Contact: Gary Thrash 970–247– 4874. Revision of FR Published 12/14/ 2007: Extending Comment Period from 03/12/2008 to 04/11/2008. EIS No. 20080019, Draft EIS, MMS, 00, Cape Wind Energy Project, Construction, Operation and Maintenance, and Decommissioning of a Electric Generation Facility, Barnstable, Nantucket and Duke County, MA and Washington County, RI, Comment Period Ends: 04/21/ 2008, Contact: Dr. Rodney E. Cluck 703–787–1087. Revision of FR Published 01/18/2008: Extending Comment Period from 03/20/2008 to 04/21/2008. Dated: March 11, 2008. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E8–5184 Filed 3–13–08; 8:45 am] BILLING CODE 6560–50–P FEDERAL RESERVE SYSTEM Formations of, Acquisitions by, and Mergers of Bank Holding Companies The companies listed in this notice have applied to the Board for approval, pursuant to the Bank Holding Company Act of 1956 (12 U.S.C. 1841 et seq.) (BHC Act), Regulation Y (12 CFR Part 225), and all other applicable statutes and regulations to become a bank holding company and/or to acquire the assets or the ownership of, control of, or the power to vote shares of a bank or bank holding company and all of the banks and nonbanking companies owned by the bank holding company, including the companies listed below. The applications listed below, as well as other related filings required by the Board, are available for immediate inspection at the Federal Reserve Bank indicated. The application also will be available for inspection at the offices of the Board of Governors. Interested persons may express their views in writing on the standards enumerated in the BHC Act (12 U.S.C. 1842(c)). If the proposal also involves the acquisition of E:\FR\FM\14MRN1.SGM 14MRN1

Agencies

[Federal Register Volume 73, Number 51 (Friday, March 14, 2008)]
[Notices]
[Pages 13894-13895]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5183]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6696-9]


Environmental Impact Statements and Regulations; Availability of 
EPA Comments

    Availability of EPA comments prepared pursuant to the Environmental 
Review Process (ERP), under section 309 of the Clean Air Act and 
Section 102(2)(c) of the National Environmental Policy Act as amended. 
Requests for copies of EPA comments can be directed to the Office of 
Federal Activities at 202-564-7167. An explanation of the ratings 
assigned to draft environmental impact statements (EISs) was published 
in Federal Register dated April 6, 2007 (72 FR 17156).

Draft EISs

EIS No. 20070452, ERP No. D-BLM-J65496-CO, Canyons of the Ancients 
National Monument Resource Management Plan, To Address Future 
Management Options for Approximately 165.00 Acres of Land, Dolores and 
Montezuma Counties, CO.

    Summary: EPA does not object to the preferred alternative. Rating: 
LO.

EIS No. 20070497, ERP No. D-FAA-K51043-CA, Horizon Air Service to 
Mammoth Yosemite Airport Project, Proposed Operations Specifications 
Amendment to Provide Scheduled Air Service, Town of Mammoth Lakes, Mono 
County, CA.

    Summary: EPA does not object to the proposed action. Rating: LO.

EIS No. 20070523, ERP No. D-NRC-E06025-NC, Generic--License Renewal of 
Nuclear Plants (GEIS) Regarding Shearon Harris Nuclear Power Plant, 
Unit 1, Plant-Specific Supplement 33 to NUREG-1437, Wake County, NC.

    Summary: EPA expressed environmental concerns about water 
withdrawal impacts to surface water under exceptional drought 
conditions, and requested radiological monitoring of all plant 
effluents, and appropriate storage and disposition of radioactive 
waste. Rating: EC1.

EIS No. 20080006, ERP No. D-FHW-H40192-NE, Nebraska Highway 35 (N-35) 
Corridor, To Improve 66-mile from Norfolk to South Sioux City, Funding, 
Madison, Stanton, Wayne, Dixon, and Dakota Counties, NE.

    Summary: EPA expressed environmental concern about impacts on two 
impaired steams, and the cumulative impacts of induced residential 
development, and recommended that noise attenuation measures other than 
structural be examined. Rating: EC2.

EIS No. 20080013, ERP No. D-AFS-G65107-NM, Santa Fe National Forest 
Project, Settlement Land Transfers: Pueblo de San Ildefonso, Pueblo of 
Santa Clara and Los Alamos County, Implementation, Santa Fe National 
Forest, Los Alamos, Rio Arriba and Santa Fe Counties, NM.

    Summary: EPA does not object to the proposed action. Rating: LO.

EIS No. 20080016, ERP No. D-FHW-L40233-ID, Three Cities River Crossing 
Project, New Roadway Crossing of the Boise River at the Juncture of the 
Cities of Boise, Eagle and Garden, Ada County Highway District (ACHD), 
Ada County, ID.

    Summary: EPA expressed environmental concerns about air quality, 
including ozone, particulate matter, air toxics, wetlands, aquatic 
resources, floodplains, water quality and stormwater management, and 
the need to mitigate these impacts. Rating: EC2.

EIS No. 20080018, ERP No. D-FHW-K40267-CA, Phase I--CA 11 Corridor 
Location and Route Adoption and Location Identification of the Otay 
Mesa East Port of Entry (POE) on Otay Mesa, Presidential Permit for the 
POE and Acquisition of Right-Of-Way Permit, San Diego County, CA.

    Summary: EPA expressed environmental concerns about air quality 
impacts associated with idling trucks and mobile source air toxics and 
cumulative impacts to multiple resources, and recommended completing a 
full cumulative impact analysis, addressing mobile source air toxics 
and committing to anti-idling methods. Rating: EC2.

EIS No. 20070541, ERP No. DS-NOA-L91011-AK, Cook Inlet Beluga Whale 
Subsistence Harvest Project, Proposes to Implement a Long-Term Harvest 
Plan and Fulfill the Federal Government's Trust Responsibility, Cook 
Inlet, AK.

    Summary: EPA does not object to the proposed project. Rating: LO.

Final EISs

EIS No. 20070415, ERP No. F-AFS-J65435-UT, Ogden Ranger District Travel 
Plan Revision, To Present Additional Analysis for Six Alternatives, 
Wasatch-Cache National Forest, Ogden Ranger District, Box Elder, Cache, 
Morgan, Weber and Rich Counties, UT.

    Summary: EPA continues to have environmental concerns about impacts 
from trails needing maintenance and that new trails may not receive 
sufficient upkeep.

EIS No. 20070539, ERP No. F-SFW-K39015-CA, PROGRAMMATIC--South Bay Salt 
Pond Restoration Project, Restored Tidal Marsh, Managed Ponds, Flood 
Control Measures and Public Access Features, Don Edward San Francisco 
Bay National Wildlife Refuge, Alameda, Santa Clara and San Mateo 
Counties, CA.

    Summary: The Final PEIS addressed EPA's previous concerns; 
therefore, EPA does not object to the proposed action.

EIS No. 20080009, ERP No. F-AFS-J65465-WY, Lower Valley Energy (LVE) 
Natural Gas Pipeline Project, Construction and Operation of a 
Pressurized Natural Gas Pipeline, Special-Use-Authorization, Big Piney 
and Jackson Ranger Districts, Bridger-Teton National Forest, Sublette 
and Teton Counties, WY.


[[Page 13895]]


    Summary: No formal comment letter was sent to the preparing agency.

EIS No. 20080030, ERP No. F-BLM-J65455-MT, Upper Missouri River Breaks 
National Monument Resource Management Plan, Implementation, Blaine, 
Chouteau, Fergus and Phillips Counties, MT.

    Summary: EPA continues to have environmental concerns about impacts 
to water quality and aquatic resources from road density, cumulative 
effects and the adequacy of resources available for monitoring and 
adaptive management and for travel management enforcement.

    Dated: March 11, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E8-5183 Filed 3-13-08; 8:45 am]