Download as PDF rwilkins on PROD1PC63 with NOTICES Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Proposed Scope of Studies under Permit: A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. p. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. q. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Any additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 Commission, at the above-mentioned address. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. r. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–5114 Filed 3–13–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13120–000] Duquesne Light Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments March 7, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit. b. Project No.: 13120–000. c. Date filed: February 21, 2008. d. Applicant: Duquesne Light Company. e. Name of Project: Monongahela Lock & Dam No. 4 Hydroelectric Project. f. Location: Monongahela River in Westmoreland County, Pennsylvania. It would use the U.S. Army Corps of Engineers’ Monongahela Lock & Dam No. 4. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Chris P. McClain, Paul C. Rizzo Associates Inc., 105 Mall Boulevard, Suite 270–E, Monroeville, PA 15146, (412) 856–9700. i. FERC Contact: Robert Bell, (202) 502–4126. j. Deadline for filing motions to intervene, protests and comments: 60 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 13885 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the project number (P– 13120–000) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Competing Application: Project No. 12906–000, Date Filed: July 30, 2007, Date Issued: November 26, 2007, Competing Applications Deadline: closed. l. Description of Project: The proposed project, using the U.S. Army Corps of Engineers’ Monongahela Lock & Dam No. 4 and operated in a run-of-river mode, would consist of: (1) A new intake structure; (2) a new powerhouse containing three generating units with a total installed capacity of 20 megawatts; (3) a new 5,500-foot long, 34 kilovolt transmission line; and (4) appurtenant facilities. The proposed Monongahela Lock & Dam No. 4 Project would have an average annual generation of 85 gigawatt-hours, which would be used to service its customers. m. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. E:\FR\FM\14MRN1.SGM 14MRN1 rwilkins on PROD1PC63 with NOTICES 13886 Federal Register / Vol. 73, No. 51 / Friday, March 14, 2008 / Notices n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Proposed Scope of Studies under Permit: A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. p. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. q. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission’s regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. r. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the VerDate Aug<31>2005 19:17 Mar 13, 2008 Jkt 214001 Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–5115 Filed 3–13–08; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13121–000] Duquesne Light Company; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments March 7, 2008. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Preliminary Permit b. Project No.: 13121–000 c. Date filed: February 21, 2008 d. Applicant: Duquesne Light Company e. Name of Project: Emsworth Lock & Dam Hydroelectric Project f. Location: Ohio River in Allegheny County, Pennsylvania. It would use the U.S. Army Corps of Engineers’ Emsworth Lock & Dam. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)—825(r). h. Applicant Contact: Mr. Chris P. McClain, Paul C. Rizzo Associates Inc., 105 Mall Boulevard, Suite 270–E, Monroeville, PA 15146, (412) 856–9700. i. FERC Contact: Robert Bell, (202) 502–4126. j. Deadline for filing motions to intervene, protests and comments: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site under the ‘‘e-Filing’’ link. The Commission strongly encourages electronic filings. Please include the project number (P– 13121–000) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all intervenors PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Competing Application: Project No. 12905–000, Date Filed: July 30, 2007, Date Issued: November 26, 2007, Competing Applications Deadline: closed. l. Description of Project: The proposed project, using the U.S. Army Corps of Engineers’ Emsworth Lock & Dam and operated in a run-of-river mode, would consist of: (1) A new intake structure; (2) a new powerhouse containing three generating units with a total installed capacity of 35 megawatts; (3) a new 11,000-foot long, 34 kilovolt transmission line; and (4) appurtenant facilities. The proposed Emsworth Lock & Dam Project would have an average annual generation of 145 gigawatthours, which would be used to service its customers. m. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street, NE, Room 2A, Washington DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item h above. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Proposed Scope of Studies under Permit: A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36 months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. p. Comments, Protests, or Motions to Intervene: Anyone may submit E:\FR\FM\14MRN1.SGM 14MRN1

Agencies

[Federal Register Volume 73, Number 51 (Friday, March 14, 2008)]
[Notices]
[Pages 13885-13886]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5115]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13120-000]


Duquesne Light Company; Notice of Application Accepted for Filing 
and Soliciting Motions To Intervene, Protests, and Comments

March 7, 2008.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Preliminary Permit.
    b. Project No.: 13120-000.
    c. Date filed: February 21, 2008.
    d. Applicant: Duquesne Light Company.
    e. Name of Project: Monongahela Lock & Dam No. 4 Hydroelectric 
Project.
    f. Location: Monongahela River in Westmoreland County, 
Pennsylvania. It would use the U.S. Army Corps of Engineers' 
Monongahela Lock & Dam No. 4.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Chris P. McClain, Paul C. Rizzo 
Associates Inc., 105 Mall Boulevard, Suite 270-E, Monroeville, PA 
15146, (412) 856-9700.
    i. FERC Contact: Robert Bell, (202) 502-4126.
    j. Deadline for filing motions to intervene, protests and comments: 
60 days from the issuance date of this notice.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Comments, protests, and 
interventions may be filed electronically via the Internet in lieu of 
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site under the ``e-Filing'' link. The Commission 
strongly encourages electronic filings. Please include the project 
number (P-13120-000) on any comments or motions filed.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. Competing Application: Project No. 12906-000, Date Filed: July 
30, 2007, Date Issued: November 26, 2007, Competing Applications 
Deadline: closed.
    l. Description of Project: The proposed project, using the U.S. 
Army Corps of Engineers' Monongahela Lock & Dam No. 4 and operated in a 
run-of-river mode, would consist of: (1) A new intake structure; (2) a 
new powerhouse containing three generating units with a total installed 
capacity of 20 megawatts; (3) a new 5,500-foot long, 34 kilovolt 
transmission line; and (4) appurtenant facilities. The proposed 
Monongahela Lock & Dam No. 4 Project would have an average annual 
generation of 85 gigawatt-hours, which would be used to service its 
customers.
    m. Locations of Applications: A copy of the application is 
available for inspection and reproduction at the Commission in the 
Public Reference Room, located at 888 First Street, NE., Room 2A, 
Washington, DC 20426, or by calling (202) 502-8371. This filing may 
also be viewed on the Commission's Web site at https://www.ferc.gov 
using the ``eLibrary'' link. Enter the docket number excluding the last 
three digits in the docket number field to access the document. For 
assistance, call toll-free 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item h 
above.

[[Page 13886]]

    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Proposed Scope of Studies under Permit: A preliminary permit, if 
issued, does not authorize construction. The term of the proposed 
preliminary permit would be 36 months. The work proposed under the 
preliminary permit would include economic analysis, preparation of 
preliminary engineering plans, and a study of environmental impacts. 
Based on the results of these studies, the Applicant would decide 
whether to proceed with the preparation of a development application to 
construct and operate the project.
    p. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    q. Filing and Service of Responsive Documents: Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'', as applicable, and the Project Number of the 
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number 
of copies provided by the Commission's regulations to: The Secretary, 
Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426. An additional copy must be sent to Director, 
Division of Hydropower Administration and Compliance, Federal Energy 
Regulatory Commission, at the above-mentioned address. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site under the ``e-Filing'' 
link. The Commission strongly encourages electronic filings.
    r. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-5115 Filed 3-13-08; 8:45 am]
BILLING CODE 6717-01-P