Montana: Filing of Plat of Survey, 13560 [E8-5007]

Download as PDF 13560 Federal Register / Vol. 73, No. 50 / Thursday, March 13, 2008 / Notices public comment and coordination with State and local governments or other Federal agencies. The criteria developed for the Calnev Project EIS/EIR include the following: 1. Comply with applicable laws, Executive Orders, and regulations. 2. Minimize deviations from the existing utility corridor to the extent feasible. 3. Select an alignment in consideration of its effects on other critical linear public utilities and transportation corridors. 4. Analyze a corridor modification that reestablishes a complete corridor along I–15 adequate to accommodate the current Calnev project and anticipated future projects and that avoids crossing lands within the Mojave National Preserve. BLM must take into consideration state law when granting the ROW. The EIS/EIR will describe and analyze the proposed project as proposed and will include: (1) BLM measures to avoid, minimize, or mitigate impacts on the environment; (2) Additional mitigation measures; (3) The ‘‘No Action’’ alternative; and (4) Alternative pipeline routes, segments or other distribution methods. Through public scoping BLM expects to identify various issues, potential impacts and mitigation measures. BLM has identified a potential list of issues that will need to be addressed in this analysis including but not limited to: Air quality; social and economic, traffic; ground and surface water quantity and quality; plant and animal species including special status species; cultural resources; visual resources; and public health and safety. If approved, this pipeline project on public lands would be authorized in accordance with the Mineral Leasing Act at Title 30, Chapter 3A, Subchapter I, Subsection 185. survey of the lands described below in the BLM Montana State Office, Billings, Montana, (30) days from the date of publication in the Federal Register. FOR FURTHER INFORMATION CONTACT: Marvin Montoya, Cadastral Surveyor, Branch of Cadastral Survey, Bureau of Land Management, 5001 Southgate Drive, Billings, Montana 59101–4669, telephone (406) 896–5124 or (406) 896– 5009. SUPPLEMENTARY INFORMATION: This survey was executed at the request of the Fort Peck Agency, through the Rocky Mountain Regional Director, Bureau of Indian Affairs, and was necessary to determine Trust and Tribal land. Dated: March 5, 2008. Mickey Quillman, Acting Field Manager, Barstow Field Office. [FR Doc. E8–5004 Filed 3–12–08; 8:45 am] Dated: March 7, 2008. James D. Claflin, Acting Chief Cadastral Surveyor, Division of Resources. [FR Doc. E8–5007 Filed 3–12–08; 8:45 am] BILLING CODE 4310–40–P The lands we surveyed are: Principal Meridian Montana T. 26 N., R. 44 E. The plat, in 2 sheets, representing the dependent resurvey of a portion of the east boundary, a portion of the subdivisional lines, the adjusted original meanders of the former left bank of the Missouri River, downstream, through section 12, a portion of the subdivision of section 12, and survey of a portion of the meanders of the present left bank of the Missouri River, downstream, through section 12, the informative traverse of the present left bank of the Missouri River, downstream, through section 12, and certain division of accretion lines, Township 26 North, Range 44 East, Principal Meridian, Montana, was accepted February 1, 2008. We will place copies of the plat, in 2 sheets, and related field notes we described in the open files. They will be available to the public as a matter of information. If BLM receives a protest against this survey, as shown on this plat, in 2 sheets, prior to the date of the official filing, we will stay the filing pending our consideration of the protest. We will not officially file this plat, in 2 sheets, until the day after we have accepted or dismissed all protests and they have become final, including decisions or appeals. BILLING CODE 4310–$$–P DEPARTMENT OF THE INTERIOR DEPARTMENT OF THE INTERIOR Bureau of Land Management Bureau of Land Management [MT–926–08–1420–BJ–TRST] mstockstill on PROD1PC66 with NOTICES Montana: Filing of Plat of Survey Bureau of Land Management, Montana State Office, Interior. ACTION: Notice of Filing of Plat of Survey. AGENCY: SUMMARY: The Bureau of Land Management (BLM) will file the plat of VerDate Aug<31>2005 16:19 Mar 12, 2008 Jkt 214001 [NV–050–5853–ES; N–78796, N–80170, N–80171, N–80172, N–80173, and N–81374; 8–08807; TAS: 14X5232] Notice of Realty Action: Lease/ Conveyance for Recreation and Public Purposes in Clark County, NV AGENCY: Bureau of Land Management, Interior. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 ACTION: Notice. SUMMARY: Recreation and Public Purposes (R&PP) Act request for lease and subsequent conveyance of approximately 230.26 acres of public land in Las Vegas, Clark County, Nevada. Clark County proposes to use the land as six public parks. DATES: Interested parties may submit written comments regarding the proposed lease/conveyance of the lands until April 28, 2008. ADDRESSES: Mail written comments to the BLM Field Manager, Las Vegas Field Office, 4701 N. Torrey Pines Drive, Las Vegas, NV 89130–2301. FOR FURTHER INFORMATION CONTACT: Brenda Warner, (702) 515–5084. SUPPLEMENTARY INFORMATION: The following described public land in Clark County, Nevada has been examined and found suitable for lease and subsequent conveyance for recreational or public purposes under the provisions of the R&PP Act, as amended (43 U.S.C. 869 et seq.). These six parcels of land are in the Las Vegas Valley and are legally described as: Mount Diablo Meridian, Nevada N–78796 (76.49 Acres) T. 21 S., R. 60 E., Sec. 24, within S1⁄2SE1⁄4. General Location: Central part of the Las Vegas Valley northwest of the intersection of Tropicana Avenue and Decatur Boulevard. N–80170 (15 Acres) T. 22 S., R. 60 E., Sec. 34, E1⁄2SW1⁄4SW1⁄4NE1⁄4, SE1⁄4SW1⁄4NE1⁄4. General Location: Southwestern part of the Las Vegas Valley northeast of the intersection of Erie Avenue and Tenaya Way. N–80171 (20 Acres) T. 22 S., R. 60 E., Sec. 27, N1⁄2SE1⁄4NE1⁄4. General Location: Southwestern part of the Las Vegas Valley southwest of the intersection of Le Baron Avenue and Rainbow Boulevard. N–80172 (15 Acres) T. 22 S., R. 60 E., Sec. 21, S1⁄2NE1⁄4NE1⁄4SW1⁄4, SE1⁄4NW1⁄4NE1⁄4SW1⁄4, NE1⁄4SW1⁄4NE1⁄4SW1⁄4, N1⁄2SE1⁄4NE1⁄4SW1⁄4. General Location: Southwestern part of the Las Vegas Valley southwest of the intersection of Serene Avenue and Cimarron Road. N–80173 (20 Acres) T. 22 S., R. 60 E., Sec. 29, S1⁄2NE1⁄4SW1⁄4NE1⁄4, N1⁄2SE1⁄4SW1⁄4NE1⁄4, S1⁄2NW1⁄4SE1⁄4NE1⁄4, N1⁄2SW1⁄4SE1⁄4NE1⁄4. E:\FR\FM\13MRN1.SGM 13MRN1

Agencies

[Federal Register Volume 73, Number 50 (Thursday, March 13, 2008)]
[Notices]
[Page 13560]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-5007]


-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

[MT-926-08-1420-BJ-TRST]


Montana: Filing of Plat of Survey

AGENCY: Bureau of Land Management, Montana State Office, Interior.

ACTION: Notice of Filing of Plat of Survey.

-----------------------------------------------------------------------

SUMMARY: The Bureau of Land Management (BLM) will file the plat of 
survey of the lands described below in the BLM Montana State Office, 
Billings, Montana, (30) days from the date of publication in the 
Federal Register.

FOR FURTHER INFORMATION CONTACT: Marvin Montoya, Cadastral Surveyor, 
Branch of Cadastral Survey, Bureau of Land Management, 5001 Southgate 
Drive, Billings, Montana 59101-4669, telephone (406) 896-5124 or (406) 
896-5009.

SUPPLEMENTARY INFORMATION: This survey was executed at the request of 
the Fort Peck Agency, through the Rocky Mountain Regional Director, 
Bureau of Indian Affairs, and was necessary to determine Trust and 
Tribal land.

    The lands we surveyed are:

Principal Meridian Montana

T. 26 N., R. 44 E.

    The plat, in 2 sheets, representing the dependent resurvey of a 
portion of the east boundary, a portion of the subdivisional lines, 
the adjusted original meanders of the former left bank of the 
Missouri River, downstream, through section 12, a portion of the 
subdivision of section 12, and survey of a portion of the meanders 
of the present left bank of the Missouri River, downstream, through 
section 12, the informative traverse of the present left bank of the 
Missouri River, downstream, through section 12, and certain division 
of accretion lines, Township 26 North, Range 44 East, Principal 
Meridian, Montana, was accepted February 1, 2008.
    We will place copies of the plat, in 2 sheets, and related field 
notes we described in the open files. They will be available to the 
public as a matter of information.
    If BLM receives a protest against this survey, as shown on this 
plat, in 2 sheets, prior to the date of the official filing, we will 
stay the filing pending our consideration of the protest.
    We will not officially file this plat, in 2 sheets, until the 
day after we have accepted or dismissed all protests and they have 
become final, including decisions or appeals.

    Dated: March 7, 2008.
James D. Claflin,
Acting Chief Cadastral Surveyor, Division of Resources.
[FR Doc. E8-5007 Filed 3-12-08; 8:45 am]
BILLING CODE 4310-$$-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.