Tennessee Gas Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Fitchburg Expansion Project, Request for Comments on Environmental Issues, and Notice of Site Visit, 10761-10763 [E8-3763]
Download as PDF
Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices
station site and possibly alternative sites
that are being considered for the
proposed project. Staff will tour these
proposed project areas by automobile
and on foot. Representatives of
Tennessee will accompany the OEP
staff.
All interested parties may attend the
site visit. Those planning to attend must
provide their own transportation. If you
are interested in attending the site visit,
please meet us at 9:00 AM in the
parking lot of Dunkin’ Donuts, 98 Indian
Rock Road, Windham, New Hampshire
(off of Exit 3 southbound on Rte. 93).
For additional information, please
contact the Commission’s Office of
External Affairs at 1–866–208–FERC
(3372).
Environmental Mailing List
As described above, we may mail the
EA for comment. If you are interested in
receiving an EA for review and/or
comment, please return the
Environmental Mailing List Mailer
(appendix 3). If you do not return the
Environmental Mailing List Mailer, you
will be taken off the mailing list. All
individuals who provide written
comments will remain on our
environmental mailing list for this
project.
rwilkins on PROD1PC63 with NOTICES
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
VerDate Aug<31>2005
18:23 Feb 27, 2008
Jkt 214001
10761
EventCalendar/EventsList.aspx along
with other related information.
on the FERC Internet Web site (https://
www.ferc.gov).
Kimberly D. Bose,
Secretary.
[FR Doc. E8–3756 Filed 2–27–08; 8:45 am]
Summary of the Proposed Project
Tennessee’s Fitchburg Expansion
Project would increase the size of a
portion of its Fitchburg Lateral and
install some minor facilities in order to
provide 12,300 dekatherms per day of
firm transportation service for the
Massachusetts Development Financial
Agency. To accomplish this, Tennessee
proposes to:
• Replace approximately 5.15 miles
of 6-inch-diameter pipeline with 12inch-diameter pipeline on Tennessee’s
Line 268–100 (Fitchburg Lateral) in
Worcester County, Massachusetts;
• Install a pig 1 launcher at the
existing mainline valve at the beginning
of the Fitchburg Lateral in Framingham,
Massachusetts; and
• Install a pig receiver at the existing
Unitil Meter Station at the terminus of
the Fitchburg Lateral (milepost 5.13) in
Lunenburg, Massachusetts.
The general location of the proposed
facilities is shown in appendix 1.2
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–63–000]
Tennessee Gas Pipeline Company;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Fitchburg Expansion
Project, Request for Comments on
Environmental Issues, and Notice of
Site Visit
February 22, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the potential environmental
impacts of the Fitchburg Expansion
Project involving construction and
operation of natural gas pipeline
facilities by Tennessee Gas Pipeline
Company (Tennessee) in Worcester and
Middlesex Counties, Massachusetts. The
EA will be used by the Commission in
its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on March 24, 2008. Details on how
to submit comments are provided in the
Public Participation section of this
notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
Land Requirements for Construction
Tennessee proposes to utilize a 70-to
80-foot-wide construction right-of-way.
This includes the existing permanent
right-of-way that varies between 20 and
30 feet, which would continue to be
maintained after construction. A total of
55.19 acres would be affected during
construction and 15.95 acres would be
affected during operation. The pig
launcher and receiver would be
constructed adjacent to existing
Tennessee aboveground structures.
The EA Process
We 3 are preparing this EA to comply
with the National Environmental Policy
Act of 1969 (NEPA), which requires the
Commission to take into account the
environmental impact that could result
if it authorizes Tennessee’s proposal. By
this notice, we are also asking federal,
state, and local agencies with
1 A pig is an internal tool that can be used to
clean and/or inspect a pipeline for damage or
corrosion. A pig launcher/receiver is an
aboveground facility where pigs are inserted into
and or retrieved from the pipeline.
2 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s Web
site (https://www.ferc.gov) at the ‘‘eLibrary’’ link or
from the Commission’s Public Reference Room, 888
First Street, NE., Washington, DC 20426, or call
(202) 502–8371. For instructions on connecting to
eLibrary, refer to the ‘‘Additional Information’’
section of this notice. Copies of the appendices
were sent to all those receiving this notice in the
mail. Requests for detailed maps of the proposed
facilities should be made directly to Tennessee.
3 ’’We’’, ‘‘us’’, and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
E:\FR\FM\28FEN1.SGM
28FEN1
10762
Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices
rwilkins on PROD1PC63 with NOTICES
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA. Agencies that
would like to request cooperating status
should follow the instructions for filing
comments provided below.
NEPA also requires the FERC to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on
important environmental issues. By this
Notice, we are requesting public
comments on the scope of the issues to
address in the EA. All comments
received are considered during the
preparation of the EA.
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils.
• Land use and visual quality.
• Cultural resources.
• Vegetation and wildlife (including
threatened and endangered species).
• Air quality and noise.
• Reliability and safety.
We will also evaluate possible
alternatives to the proposed project or
portions of the project, where necessary,
and make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Our independent analysis of the
issues will be presented in the EA.
Depending on the comments received
during the scoping process, the EA may
be published and mailed to federal,
state, and local agencies; public interest
groups; interested individuals; affected
landowners; local libraries and
newspapers; and the Commission’s
official service list for this proceeding.
A comment period will be allotted for
review if the EA is published. We will
consider all comments on the EA before
we make our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal including
alternative pipeline routes, and
measures to avoid or lessen
VerDate Aug<31>2005
18:23 Feb 27, 2008
Jkt 214001
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberley D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426.
• Label one copy of the comments for
the attention of Gas Branch 1, PJ–11.1;
• Reference Docket No. CP08–63–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before March 24, 2008.
The Commission encourages
electronic filing of comments. See Title
18 of the Code of Federal Regulations,
Part 385.2001(a)(1)(iii) and the
instructions on the Commission’s
Internet Web site at https://www.ferc.gov
under the ‘‘eFiling’’ link and the link to
the User’s Guide. Prepare your
submission in the same manner as you
would if filing on paper and save it to
a file on your hard drive. Before you can
file comments you will need to create an
account by clicking on ‘‘Login to File’’
and then ‘‘New User Account.’’ You will
be asked to select the type of filing you
are making. This filing is considered a
‘‘Comment on Filing.’’
Becoming an Intervenor
In addition to involvement in the
scoping process, you may want to
become an official party to the
proceeding known as an ‘‘intervenor.’’
Intervenors play a more formal role in
the Commission’s process. Among other
things, intervenors have the right to
receive copies of case-related
Commission documents and filings by
other intervenors. Likewise, each
intervenor must send one electronic
copy (using the Commission’s eFiling
system) or 14 paper copies of its filings
to the Secretary of the Commission and
must send a copy of its filings to all
other parties on the Commission’s
service list for this proceeding. If you
want to become an intervenor, you must
file a motion to intervene according to
Rule 214 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.214) (see appendix 2).4 Only
intervenors have the right to seek
rehearing of the Commission’s decision.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
4 Interventions may also be filed electronically via
the Internet in lieu of paper. See the previous
discussion on filing comments electronically.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Site Visit
On April 1, 2008, the Office of Energy
Projects’ (OEP) staff will conduct a precertification site visit of the proposed
Fitchburg Expansion Project. We will
view Tennessee’s proposed pipeline
route, route variations, and aboveground
facilities that are being considered for
the proposed project. Staff will tour the
proposed project area by automobile
and on foot. Representatives of
Tennessee will accompany the OEP
staff.
All interested parties may attend the
site visit. Those planning to attend must
provide their own transportation. If you
are interested in attending the site visit,
please meet us at 9 a.m. in the parking
lot of the Target at 86 Orchard Hill Park
Drive, Leominster, MA.
For additional information, please
contact the Commission’s Office of
External Affairs at 1–866–208–FERC
(3372).
Environmental Mailing List
As described above, we may mail the
EA for comment. If you are interested in
receiving an EA for review and/or
comment, please return the
Environmental Mailing List Mailer
(appendix 3). If you do not return the
Environmental Mailing List Mailer, you
will be taken off the mailing list. All
individuals who provide written
comments will remain on our
environmental mailing list for this
project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208-FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
E:\FR\FM\28FEN1.SGM
28FEN1
Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–3763 Filed 2–27–08; 8:45 am]
BILLING CODE 6717–01–P
Kimberly D. Bose,
Secretary.
[FR Doc. E8–3727 Filed 2–27–08; 8:45 am]
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket Nos. PR04–6–005; PR04–6–006;
PR07–5–002; PR07–5–003]
DEPARTMENT OF ENERGY
Cranberry Pipeline Corporation; Notice
of Compliance Filings
rwilkins on PROD1PC63 with NOTICES
February 21, 2008.
Take notice that on February 13, 2008,
Cranberry Pipeline Corporation
(Cranberry) made two filings to comply
with the letter order issued on
December 14, 2007, (December 14, 2007
order).1 In Docket Nos. PR04–7–005 and
PR07–5–002, Cranberry filed a Report of
Refunds in compliance with the
Commission’s December 14, 2007 order,
and in Docket Nos. PR04–7–006 and
PR07–5–003, Cranberry filed a revised
Statement of Operating Conditions in
compliance with the Commission’s
December 14, 2007 order.
Any person desiring to protest this
filing must file in accordance with Rule
211 of the Commission’s Rules of
Practice and Procedure (18 CFR
385.211). Protests to this filing will be
considered by the Commission in
determining the appropriate action to be
taken, but will not serve to make
protestants parties to the proceeding.
Such protests must be filed on or before
the date as indicated below. Anyone
filing a protest must serve a copy of that
document on all the parties to the
proceeding.
The Commission encourages
electronic submission of protests in lieu
of paper using the ‘‘eFiling’’ link at
https://www.ferc.gov. Persons unable to
file electronically should submit an
original and 14 copies of the protest to
the Federal Energy Regulatory
1 Letter Order issued December 14, 2007, in
Docket Nos. PR04–6–002, PR04–6–003, PR04–6–
004, PR07–5–000 and PR07–5–001, (2007).
VerDate Aug<31>2005
18:23 Feb 27, 2008
Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
February 26, 2008.
Jkt 214001
Federal Energy Regulatory
Commission
[Project No 2713–073]
Erie Boulevard Hydropower, L.P.;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, Commencement of
Licensing Proceeding, Scoping
Meetings, Solicitation of Comments on
the Pad and Scoping Document, and
Identification of Issues and Associated
Study Requests
February 22, 2008.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Licensing
Proceeding.
b. Project No.: 2713–073.
c. Date Filed: December 28, 2007.
d. Submitted By: Erie Boulevard
Hydropower, L.P.
e. Name of Project: Oswegatchie
Hydroelectric Project.
f. Location: On the Oswegatchie River,
within St. Lawrence County New York.
No federal lands are involved.
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact:
Thomas Skutnik, Erie Boulevard
Hydropower, L.P., 225 Greenfield
Parkway, Suite 201, Liverpool, New
York 13088, (315) 413–2789.
i. FERC Contact: Michael Spencer,
michael.spencer@ferc.gov, (202) 502–
6093.
j. We are asking federal, State, local,
and tribal agencies with jurisdiction
and/or special expertise with respect to
environmental issues to cooperate with
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
10763
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in paragraph o
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402; and (b) the State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Erie Boulevard Hydropower, L.P. as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. Erie Boulevard Hydropower, L.P.
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations. The
Commission issued the Scoping
Document for the proposed Thomson
Project on February 22, 2008.
n. A copy of the PAD and the scoping
document are available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
o. With this notice, we are setting the
effective date for the commencement of
licensing proceeding as February 26,
2008, and soliciting comments on the
PAD and the scoping document, as well
as study requests. All comments on the
PAD and the scoping document, and
E:\FR\FM\28FEN1.SGM
28FEN1
Agencies
[Federal Register Volume 73, Number 40 (Thursday, February 28, 2008)]
[Notices]
[Pages 10761-10763]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-3763]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-63-000]
Tennessee Gas Pipeline Company; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Fitchburg Expansion Project,
Request for Comments on Environmental Issues, and Notice of Site Visit
February 22, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the potential environmental impacts of the Fitchburg Expansion
Project involving construction and operation of natural gas pipeline
facilities by Tennessee Gas Pipeline Company (Tennessee) in Worcester
and Middlesex Counties, Massachusetts. The EA will be used by the
Commission in its decision-making process to determine whether the
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help determine which issues
need to be evaluated in the EA. Please note that the scoping period
will close on March 24, 2008. Details on how to submit comments are
provided in the Public Participation section of this notice.
This notice is being sent to affected landowners; federal, state,
and local government agencies; elected officials; Native American
tribes; other interested parties; and local libraries and newspapers.
State and local government representatives are asked to notify their
constituents of this proposed project and to encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses a number
of typically asked questions, including the use of eminent domain and
how to participate in the Commission's proceedings. It is available for
viewing on the FERC Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
Tennessee's Fitchburg Expansion Project would increase the size of
a portion of its Fitchburg Lateral and install some minor facilities in
order to provide 12,300 dekatherms per day of firm transportation
service for the Massachusetts Development Financial Agency. To
accomplish this, Tennessee proposes to:
Replace approximately 5.15 miles of 6-inch-diameter
pipeline with 12-inch-diameter pipeline on Tennessee's Line 268-100
(Fitchburg Lateral) in Worcester County, Massachusetts;
Install a pig \1\ launcher at the existing mainline valve
at the beginning of the Fitchburg Lateral in Framingham, Massachusetts;
and
---------------------------------------------------------------------------
\1\ A pig is an internal tool that can be used to clean and/or
inspect a pipeline for damage or corrosion. A pig launcher/receiver
is an aboveground facility where pigs are inserted into and or
retrieved from the pipeline.
---------------------------------------------------------------------------
Install a pig receiver at the existing Unitil Meter
Station at the terminus of the Fitchburg Lateral (milepost 5.13) in
Lunenburg, Massachusetts.
The general location of the proposed facilities is shown in
appendix 1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's Web site (https://www.ferc.gov) at the
``eLibrary'' link or from the Commission's Public Reference Room,
888 First Street, NE., Washington, DC 20426, or call (202) 502-8371.
For instructions on connecting to eLibrary, refer to the
``Additional Information'' section of this notice. Copies of the
appendices were sent to all those receiving this notice in the mail.
Requests for detailed maps of the proposed facilities should be made
directly to Tennessee.
---------------------------------------------------------------------------
Land Requirements for Construction
Tennessee proposes to utilize a 70-to 80-foot-wide construction
right-of-way. This includes the existing permanent right-of-way that
varies between 20 and 30 feet, which would continue to be maintained
after construction. A total of 55.19 acres would be affected during
construction and 15.95 acres would be affected during operation. The
pig launcher and receiver would be constructed adjacent to existing
Tennessee aboveground structures.
The EA Process
We \3\ are preparing this EA to comply with the National
Environmental Policy Act of 1969 (NEPA), which requires the Commission
to take into account the environmental impact that could result if it
authorizes Tennessee's proposal. By this notice, we are also asking
federal, state, and local agencies with
[[Page 10762]]
jurisdiction and/or special expertise with respect to environmental
issues to formally cooperate with us in the preparation of the EA.
Agencies that would like to request cooperating status should follow
the instructions for filing comments provided below.
---------------------------------------------------------------------------
\3\ ''We'', ``us'', and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
NEPA also requires the FERC to discover and address concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on important environmental issues. By this Notice,
we are requesting public comments on the scope of the issues to address
in the EA. All comments received are considered during the preparation
of the EA.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils.
Land use and visual quality.
Cultural resources.
Vegetation and wildlife (including threatened and
endangered species).
Air quality and noise.
Reliability and safety.
We will also evaluate possible alternatives to the proposed project
or portions of the project, where necessary, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA.
Depending on the comments received during the scoping process, the EA
may be published and mailed to federal, state, and local agencies;
public interest groups; interested individuals; affected landowners;
local libraries and newspapers; and the Commission's official service
list for this proceeding. A comment period will be allotted for review
if the EA is published. We will consider all comments on the EA before
we make our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the Public Participation section below.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal including alternative pipeline
routes, and measures to avoid or lessen environmental impact. The more
specific your comments, the more useful they will be. Please carefully
follow these instructions to ensure that your comments are received in
time and properly recorded:
Send an original and two copies of your letter to:
Kimberley D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426.
Label one copy of the comments for the attention of Gas
Branch 1, PJ-11.1;
Reference Docket No. CP08-63-000; and
Mail your comments so that they will be received in
Washington, DC on or before March 24, 2008.
The Commission encourages electronic filing of comments. See Title
18 of the Code of Federal Regulations, Part 385.2001(a)(1)(iii) and the
instructions on the Commission's Internet Web site at https://
www.ferc.gov under the ``eFiling'' link and the link to the User's
Guide. Prepare your submission in the same manner as you would if
filing on paper and save it to a file on your hard drive. Before you
can file comments you will need to create an account by clicking on
``Login to File'' and then ``New User Account.'' You will be asked to
select the type of filing you are making. This filing is considered a
``Comment on Filing.''
Becoming an Intervenor
In addition to involvement in the scoping process, you may want to
become an official party to the proceeding known as an ``intervenor.''
Intervenors play a more formal role in the Commission's process. Among
other things, intervenors have the right to receive copies of case-
related Commission documents and filings by other intervenors.
Likewise, each intervenor must send one electronic copy (using the
Commission's eFiling system) or 14 paper copies of its filings to the
Secretary of the Commission and must send a copy of its filings to all
other parties on the Commission's service list for this proceeding. If
you want to become an intervenor, you must file a motion to intervene
according to Rule 214 of the Commission's Rules of Practice and
Procedure (18 CFR 385.214) (see appendix 2).\4\ Only intervenors have
the right to seek rehearing of the Commission's decision.
---------------------------------------------------------------------------
\4\ Interventions may also be filed electronically via the
Internet in lieu of paper. See the previous discussion on filing
comments electronically.
---------------------------------------------------------------------------
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Site Visit
On April 1, 2008, the Office of Energy Projects' (OEP) staff will
conduct a pre-certification site visit of the proposed Fitchburg
Expansion Project. We will view Tennessee's proposed pipeline route,
route variations, and aboveground facilities that are being considered
for the proposed project. Staff will tour the proposed project area by
automobile and on foot. Representatives of Tennessee will accompany the
OEP staff.
All interested parties may attend the site visit. Those planning to
attend must provide their own transportation. If you are interested in
attending the site visit, please meet us at 9 a.m. in the parking lot
of the Target at 86 Orchard Hill Park Drive, Leominster, MA.
For additional information, please contact the Commission's Office
of External Affairs at 1-866-208-FERC (3372).
Environmental Mailing List
As described above, we may mail the EA for comment. If you are
interested in receiving an EA for review and/or comment, please return
the Environmental Mailing List Mailer (appendix 3). If you do not
return the Environmental Mailing List Mailer, you will be taken off the
mailing list. All individuals who provide written comments will remain
on our environmental mailing list for this project.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary''
link. Click on the eLibrary link, then on ``General Search'' and enter
the docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in
[[Page 10763]]
specific dockets. This can reduce the amount of time you spend
researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-3763 Filed 2-27-08; 8:45 am]
BILLING CODE 6717-01-P