ExxonMobil Oil Corporation v. Calnev Pipe Line LLC; Tesoro Refining and Marketing Company v. Calnev Pipe Line LLC; America West Airlines, Inc. and U.S. Airways, Inc., Chevron Products Company, Continental Airlines, Inc., Northwest Airlines, Inc., Southwest Airlines Co., and Valero Marketing and Supply Company v. Calnev Pipe Line LLC; ConocoPhillips Company v. Calnev Pipe Line LLC; BP West Coast Products LLC v. Calnev Pipe Line LLC; Notice Permitting Futher Answers, 13540 [E8-5030]
Download as PDF
13540
Federal Register / Vol. 73, No. 50 / Thursday, March 13, 2008 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR07–5–000, Docket No. OR07–
7–000, Docket No. OR07–18–000, Docket
No. OR07–19–000, Docket No. OR07–22–
000]
ExxonMobil Oil Corporation v. Calnev
Pipe Line LLC; Tesoro Refining and
Marketing Company v. Calnev Pipe
Line LLC; America West Airlines, Inc.
and U.S. Airways, Inc., Chevron
Products Company, Continental
Airlines, Inc., Northwest Airlines, Inc.,
Southwest Airlines Co., and Valero
Marketing and Supply Company v.
Calnev Pipe Line LLC; ConocoPhillips
Company v. Calnev Pipe Line LLC; BP
West Coast Products LLC v. Calnev
Pipe Line LLC; Notice Permitting
Futher Answers
March 6, 2008.
On March 3, 2008, Calnev Pipe Line
LLC (Calnev) filed a combined answer
to the complaints listed in the caption
of this order. Given the novelty of some
of the issues, notice is hereby given that
the complainants may file answers to
Calnev’s March 3, 2008 filing no later
than March 18, 2008. Any factual
assertions in those answers shall be
supported by sworn affidavits.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–5030 Filed 3–12–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13100–000]
Midriver Power L.L.C.; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
mstockstill on PROD1PC66 with NOTICES
March 6, 2008.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: P–13100–000.
c. Date Filed: January 23, 2008.
d. Applicant: Midriver Power L.L.C.
e. Name of the Project: Coralville Lake
Hydropower Project.
f. Location: The project would be
located on the Iowa River in Johnson
County, Iowa. The Coralville Lake Dam
is owned and maintained by the U.S.
Army Corps of Engineers.
VerDate Aug<31>2005
16:19 Mar 12, 2008
Jkt 214001
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Kenneth D.
Bickner, Midriver Power L.L.C., 539
Kimball Road, Iowa City, IA 52245 (319)
337–5645.
i. FERC Contact: Patricia W. Gillis,
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number
(P–13100–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would utilize the
existing U. S. Army Corps of Engineers’
Coralville Lake Dam and would consist
of: (1) Two 70-foot-long, 180-inch
diameter proposed penstocks; (2) a
proposed powerhouse containing two
generating units with a total installed
capacity of 5.7-megawatts; (3) a
proposed transmission line; and (4)
appurtenant facilities. The proposed
project would have an estimated annual
generation of 50-gigawatts and would be
sold to a local utility.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
o. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
p. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
E:\FR\FM\13MRN1.SGM
13MRN1
Agencies
[Federal Register Volume 73, Number 50 (Thursday, March 13, 2008)]
[Notices]
[Page 13540]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5030]
[[Page 13540]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR07-5-000, Docket No. OR07-7-000, Docket No. OR07-18-000,
Docket No. OR07-19-000, Docket No. OR07-22-000]
ExxonMobil Oil Corporation v. Calnev Pipe Line LLC; Tesoro
Refining and Marketing Company v. Calnev Pipe Line LLC; America West
Airlines, Inc. and U.S. Airways, Inc., Chevron Products Company,
Continental Airlines, Inc., Northwest Airlines, Inc., Southwest
Airlines Co., and Valero Marketing and Supply Company v. Calnev Pipe
Line LLC; ConocoPhillips Company v. Calnev Pipe Line LLC; BP West Coast
Products LLC v. Calnev Pipe Line LLC; Notice Permitting Futher Answers
March 6, 2008.
On March 3, 2008, Calnev Pipe Line LLC (Calnev) filed a combined
answer to the complaints listed in the caption of this order. Given the
novelty of some of the issues, notice is hereby given that the
complainants may file answers to Calnev's March 3, 2008 filing no later
than March 18, 2008. Any factual assertions in those answers shall be
supported by sworn affidavits.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-5030 Filed 3-12-08; 8:45 am]