Southeast Supply Header, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Amendment Hi Field Lateral Project and Request for Comments on Environmental Issues, 10758-10759 [E8-3728]

Download as PDF 10758 Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices Summary of the Proposed Project DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP07–44–002; CP07–45–001] Southeast Supply Header, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Amendment Hi Field Lateral Project and Request for Comments on Environmental Issues rwilkins on PROD1PC63 with NOTICES February 21, 2008. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the amendment Southeast Supply Header (SESH) is proposing. The requested amendment would approve the proposed Hi Fields Lateral Project, consisting of an 11-mile 16-inch outside diameter natural gas lateral pipeline between the SESH mainline pipeline in Mobile County, Alabama and the Daniel Electric Generating Plant in Jackson County, Mississippi. Additional equipments would be installed as part of the proposed amendment. The EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help determine which issues need to be evaluated in the EA. Please note that the scoping period will close on March 24, 2008. Details on how to submit comments are provided in the Public Participation section of this notice. This notice is being sent to affected landowners; federal, state, and local government agencies; elected officials; Native American tribes; other interested parties; and local libraries and newspapers. State and local government representatives are asked to notify their constituents of this proposed project and to encourage them to comment on their areas of concern. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is available for viewing on the FERC Internet Web site (https:// www.ferc.gov). VerDate Aug<31>2005 18:23 Feb 27, 2008 Jkt 214001 SESH proposes to construct approximately 11 miles of new 16-inch outside diameter natural gas pipeline that would be installed from the SESH mainline pipeline in Mobile County, Alabama, extending directly in a southwesterly direction to Southern Company’s Daniel Electric Generating Plan facilities in Jackson County, Mississippi. Description of the proposed facilities will include the following: • Approximately 11 miles of new 16inch outside diameter natural gas pipeline; • installing a new gas chromatograph building and satellite communications equipment within Southern Company existing Plant Daniel meter and regulation (M&R) station, which is located within the Daniel Electric Generating Plant; and • installing two mainline valves on either end of the Hi Fields lateral. All project activities would be contained in Mobile County Alabama, and Jackson County Mississippi. Construction of the proposed project would affect approximately 177 acres of land. The cost for constructing the proposed project would be approximately $19.4 million. The general location of the proposed facilities is shown in Appendix 1.1 The EA Process We 2 are preparing this EA to comply with the National Environmental Policy Act (NEPA) which requires the Commission to take into account the environmental impact that could result if it authorizes SESH’s proposal. By this notice, we are also asking federal, state, and local agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Additional agencies that would like to request cooperating agency status should follow the instructions for filing comments 1 The appendices referenced in this notice are not being printed in the Federal Register. Copies of all appendices are available on the Commission’s Web site at the ‘‘eLibrary’’ link or from the Commission’s Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502–8371. For instructions on connecting to eLibrary refer to the ‘‘Additional Information’’ section of this notice. Copies of the appendices were sent to all those receiving this notice in the mail. Requests for detailed maps of the proposed facilities should be made directly to El Paso. 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the environmental staff of the FERC’s Office of Energy Projects. PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 provided under the Public Participation section of this notice. NEPA also requires the FERC to discover and address concerns the public may have about proposals. This process is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this Notice of Intent, we are requesting public comments on the scope of the issues to address in the EA. All comments received are considered during the preparation of the EA. The EA will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings: • Geology and soils • Land use • Water resources, fisheries, and wetlands • Cultural resources • Vegetation and wildlife • Air quality and noise • Endangered and threatened species We will also evaluate possible alternatives to the proposed project or portions of the project, where necessary, and make recommendations on how to lessen or avoid impacts on the various resource areas. Our independent analysis of the issues will be in the EA. Depending on the comments received during the scoping process, the EA may be published and mailed to federal, state, and local agencies, public interest groups, interested individuals, affected landowners, newspapers, libraries, and the Commission’s official service list for this proceeding. A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the Public Participation section below. Public Participation You can make a difference by providing us with your specific comments or concerns about the project. By becoming a commentor, your concerns will be addressed in the EA and considered by the Commission. You should focus on the potential environmental effects of the proposal, alternatives to the proposal including alternative compressor station sites, and measures to avoid or lessen environmental impact. The more specific your comments, the more useful they will be. Please carefully follow E:\FR\FM\28FEN1.SGM 28FEN1 Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices rwilkins on PROD1PC63 with NOTICES these instructions to ensure that your comments are received in time and properly recorded: • Send an original and two copies of your letter to: Kimberley D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First St., NE., Room 1A, Washington, DC 20426; • Label one copy of the comments for the attention of Gas Branch 2, PJ–11.2; • Reference Docket No. CP07–44–002 & CP07–45–001; and • Mail your comments so that they will be received in Washington, DC on or before March 24, 2008. The Commission encourages electronic filing of comments. See 18 Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on the Commission’s Internet Web site at https://www.ferc.gov under the ‘‘eFiling’’ link and the link to the User’s Guide. Prepare your submission in the same manner as you would if filing on paper and save it to a file on your hard drive. Before you can file comments you will need to create an account by clicking on ‘‘Login to File’’ and then ‘‘New User Account.’’ You will be asked to select the type of filing you are making. This filing is considered a ‘‘Comment on Filing.’’ We may mail the EA for public comment. If you are interested in receiving it, please return the Information Request (Appendix 2). If you do not return the Information Request, you will be taken off the mailing list. Becoming an Intervenor In addition to involvement in the EA scoping process, you may want to become an official party to the proceeding, or ‘‘intervenor’’. To become an intervenor you must file a motion to intervene according to Rule 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.214). Intervenors have the right to seek rehearing of the Commission’s decision. Motions to Intervene should be electronically submitted using the Commission’s eFiling system at https://www.ferc.gov. Persons without Internet access should send an original and 14 copies of their motion to the Secretary of the Commission at the address indicated previously. Persons filing Motions to Intervene on or before the comment deadline indicated above must send a copy of the motion to the Applicant. All filings, including late interventions, submitted after the comment deadline must be served on the Applicant and all other intervenors identified on the Commission’s service list for this proceeding. Persons on the service list with e-mail addresses may be served VerDate Aug<31>2005 18:23 Feb 27, 2008 Jkt 214001 electronically; others must be served a hard copy of the filing. Affected landowners and parties with environmental concerns may be granted intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which would not be adequately represented by any other parties. You do not need intervenor status to have your environmental comments considered. Environmental Mailing List An effort is being made to send this notice to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project. This includes all landowners who own homes within distances defined in the Commission’s regulations of certain aboveground facilities. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at 1–866–208–FERC or on the FERC Internet Web site (https://www.ferc.gov) using the ‘‘eLibrary’’ link. Click on the eLibrary link, then on ‘‘General Search’’ and enter the docket number excluding the last three digits in the Docket Number field. Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission now offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries and direct links to the documents. Go to https:// www.ferc.gov/esubscribenow.htm. Finally, public meetings or site visits will be posted on the Commission’s calendar located at https://www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Kimberly D. Bose, Secretary. [FR Doc. E8–3728 Filed 2–27–08; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 10759 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP08–65–000] Tennessee Gas Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Proposed Concord Lateral Expansion Project, Request for Comments on Environmental Issues, and Notice of Site Visit February 22, 2008. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the potential environmental impacts of the Concord Lateral Expansion Project involving construction and operation of natural gas pipeline facilities by Tennessee Gas Pipeline Company (Tennessee) in Hillsborough and Merrimack Counties, New Hampshire. The EA will be used by the Commission in its decisionmaking process to determine whether the project is in the public convenience and necessity. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help determine which issues need to be evaluated in the EA. Please note that the scoping period will close on March 24, 2008. Details on how to submit comments are provided in the Public Participation section of this notice. This notice is being sent to affected landowners; federal, state, and local government agencies; elected officials; Native American tribes; other interested parties; and local libraries and newspapers. State and local government representatives are asked to notify their constituents of this proposed project and to encourage them to comment on their areas of concern. A fact sheet prepared by the FERC entitled ‘‘An Interstate Natural Gas Facility On My Land? What Do I Need To Know?’’ addresses a number of typically asked questions, including the use of eminent domain and how to participate in the Commission’s proceedings. It is available for viewing on the FERC Internet Web site (https:// www.ferc.gov). Summary of the Proposed Project Tennessee’s Concord Lateral Expansion Project would provide 30,000 dekatherms per day of incremental transportation capacity to serve Energy North Natural Gas, Inc. d/b/a KeySpan E:\FR\FM\28FEN1.SGM 28FEN1

Agencies

[Federal Register Volume 73, Number 40 (Thursday, February 28, 2008)]
[Notices]
[Pages 10758-10759]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-3728]



[[Page 10758]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket Nos. CP07-44-002; CP07-45-001]


Southeast Supply Header, LLC; Notice of Intent To Prepare an 
Environmental Assessment for the Proposed Amendment Hi Field Lateral 
Project and Request for Comments on Environmental Issues

February 21, 2008.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment (EA) that will 
discuss the environmental impacts of the amendment Southeast Supply 
Header (SESH) is proposing. The requested amendment would approve the 
proposed Hi Fields Lateral Project, consisting of an 11-mile 16-inch 
outside diameter natural gas lateral pipeline between the SESH mainline 
pipeline in Mobile County, Alabama and the Daniel Electric Generating 
Plant in Jackson County, Mississippi. Additional equipments would be 
installed as part of the proposed amendment. The EA will be used by the 
Commission in its decision-making process to determine whether the 
project is in the public convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help determine which issues 
need to be evaluated in the EA. Please note that the scoping period 
will close on March 24, 2008. Details on how to submit comments are 
provided in the Public Participation section of this notice.
    This notice is being sent to affected landowners; federal, state, 
and local government agencies; elected officials; Native American 
tribes; other interested parties; and local libraries and newspapers. 
State and local government representatives are asked to notify their 
constituents of this proposed project and to encourage them to comment 
on their areas of concern.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' addresses a number 
of typically asked questions, including the use of eminent domain and 
how to participate in the Commission's proceedings. It is available for 
viewing on the FERC Internet Web site (https://www.ferc.gov).

Summary of the Proposed Project

    SESH proposes to construct approximately 11 miles of new 16-inch 
outside diameter natural gas pipeline that would be installed from the 
SESH mainline pipeline in Mobile County, Alabama, extending directly in 
a southwesterly direction to Southern Company's Daniel Electric 
Generating Plan facilities in Jackson County, Mississippi. Description 
of the proposed facilities will include the following:
     Approximately 11 miles of new 16-inch outside diameter 
natural gas pipeline;
     installing a new gas chromatograph building and satellite 
communications equipment within Southern Company existing Plant Daniel 
meter and regulation (M&R) station, which is located within the Daniel 
Electric Generating Plant; and
     installing two mainline valves on either end of the Hi 
Fields lateral.
    All project activities would be contained in Mobile County Alabama, 
and Jackson County Mississippi. Construction of the proposed project 
would affect approximately 177 acres of land. The cost for constructing 
the proposed project would be approximately $19.4 million.
    The general location of the proposed facilities is shown in 
Appendix 1.\1\
---------------------------------------------------------------------------

    \1\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of all appendices are 
available on the Commission's Web site at the ``eLibrary'' link or 
from the Commission's Public Reference Room, 888 First Street, NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary refer to the ``Additional Information'' 
section of this notice. Copies of the appendices were sent to all 
those receiving this notice in the mail. Requests for detailed maps 
of the proposed facilities should be made directly to El Paso.
---------------------------------------------------------------------------

The EA Process

    We \2\ are preparing this EA to comply with the National 
Environmental Policy Act (NEPA) which requires the Commission to take 
into account the environmental impact that could result if it 
authorizes SESH's proposal. By this notice, we are also asking federal, 
state, and local agencies with jurisdiction and/or special expertise 
with respect to environmental issues to formally cooperate with us in 
the preparation of the EA. These agencies may choose to participate 
once they have evaluated the proposal relative to their 
responsibilities. Additional agencies that would like to request 
cooperating agency status should follow the instructions for filing 
comments provided under the Public Participation section of this 
notice.
---------------------------------------------------------------------------

    \2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff 
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------

    NEPA also requires the FERC to discover and address concerns the 
public may have about proposals. This process is referred to as 
``scoping.'' The main goal of the scoping process is to focus the 
analysis in the EA on the important environmental issues. By this 
Notice of Intent, we are requesting public comments on the scope of the 
issues to address in the EA. All comments received are considered 
during the preparation of the EA.
    The EA will discuss impacts that could occur as a result of the 
construction and operation of the proposed project under these general 
headings:

 Geology and soils
 Land use
 Water resources, fisheries, and wetlands
 Cultural resources
 Vegetation and wildlife
 Air quality and noise
 Endangered and threatened species

    We will also evaluate possible alternatives to the proposed project 
or portions of the project, where necessary, and make recommendations 
on how to lessen or avoid impacts on the various resource areas.
    Our independent analysis of the issues will be in the EA. Depending 
on the comments received during the scoping process, the EA may be 
published and mailed to federal, state, and local agencies, public 
interest groups, interested individuals, affected landowners, 
newspapers, libraries, and the Commission's official service list for 
this proceeding. A comment period will be allotted for review if the EA 
is published. We will consider all comments on the EA before we make 
our recommendations to the Commission.
    To ensure your comments are considered, please carefully follow the 
instructions in the Public Participation section below.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. By becoming a commentor, your 
concerns will be addressed in the EA and considered by the Commission. 
You should focus on the potential environmental effects of the 
proposal, alternatives to the proposal including alternative compressor 
station sites, and measures to avoid or lessen environmental impact. 
The more specific your comments, the more useful they will be. Please 
carefully follow

[[Page 10759]]

these instructions to ensure that your comments are received in time 
and properly recorded:
     Send an original and two copies of your letter to: 
Kimberley D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First St., NE., Room 1A, Washington, DC 20426;
     Label one copy of the comments for the attention of Gas 
Branch 2, PJ-11.2;
     Reference Docket No. CP07-44-002 & CP07-45-001; and
     Mail your comments so that they will be received in 
Washington, DC on or before March 24, 2008.
    The Commission encourages electronic filing of comments. See 18 
Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on 
the Commission's Internet Web site at https://www.ferc.gov under the 
``eFiling'' link and the link to the User's Guide. Prepare your 
submission in the same manner as you would if filing on paper and save 
it to a file on your hard drive. Before you can file comments you will 
need to create an account by clicking on ``Login to File'' and then 
``New User Account.'' You will be asked to select the type of filing 
you are making. This filing is considered a ``Comment on Filing.''
    We may mail the EA for public comment. If you are interested in 
receiving it, please return the Information Request (Appendix 2). If 
you do not return the Information Request, you will be taken off the 
mailing list.

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an official party to the proceeding, or ``intervenor''. To 
become an intervenor you must file a motion to intervene according to 
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 
385.214). Intervenors have the right to seek rehearing of the 
Commission's decision. Motions to Intervene should be electronically 
submitted using the Commission's eFiling system at https://www.ferc.gov. 
Persons without Internet access should send an original and 14 copies 
of their motion to the Secretary of the Commission at the address 
indicated previously. Persons filing Motions to Intervene on or before 
the comment deadline indicated above must send a copy of the motion to 
the Applicant. All filings, including late interventions, submitted 
after the comment deadline must be served on the Applicant and all 
other intervenors identified on the Commission's service list for this 
proceeding. Persons on the service list with e-mail addresses may be 
served electronically; others must be served a hard copy of the filing.
    Affected landowners and parties with environmental concerns may be 
granted intervenor status upon showing good cause by stating that they 
have a clear and direct interest in this proceeding which would not be 
adequately represented by any other parties. You do not need intervenor 
status to have your environmental comments considered.

Environmental Mailing List

    An effort is being made to send this notice to all individuals, 
organizations, and government entities interested in and/or potentially 
affected by the proposed project. This includes all landowners who own 
homes within distances defined in the Commission's regulations of 
certain aboveground facilities.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at 1-866-208-FERC or on the 
FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary'' 
link. Click on the eLibrary link, then on ``General Search'' and enter 
the docket number excluding the last three digits in the Docket Number 
field. Be sure you have selected an appropriate date range. For 
assistance, please contact FERC Online Support at 
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the 
texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries and direct links to 
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.

 Kimberly D. Bose,
Secretary.
 [FR Doc. E8-3728 Filed 2-27-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.