Southeast Supply Header, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Amendment Hi Field Lateral Project and Request for Comments on Environmental Issues, 10758-10759 [E8-3728]
Download as PDF
10758
Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices
Summary of the Proposed Project
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP07–44–002; CP07–45–001]
Southeast Supply Header, LLC; Notice
of Intent To Prepare an Environmental
Assessment for the Proposed
Amendment Hi Field Lateral Project
and Request for Comments on
Environmental Issues
rwilkins on PROD1PC63 with NOTICES
February 21, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the amendment Southeast Supply
Header (SESH) is proposing. The
requested amendment would approve
the proposed Hi Fields Lateral Project,
consisting of an 11-mile 16-inch outside
diameter natural gas lateral pipeline
between the SESH mainline pipeline in
Mobile County, Alabama and the Daniel
Electric Generating Plant in Jackson
County, Mississippi. Additional
equipments would be installed as part
of the proposed amendment. The EA
will be used by the Commission in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on March 24, 2008. Details on how
to submit comments are provided in the
Public Participation section of this
notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
VerDate Aug<31>2005
18:23 Feb 27, 2008
Jkt 214001
SESH proposes to construct
approximately 11 miles of new 16-inch
outside diameter natural gas pipeline
that would be installed from the SESH
mainline pipeline in Mobile County,
Alabama, extending directly in a
southwesterly direction to Southern
Company’s Daniel Electric Generating
Plan facilities in Jackson County,
Mississippi. Description of the proposed
facilities will include the following:
• Approximately 11 miles of new 16inch outside diameter natural gas
pipeline;
• installing a new gas chromatograph
building and satellite communications
equipment within Southern Company
existing Plant Daniel meter and
regulation (M&R) station, which is
located within the Daniel Electric
Generating Plant; and
• installing two mainline valves on
either end of the Hi Fields lateral.
All project activities would be
contained in Mobile County Alabama,
and Jackson County Mississippi.
Construction of the proposed project
would affect approximately 177 acres of
land. The cost for constructing the
proposed project would be
approximately $19.4 million.
The general location of the proposed
facilities is shown in Appendix 1.1
The EA Process
We 2 are preparing this EA to comply
with the National Environmental Policy
Act (NEPA) which requires the
Commission to take into account the
environmental impact that could result
if it authorizes SESH’s proposal. By this
notice, we are also asking federal, state,
and local agencies with jurisdiction
and/or special expertise with respect to
environmental issues to formally
cooperate with us in the preparation of
the EA. These agencies may choose to
participate once they have evaluated the
proposal relative to their
responsibilities. Additional agencies
that would like to request cooperating
agency status should follow the
instructions for filing comments
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s Web
site at the ‘‘eLibrary’’ link or from the Commission’s
Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502–8371. For
instructions on connecting to eLibrary refer to the
‘‘Additional Information’’ section of this notice.
Copies of the appendices were sent to all those
receiving this notice in the mail. Requests for
detailed maps of the proposed facilities should be
made directly to El Paso.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
provided under the Public Participation
section of this notice.
NEPA also requires the FERC to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, we are requesting
public comments on the scope of the
issues to address in the EA. All
comments received are considered
during the preparation of the EA.
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils
• Land use
• Water resources, fisheries, and
wetlands
• Cultural resources
• Vegetation and wildlife
• Air quality and noise
• Endangered and threatened species
We will also evaluate possible
alternatives to the proposed project or
portions of the project, where necessary,
and make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal including
alternative compressor station sites, and
measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
E:\FR\FM\28FEN1.SGM
28FEN1
Federal Register / Vol. 73, No. 40 / Thursday, February 28, 2008 / Notices
rwilkins on PROD1PC63 with NOTICES
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberley D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
• Label one copy of the comments for
the attention of Gas Branch 2, PJ–11.2;
• Reference Docket No. CP07–44–002
& CP07–45–001; and
• Mail your comments so that they
will be received in Washington, DC on
or before March 24, 2008.
The Commission encourages
electronic filing of comments. See 18
Code of Federal Regulations
385.2001(a)(1)(iii) and the instructions
on the Commission’s Internet Web site
at https://www.ferc.gov under the
‘‘eFiling’’ link and the link to the User’s
Guide. Prepare your submission in the
same manner as you would if filing on
paper and save it to a file on your hard
drive. Before you can file comments you
will need to create an account by
clicking on ‘‘Login to File’’ and then
‘‘New User Account.’’ You will be asked
to select the type of filing you are
making. This filing is considered a
‘‘Comment on Filing.’’
We may mail the EA for public
comment. If you are interested in
receiving it, please return the
Information Request (Appendix 2). If
you do not return the Information
Request, you will be taken off the
mailing list.
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding, or ‘‘intervenor’’. To become
an intervenor you must file a motion to
intervene according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Intervenors
have the right to seek rehearing of the
Commission’s decision. Motions to
Intervene should be electronically
submitted using the Commission’s
eFiling system at https://www.ferc.gov.
Persons without Internet access should
send an original and 14 copies of their
motion to the Secretary of the
Commission at the address indicated
previously. Persons filing Motions to
Intervene on or before the comment
deadline indicated above must send a
copy of the motion to the Applicant. All
filings, including late interventions,
submitted after the comment deadline
must be served on the Applicant and all
other intervenors identified on the
Commission’s service list for this
proceeding. Persons on the service list
with e-mail addresses may be served
VerDate Aug<31>2005
18:23 Feb 27, 2008
Jkt 214001
electronically; others must be served a
hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who own homes within
distances defined in the Commission’s
regulations of certain aboveground
facilities.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–3728 Filed 2–27–08; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
10759
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–65–000]
Tennessee Gas Pipeline Company;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Concord Lateral Expansion
Project, Request for Comments on
Environmental Issues, and Notice of
Site Visit
February 22, 2008.
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the potential environmental
impacts of the Concord Lateral
Expansion Project involving
construction and operation of natural
gas pipeline facilities by Tennessee Gas
Pipeline Company (Tennessee) in
Hillsborough and Merrimack Counties,
New Hampshire. The EA will be used
by the Commission in its decisionmaking process to determine whether
the project is in the public convenience
and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on March 24, 2008. Details on how
to submit comments are provided in the
Public Participation section of this
notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
Summary of the Proposed Project
Tennessee’s Concord Lateral
Expansion Project would provide 30,000
dekatherms per day of incremental
transportation capacity to serve Energy
North Natural Gas, Inc. d/b/a KeySpan
E:\FR\FM\28FEN1.SGM
28FEN1
Agencies
[Federal Register Volume 73, Number 40 (Thursday, February 28, 2008)]
[Notices]
[Pages 10758-10759]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-3728]
[[Page 10758]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. CP07-44-002; CP07-45-001]
Southeast Supply Header, LLC; Notice of Intent To Prepare an
Environmental Assessment for the Proposed Amendment Hi Field Lateral
Project and Request for Comments on Environmental Issues
February 21, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the amendment Southeast Supply
Header (SESH) is proposing. The requested amendment would approve the
proposed Hi Fields Lateral Project, consisting of an 11-mile 16-inch
outside diameter natural gas lateral pipeline between the SESH mainline
pipeline in Mobile County, Alabama and the Daniel Electric Generating
Plant in Jackson County, Mississippi. Additional equipments would be
installed as part of the proposed amendment. The EA will be used by the
Commission in its decision-making process to determine whether the
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help determine which issues
need to be evaluated in the EA. Please note that the scoping period
will close on March 24, 2008. Details on how to submit comments are
provided in the Public Participation section of this notice.
This notice is being sent to affected landowners; federal, state,
and local government agencies; elected officials; Native American
tribes; other interested parties; and local libraries and newspapers.
State and local government representatives are asked to notify their
constituents of this proposed project and to encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses a number
of typically asked questions, including the use of eminent domain and
how to participate in the Commission's proceedings. It is available for
viewing on the FERC Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
SESH proposes to construct approximately 11 miles of new 16-inch
outside diameter natural gas pipeline that would be installed from the
SESH mainline pipeline in Mobile County, Alabama, extending directly in
a southwesterly direction to Southern Company's Daniel Electric
Generating Plan facilities in Jackson County, Mississippi. Description
of the proposed facilities will include the following:
Approximately 11 miles of new 16-inch outside diameter
natural gas pipeline;
installing a new gas chromatograph building and satellite
communications equipment within Southern Company existing Plant Daniel
meter and regulation (M&R) station, which is located within the Daniel
Electric Generating Plant; and
installing two mainline valves on either end of the Hi
Fields lateral.
All project activities would be contained in Mobile County Alabama,
and Jackson County Mississippi. Construction of the proposed project
would affect approximately 177 acres of land. The cost for constructing
the proposed project would be approximately $19.4 million.
The general location of the proposed facilities is shown in
Appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's Web site at the ``eLibrary'' link or
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary refer to the ``Additional Information''
section of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail. Requests for detailed maps
of the proposed facilities should be made directly to El Paso.
---------------------------------------------------------------------------
The EA Process
We \2\ are preparing this EA to comply with the National
Environmental Policy Act (NEPA) which requires the Commission to take
into account the environmental impact that could result if it
authorizes SESH's proposal. By this notice, we are also asking federal,
state, and local agencies with jurisdiction and/or special expertise
with respect to environmental issues to formally cooperate with us in
the preparation of the EA. These agencies may choose to participate
once they have evaluated the proposal relative to their
responsibilities. Additional agencies that would like to request
cooperating agency status should follow the instructions for filing
comments provided under the Public Participation section of this
notice.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
NEPA also requires the FERC to discover and address concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
Notice of Intent, we are requesting public comments on the scope of the
issues to address in the EA. All comments received are considered
during the preparation of the EA.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils
Land use
Water resources, fisheries, and wetlands
Cultural resources
Vegetation and wildlife
Air quality and noise
Endangered and threatened species
We will also evaluate possible alternatives to the proposed project
or portions of the project, where necessary, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the Public Participation section below.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal including alternative compressor
station sites, and measures to avoid or lessen environmental impact.
The more specific your comments, the more useful they will be. Please
carefully follow
[[Page 10759]]
these instructions to ensure that your comments are received in time
and properly recorded:
Send an original and two copies of your letter to:
Kimberley D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of Gas
Branch 2, PJ-11.2;
Reference Docket No. CP07-44-002 & CP07-45-001; and
Mail your comments so that they will be received in
Washington, DC on or before March 24, 2008.
The Commission encourages electronic filing of comments. See 18
Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on
the Commission's Internet Web site at https://www.ferc.gov under the
``eFiling'' link and the link to the User's Guide. Prepare your
submission in the same manner as you would if filing on paper and save
it to a file on your hard drive. Before you can file comments you will
need to create an account by clicking on ``Login to File'' and then
``New User Account.'' You will be asked to select the type of filing
you are making. This filing is considered a ``Comment on Filing.''
We may mail the EA for public comment. If you are interested in
receiving it, please return the Information Request (Appendix 2). If
you do not return the Information Request, you will be taken off the
mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding, or ``intervenor''. To
become an intervenor you must file a motion to intervene according to
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214). Intervenors have the right to seek rehearing of the
Commission's decision. Motions to Intervene should be electronically
submitted using the Commission's eFiling system at https://www.ferc.gov.
Persons without Internet access should send an original and 14 copies
of their motion to the Secretary of the Commission at the address
indicated previously. Persons filing Motions to Intervene on or before
the comment deadline indicated above must send a copy of the motion to
the Applicant. All filings, including late interventions, submitted
after the comment deadline must be served on the Applicant and all
other intervenors identified on the Commission's service list for this
proceeding. Persons on the service list with e-mail addresses may be
served electronically; others must be served a hard copy of the filing.
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who own
homes within distances defined in the Commission's regulations of
certain aboveground facilities.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary''
link. Click on the eLibrary link, then on ``General Search'' and enter
the docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-3728 Filed 2-27-08; 8:45 am]