Environmental Impacts Statements; Notice of Availability, 11112 [E8-3917]
Download as PDF
11112
Federal Register / Vol. 73, No. 41 / Friday, February 29, 2008 / Notices
the State of North Dakota during the
engineering phase and adaptive
management process.
EIS No. 20080012, ERP No. F–NAS–
A12044–00, PROGRAMMATIC—
Constellation Program, Develop the
Flight Systems and Earth-based
Ground Infrastructure for Future
Missions, International Space Station,
The Moon, Mars, and Beyond,
Brevard and Volusia Counties, FL;
Hancock County, MS; Orlean Parish,
LA; Harris County, TX; Madison
County, AL; Cuyahoga and Erie
Counties, OH; Hampton, VA; Santa
Clara County, CA; Dona Ana and
Otero Counties, NM; and Box Elder
and Davis Counties, UT.
Summary: No formal comment letter
was sent to the preparing agency.
EIS No. 20080024, ERP No. F–AFS–
L61218–ID, Frank Church—River of
No Return Wilderness (FC–RONRW),
Noxious Weed Treatments, Updated
Information to Supplement the 1999
Final EIS for FC–RONRW,
Implementation, Bitterroot, Boise, Nez
Perce, Payette, and Salmon-Challis
National Forests, ID.
Summary: No formal comment letter
was sent to the preparing agency.
Dated: February 26, 2008.
Robert W. Hargrove,
Director, NEPA Compliance Division Office
of Federal Activities.
[FR Doc. E8–3937 Filed 2–28–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–6696–4]
rwilkins on PROD1PC63 with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7167 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements Filed 02/18/2008 through
02/22/2008. Pursuant to 40 CFR
1506.9.
EIS No. 20080065, Final EIS, BLM, ID,
Snake River Birds of Prey National
Conservation Area, Resource
Management Plan, Implementation,
Ada, Canyon, Elmore, Owyhee
Counties, ID, Wait Period Ends: 03/
31/2008, Contact: Michael O’Donnell
208–384–3315.
EIS No. 20080066, Final EIS, BLM, ID,
Fire, Fuels and Related Vegetation
Management Direction Plan
Amendment, Upper Snake River
District (The District), Amending 12
VerDate Aug<31>2005
19:22 Feb 28, 2008
Jkt 214001
Existing Land Use Plans, Several
Counties, ID, Wait Period Ends: 03/
31/2008, Contact: Terry Smith 208–
478–6347.
EIS No. 20080067, Draft EIS, FHW, MI,
Detroit River International Crossing
Study, Propose Border Crossing
System between the International
Border Cities of Detroit, Michigan and
Windsor, Ontario, Wayne County, MI,
Comment Period Ends: 04/29/2008,
Contact: David T. Williams 517–702–
1820.
EIS No. 20080068, Draft EIS, NPS, SD,
Minuteman Missile National Historic
Site, General Management Plan,
Implementation, Jackson and
Pennington Counties, SD, Comment
Period Ends: 04/29/2008, Contact:
Mark Herberger 605–433–5552.
EIS No. 20080069, Final EIS, NPS, AZ,
Saguaro National Park General
Management Plan, Implementation,
Rincon Mountain District and Tucson
Mountain District, Pima County, AZ,
Wait Period Ends: 03/31/2008,
Contact: Mary McVeigh 303–969–
2360.
EIS No. 20080070, Draft EIS, AFS, AZ,
Warm Fire Recovery Project, Removal
of Fire-Killed Trees Reforestation,
Fuel Reduction and Road
Reconstruction of Wildland Fire Burn
Portion, Coconino County, AZ,
Comment Period Ends: 04/14/2008,
Contact: Lois Pfeffer 559–359–7023.
EIS No. 20080071, Draft EIS, NOA, 00,
PROGRAMMATIC—Incorporation of
the Revised Washington Shoreline
Management Act Guidelines into the
Federally Approved Washington
Coastal Management Program,
Amendment No. 4 Approval, Coastal
Counties in WA, Comment Period
Ends: 04/14/2008, Contact: Helen Farr
301–713–3155 Ext. 175.
EIS No. 20080072, Draft EIS, IBR, CO,
Southern Delivery System Project,
Water Supply Development,
Execution of up to 40-year Contracts
for Use of Fryingpan-Arkansas Project
Facilities, Special Use Permit, El Paso
County, CO, Comment Period Ends:
04/29/2008, Contact: Kara Lamb 970–
663–3212.
EIS No. 20080073, Final EIS, FHW, IL,
Prairie Parkway Study, Transportation
System Improvement between I–80
and I–88, Widening IL–47 to 4 Lanes
from I–80 to Caton Farm Road,
Funding, U.S. Army COE Section 404,
Grundy, Kendall and Kane Counties,
IL , Wait Period Ends: 03/31/2008,
Contact: Norman R. Stoner 217–492–
4640.
Amended Notices
EIS No. 20010014, Draft EIS, AFS, AK,
Withdrawn—Gravina Island Timber
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Sale, Implementation, Timber Harvest
and Related Activities, KetchikanMisty Fiords Ranger District, Tongass
National Forest, AK, Comment Period
Ends: 06/26/2001, Contact: Susan
Marthaller 907–225–2148. Revision of
FR Published 01/19/2001: Officially
Withdrawn by the Preparing Agency.
EIS No. 20040393, Final EIS, AFS, AK,
Withdrawn—Gravina Island Timber
Sale, Implementation, Timber Harvest
and Related Activities, KetchikanMisty Fiords Ranger District, Tongass
National Forest, AK, Wait Period
Ends: 09/20/2004, Contact: Rob Reeck
907–228–4114. Revision of FR
Published 08/20/2004: Officially
Withdrawn by the Preparing Agency.
Dated: February 26, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office
of Federal Activities.
[FR Doc. E8–3917 Filed 2–28–08; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2008–0142; FRL–8535–5]
Consumer Products Environmental
Partnerships Program—Public Meeting
Environmental Protection
Agency (EPA).
ACTION: Notice of Public Meeting.
AGENCY:
SUMMARY: EPA will convene a public
meeting to discuss opportunities for
industry-government partnerships to
foster greater public awareness of the
environmental attributes of household
and institutional consumer products
and help make consumers aware of
efforts on the part of consumer product
manufacturers to improve the
environmental performance of their
products and production facilities. The
primary purpose of this initial meeting
is to establish a dialog among
government, industry, and public
stakeholders leading to formation of a
Consumer Products Environmental
Partnerships Working Group. Once
formed, the working group will identify
and develop possible partnership
approaches such as product labeling,
consumer education programs,
environmental information Web sites,
product stewardship programs, and
manufacturer recognition programs.
DATES: The meeting will be held from 1
p.m. to 5 p.m. on Monday, March 17
and from 9 a.m. to 5 p.m. on Tuesday,
March 18, 2008.
ADDRESSES: The meeting will be held in
Building C of the EPA campus at 109
E:\FR\FM\29FEN1.SGM
29FEN1
Agencies
[Federal Register Volume 73, Number 41 (Friday, February 29, 2008)]
[Notices]
[Page 11112]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-3917]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6696-4]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7167 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements Filed 02/18/2008
through 02/22/2008. Pursuant to 40 CFR 1506.9.
EIS No. 20080065, Final EIS, BLM, ID, Snake River Birds of Prey
National Conservation Area, Resource Management Plan, Implementation,
Ada, Canyon, Elmore, Owyhee Counties, ID, Wait Period Ends: 03/31/2008,
Contact: Michael O'Donnell 208-384-3315.
EIS No. 20080066, Final EIS, BLM, ID, Fire, Fuels and Related
Vegetation Management Direction Plan Amendment, Upper Snake River
District (The District), Amending 12 Existing Land Use Plans, Several
Counties, ID, Wait Period Ends: 03/31/2008, Contact: Terry Smith 208-
478-6347.
EIS No. 20080067, Draft EIS, FHW, MI, Detroit River International
Crossing Study, Propose Border Crossing System between the
International Border Cities of Detroit, Michigan and Windsor, Ontario,
Wayne County, MI, Comment Period Ends: 04/29/2008, Contact: David T.
Williams 517-702-1820.
EIS No. 20080068, Draft EIS, NPS, SD, Minuteman Missile National
Historic Site, General Management Plan, Implementation, Jackson and
Pennington Counties, SD, Comment Period Ends: 04/29/2008, Contact: Mark
Herberger 605-433-5552.
EIS No. 20080069, Final EIS, NPS, AZ, Saguaro National Park General
Management Plan, Implementation, Rincon Mountain District and Tucson
Mountain District, Pima County, AZ, Wait Period Ends: 03/31/2008,
Contact: Mary McVeigh 303-969-2360.
EIS No. 20080070, Draft EIS, AFS, AZ, Warm Fire Recovery Project,
Removal of Fire-Killed Trees Reforestation, Fuel Reduction and Road
Reconstruction of Wildland Fire Burn Portion, Coconino County, AZ,
Comment Period Ends: 04/14/2008, Contact: Lois Pfeffer 559-359-7023.
EIS No. 20080071, Draft EIS, NOA, 00, PROGRAMMATIC--Incorporation of
the Revised Washington Shoreline Management Act Guidelines into the
Federally Approved Washington Coastal Management Program, Amendment No.
4 Approval, Coastal Counties in WA, Comment Period Ends: 04/14/2008,
Contact: Helen Farr 301-713-3155 Ext. 175.
EIS No. 20080072, Draft EIS, IBR, CO, Southern Delivery System Project,
Water Supply Development, Execution of up to 40-year Contracts for Use
of Fryingpan-Arkansas Project Facilities, Special Use Permit, El Paso
County, CO, Comment Period Ends: 04/29/2008, Contact: Kara Lamb 970-
663-3212.
EIS No. 20080073, Final EIS, FHW, IL, Prairie Parkway Study,
Transportation System Improvement between I-80 and I-88, Widening IL-47
to 4 Lanes from I-80 to Caton Farm Road, Funding, U.S. Army COE Section
404, Grundy, Kendall and Kane Counties, IL , Wait Period Ends: 03/31/
2008, Contact: Norman R. Stoner 217-492-4640.
Amended Notices
EIS No. 20010014, Draft EIS, AFS, AK, Withdrawn--Gravina Island Timber
Sale, Implementation, Timber Harvest and Related Activities, Ketchikan-
Misty Fiords Ranger District, Tongass National Forest, AK, Comment
Period Ends: 06/26/2001, Contact: Susan Marthaller 907-225-2148.
Revision of FR Published 01/19/2001: Officially Withdrawn by the
Preparing Agency.
EIS No. 20040393, Final EIS, AFS, AK, Withdrawn--Gravina Island Timber
Sale, Implementation, Timber Harvest and Related Activities, Ketchikan-
Misty Fiords Ranger District, Tongass National Forest, AK, Wait Period
Ends: 09/20/2004, Contact: Rob Reeck 907-228-4114. Revision of FR
Published 08/20/2004: Officially Withdrawn by the Preparing Agency.
Dated: February 26, 2008.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. E8-3917 Filed 2-28-08; 8:45 am]
BILLING CODE 6560-50-P