Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications, 11695 [E8-4111]
Download as PDF
11695
Federal Register / Vol. 73, No. 43 / Tuesday, March 4, 2008 / Notices
(Catalog of Federal Domestic Assistance
Program Number 20.205, Highway Planning
and Construction. The regulations
implementing Executive Order 12372
regarding intergovernmental consultation on
Federal programs and activities apply to this
program.)
Authority: 23 U.S.C. 139(l)(1).
Issued on: February 26, 2008.
Jeffrey W. Kolb,
Division Administrator, Federal Highway
Administration, Albany, New York.
[FR Doc. E8–4090 Filed 3–3–08; 8:45 am]
BILLING CODE 4910–RY–P
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials
Safety Administration
Office of Hazardous Materials Safety;
Notice of Delays in Processing of
Special Permits Applications
Pipeline and Hazardous
Materials Safety Administration
(PHMSA), DOT.
AGENCY:
List of applications delayed
more than 180 days.
ACTION:
SUMMARY: In accordance with the
requirements of 49 U.S.C. 5117( c),
PHMSA is publishing the following list
of special permit applications that have
been in process for 180 days or more.
The reason(s) for delay and the expected
completion date for action on each
application is provided in association
with each identified application.
FOR FURTHER INFORMATION CONTACT:
Delmer F. Billings, Director, Office of
Hazardous Materials Special Permits
and Approvals, Pipeline and Hazardous
Materials Safety Administration, U.S.
Department of Transportation, East
Building, PHH–30, 1200 New Jersey
Avenue, Southeast, Washington, DC
20590–0001, (202) 366–4535.
3. Application is technically complex
and is of significant impact or
precedent-setting and requires extensive
analysis.
4. Staff review delayed by other
priority issues or volume of special
permit applications.
Meaning of Application Number
Suffixes
N—New application.
M—Modification request.
PM—Party to application with
modification request.
Issued in Washington, DC, on February 27,
2008.
Delmer F. Billings,
Director, Office of Hazardous Materials,
Special Permits and Approvals.
Key to ‘‘Reason for Delay’’
1. Awaiting additional information
from applicant.
2. Extensive public comment under
review.
Application No.
Reason for
delay of
completion
Applicant
Estimated date
Modification to Special Permits
11579–M ...........
10964–M ...........
13173–M ...........
Austin Powder Company, Cleveland, OR ................................................................................
Kidde Aerospace & Defense, Wilson, NC ................................................................................
Dynetek Industries Ltd., Calgary Alberta, Canada ...................................................................
3, 4
4
1
03–31–2008
03–31–2008
03–31–2008
4
3
1
3
3,4
3,4
03–31–2008
03–31–2008
03–31–2008
03–31–2008
03–31–2008
03–31–2008
New Special Permit Applications
14385–N
14566–N
14576–N
14572–N
14549–N
14402–N
...........
...........
...........
...........
...........
...........
Kansas City Southern Railway Company, Kansas City, MO ...................................................
Nantong CIMCTank Equipment Co. Ltd., Nantong City ..........................................................
Structural Composites Industries(SCI), Pomona, CA ..............................................................
WEW Westerwaelder Eisenwerk, Weitefeld Germany .............................................................
Greif, Inc., Delaware, OR .........................................................................................................
Lincoln Composites, Lincoln, NE ..............................................................................................
[FR Doc. E8–4111 Filed 3–3–08; 8:45 am]
BILLING CODE 4910–60–P
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials
Safety Administration
[Docket No. PHMSA–RSPA–2004–19856]
Pipeline Safety: Issues Related to
Mechanical Couplings Used in Natural
Gas Distribution Systems
Pipeline and Hazardous
Materials Safety Administration
(PHMSA), DOT.
ACTION: Notice; issuance of advisory
bulletin.
sroberts on PROD1PC70 with NOTICES
AGENCY:
Recent events concerning
failures of mechanical couplings and
SUMMARY:
VerDate Aug<31>2005
17:57 Mar 03, 2008
Jkt 214001
related appurtenances have raised
concerns about safety in natural gas
distribution systems. This notice
updates information provided in
Advisory Bulletin ADB–86–02 and
advises owners and operators of gas
pipelines to consider the potential
failure modes for mechanical couplings
used for joining and pressure sealing
two pipes together. Failures can occur
when there is inadequate restraint for
the potential stresses on the two pipes,
when the couplings are incorrectly
installed or supported, or when the
coupling components such as
elastomers degrade over time. In
addition, inadequate leak surveys which
fail to identify leaks requiring
immediate repair can lead to more
serious incidents. This notice urges
operators to review their procedures for
using mechanical couplings and ensure
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
coupling design, installation
procedures, leak survey procedures, and
personnel qualifications meet Federal
requirements. Operators should work
with Federal and State pipeline safety
representatives, manufacturers, and
industry partners to determine how best
to resolve potential issues in their
respective state or region. Documented
repair or replacement programs may
prove beneficial to all stakeholders
involved.
FOR FURTHER INFORMATION CONTACT:
Richard Sanders at (405) 954–7214, or
by e-mail at richard.sanders@dot.gov; or
Max Kieba at (202) 493–0595, or by email at max.kieba@dot.gov.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 73, Number 43 (Tuesday, March 4, 2008)]
[Notices]
[Page 11695]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-4111]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
Office of Hazardous Materials Safety; Notice of Delays in
Processing of Special Permits Applications
AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA),
DOT.
ACTION: List of applications delayed more than 180 days.
-----------------------------------------------------------------------
SUMMARY: In accordance with the requirements of 49 U.S.C. 5117( c),
PHMSA is publishing the following list of special permit applications
that have been in process for 180 days or more. The reason(s) for delay
and the expected completion date for action on each application is
provided in association with each identified application.
FOR FURTHER INFORMATION CONTACT: Delmer F. Billings, Director, Office
of Hazardous Materials Special Permits and Approvals, Pipeline and
Hazardous Materials Safety Administration, U.S. Department of
Transportation, East Building, PHH-30, 1200 New Jersey Avenue,
Southeast, Washington, DC 20590-0001, (202) 366-4535.
Key to ``Reason for Delay''
1. Awaiting additional information from applicant.
2. Extensive public comment under review.
3. Application is technically complex and is of significant impact
or precedent-setting and requires extensive analysis.
4. Staff review delayed by other priority issues or volume of
special permit applications.
Meaning of Application Number Suffixes
N--New application.
M--Modification request.
PM--Party to application with modification request.
Issued in Washington, DC, on February 27, 2008.
Delmer F. Billings,
Director, Office of Hazardous Materials, Special Permits and Approvals.
------------------------------------------------------------------------
Reason for
Application No. Applicant delay of Estimated date
completion
------------------------------------------------------------------------
Modification to Special Permits
------------------------------------------------------------------------
11579-M............... Austin Powder 3, 4 03-31-2008
Company,
Cleveland, OR.
10964-M............... Kidde Aerospace 4 03-31-2008
& Defense,
Wilson, NC.
13173-M............... Dynetek 1 03-31-2008
Industries
Ltd., Calgary
Alberta, Canada.
------------------------------------------------------------------------
New Special Permit Applications
------------------------------------------------------------------------
14385-N............... Kansas City 4 03-31-2008
Southern
Railway
Company, Kansas
City, MO.
14566-N............... Nantong CIMCTank 3 03-31-2008
Equipment Co.
Ltd., Nantong
City.
14576-N............... Structural 1 03-31-2008
Composites
Industries(SCI)
, Pomona, CA.
14572-N............... WEW 3 03-31-2008
Westerwaelder
Eisenwerk,
Weitefeld
Germany.
14549-N............... Greif, Inc., 3,4 03-31-2008
Delaware, OR.
14402-N............... Lincoln 3,4 03-31-2008
Composites,
Lincoln, NE.
------------------------------------------------------------------------
[FR Doc. E8-4111 Filed 3-3-08; 8:45 am]