Combined Notice of Filings # 1, 10240-10241 [E8-3565]
Download as PDF
mstockstill on PROD1PC66 with NOTICES
10240
Federal Register / Vol. 73, No. 38 / Tuesday, February 26, 2008 / Notices
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link at https://www.ferc.gov.
The Commission strongly encourages
intervenors to file electronically.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
VerDate Aug<31>2005
19:29 Feb 25, 2008
Jkt 214001
Comment Date: February 26, 2008.
Applicants: PJM Interconnection,
L.L.C.
Kimberly D. Bose,
Description: PJM Interconnection,
Secretary.
LLC submits an executed
[FR Doc. E8–3547 Filed 2–25–08; 8:45 am]
interconnection service agreement
BILLING CODE 6717–01–P
among PJM, Shaffer Mountain Wind
LLC and Pennsylvania Electric
Company a FirstEnergy Company.
DEPARTMENT OF ENERGY
Filed Date: 02/14/2008.
Accession Number: 20080219–0091.
Federal Energy Regulatory
Comment Date: 5 p.m. Eastern Time
Commission
on Thursday, March 6, 2008.
Docket Numbers: ER08–565–000.
Combined Notice of Filings # 1
Applicants: Pacific Gas and Electric
February 20, 2008.
Company.
Take notice that the Commission
Description: Pacific Gas and Electric
received the following electric rate
Co. submits agreements for additional
filings:
capacity with Wellhead Power Panoche,
Docket Numbers: ER08–221–002.
LLC.
Applicants: PJM Interconnection,
Filed Date: 02/15/2008.
L.L.C.
Accession Number: 20080219–0147.
Description: PJM Interconnection,
Comment Date: 5 p.m. Eastern Time
LLC submits response to 1/11/08
on Friday, March 7, 2008.
deficiency letter regarding PJM’s
Docket Numbers: ER08–566–000.
11/15/07 filing of an executed
Applicants: Pacific Gas and Electric
interconnection service agreement
Company.
among PJM, Ameresco Stafford LLC and
Description: Pacific Gas and Electric
Virginia Electric and Power Company.
Company submits filing and acceptance
Filed Date: 02/14/2008.
two new agreements between PG&E and
Accession Number: 20080219–0092.
the Western Area Power
Comment Date: 5 p.m. Eastern Time
Administration.
on Thursday, March 6, 2008.
Filed Date: 02/15/2008.
Docket Numbers: ER08–411–002.
Accession Number: 20080219–0096.
Applicants: Tiger Natural Gas, Inc.
Comment Date: 5 p.m. Eastern Time
Description: Tiger Natural Gas, Inc.
on Friday, March 7, 2008.
submits Asset Appendix—2 pages and
Any person desiring to intervene or to
FERC Electric Tariff-Substitute Original protest in any of the above proceedings
Sheet.
must file in accordance with Rules 211
Filed Date: 02/14/2008.
and 214 of the Commission’s Rules of
Accession Number: 20080219–0093.
Practice and Procedure (18 CFR 385.211
Comment Date: 5 p.m. Eastern Time
and 385.214) on or before 5 p.m. Eastern
on Thursday, March 6, 2008.
time on the specified comment date. It
Docket Numbers: ER08–516–001.
is not necessary to separately intervene
Applicants: PJM Interconnection,
again in a subdocket related to a
L.L.C.
compliance filing if you have previously
Description: PJM Interconnection,
intervened in the same docket. Protests
LLC submits revisions to the Reliability
will be considered by the Commission
Pricing Model at Section 510 et al. of the in determining the appropriate action to
Attachment DD of the PJM Open Access be taken, but will not serve to make
Transmission Tariff in order to reflect
protestants parties to the proceeding.
recently increased construction cost.
Anyone filing a motion to intervene or
Filed Date: 02/14/2008.
protest must serve a copy of that
Accession Number: 20080219–0094.
document on the Applicant. In reference
Comment Date: 5 p.m. Eastern Time
to filings initiating a new proceeding,
on Thursday, March 6, 2008.
interventions or protests submitted on
Docket Numbers: ER08–527–001.
or before the comment deadline need
Applicants: Public Service Company
not be served on persons other than the
of Colorado.
Applicant.
Description: Public Service Company
The Commission encourages
of Colorado submits First Revised
electronic submission of protests and
Sheets 12 et al. to its First Revised
interventions in lieu of paper, using the
Schedule FERC 44 et al., as an errata to
FERC Online links at https://
its 2/1/08 filing.
www.ferc.gov. To facilitate electronic
Filed Date: 02/14/2008.
service, persons with Internet access
Accession Number: 20080219–0095.
who will eFile a document and/or be
Comment Date: 5 p.m. Eastern Time
listed as a contact for an intervenor
on Thursday, March 6, 2008.
must create and validate an
eRegistration account using the
Docket Numbers: ER08–563–000.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
E:\FR\FM\26FEN1.SGM
26FEN1
Federal Register / Vol. 73, No. 38 / Tuesday, February 26, 2008 / Notices
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St. NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive email
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8–3565 Filed 2–25–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No.: 2677–019]
City of Kaukauna, Wisconsin; Notice
Soliciting Scoping Comments
mstockstill on PROD1PC66 with NOTICES
February 5, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2677–019.
c. Date Filed: August 29, 2007.
d. Applicant: City of Kaukauna,
Wisconsin.
e. Name of Project: Badger-Rapide
Croche Hydroelectric Project.
f. Location: On the Fox River in
Outagamie County, near the city of
Kaukauna, Wisconsin. The project does
not affect federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mike Pedersen,
Kaukauna Utilities, 777 Island Street,
P.O. Box 1777, Kaukauna, WI 54130–
7077, 920–462–0220, or Arie DeWaal,
Mead & Hunt, Inc., 6501 Watts Road,
Madison, WI 53719, 608–273–6380.
i. FERC Contact: John Smith (202)
502–8972 or john.smith@ferc.gov.
j. Deadline for Filing Scoping
Comments: March 6, 2008.
VerDate Aug<31>2005
19:29 Feb 25, 2008
Jkt 214001
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
Scoping comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
k. This application is not ready for
environmental analysis at this time.
l. The existing project works consist
of the following two developments:
As licensed, the existing Badger
Development utilizes the head created
by the 22-foot-high Army Corps of
Engineers (Corps) Kaukauna dam and
consists of: (1) A 2,100-foot-long, 100foot-wide power canal that bifurcates
into a 260-foot-long, 200-foot-wide canal
and a 250-foot-long, 80-foot-wide canal
leading to; (2) the Old Badger
powerhouse containing two 1,000kilowatt (kW) generating units for a total
installed capacity of 2,000 kW; and (3)
the New Badger powerhouse containing
two 1,800-kilowatt (kW) generating
units for a total installed capacity of
3,600 kW; and (4) appurtenant facilities.
As licensed, the existing Rapide
Croche Development utilizes the head
created by the 20-foot-high Corps
Rapide Croche dam, located
approximately 4.5 miles downstream
from the Badger Development and
consists of: (1) A powerhouse, located
on the south end of the dam, containing
four 600-kW generating units for a total
installed capacity of 2,400 kW; (2) the
5-mile-long, 12-kV transmission line
(serving both developments); and (3)
appurtenant facilities.
The license application also indicates
that flashboards are used at the
Kaukauna (6-inch-high) and RapideCroche (30-inch-high) dams to provide
additional head for project generation.
The proposed project would include
decommissioning the Old Badger and
New Badger developments and
constructing a new 7-MW powerhouse
about 150 feet upstream from the
existing New Badger plant site.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
10241
Proposed project works would consist
of: (1) A modified power canal leading
to; (2) a new powerhouse with integral
intake; and (3) two identical 3.5- to 3.6MW horizontal Kaplan ‘‘S’’ type
turbines. The Old Badger development
would be converted to an alternative
use. The New Badger development
would be decommissioned, demolished,
and removed. The existing service road
would be demolished and removed. The
tailrace area associated with the existing
Old Badger development would be
filled with soil. A new service road
would be constructed over the filled
area. No significant changes are
proposed for the Rapide Croche
development.
The existing Badger and Rapide
Croche developments currently operate
in run-of-river mode and as proposed,
the new project would continue to
operate in a run-of-river mode.
m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Scoping Process
The Commission staff intends to
prepare a single environmental
assessment (EA) for the Badger-Rapide
Croche Hydroelectric Project in
accordance with the National
Environmental Policy Act. The EA will
consider both site-specific and
cumulative environmental impacts and
reasonable alternatives to the proposed
action.
Commission staff does not propose to
conduct any on-site scoping meetings at
this time. Instead, we are soliciting
comments, recommendations, and
information, on the scoping document
issued on February 5, 2008.
Copies of the scoping document
outlining the subject areas to be
addressed in the EA were distributed to
the parties on the Commission’s mailing
list and the applicant’s distribution list.
Copies of the scoping document may be
viewed on the web at https://
E:\FR\FM\26FEN1.SGM
26FEN1
Agencies
[Federal Register Volume 73, Number 38 (Tuesday, February 26, 2008)]
[Notices]
[Pages 10240-10241]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-3565]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
February 20, 2008.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER08-221-002.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, LLC submits response to 1/11/08
deficiency letter regarding PJM's 11/15/07 filing of an executed
interconnection service agreement among PJM, Ameresco Stafford LLC and
Virginia Electric and Power Company.
Filed Date: 02/14/2008.
Accession Number: 20080219-0092.
Comment Date: 5 p.m. Eastern Time on Thursday, March 6, 2008.
Docket Numbers: ER08-411-002.
Applicants: Tiger Natural Gas, Inc.
Description: Tiger Natural Gas, Inc. submits Asset Appendix--2
pages and FERC Electric Tariff-Substitute Original Sheet.
Filed Date: 02/14/2008.
Accession Number: 20080219-0093.
Comment Date: 5 p.m. Eastern Time on Thursday, March 6, 2008.
Docket Numbers: ER08-516-001.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, LLC submits revisions to the
Reliability Pricing Model at Section 510 et al. of the Attachment DD of
the PJM Open Access Transmission Tariff in order to reflect recently
increased construction cost.
Filed Date: 02/14/2008.
Accession Number: 20080219-0094.
Comment Date: 5 p.m. Eastern Time on Thursday, March 6, 2008.
Docket Numbers: ER08-527-001.
Applicants: Public Service Company of Colorado.
Description: Public Service Company of Colorado submits First
Revised Sheets 12 et al. to its First Revised Schedule FERC 44 et al.,
as an errata to its 2/1/08 filing.
Filed Date: 02/14/2008.
Accession Number: 20080219-0095.
Comment Date: 5 p.m. Eastern Time on Thursday, March 6, 2008.
Docket Numbers: ER08-563-000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, LLC submits an executed
interconnection service agreement among PJM, Shaffer Mountain Wind LLC
and Pennsylvania Electric Company a FirstEnergy Company.
Filed Date: 02/14/2008.
Accession Number: 20080219-0091.
Comment Date: 5 p.m. Eastern Time on Thursday, March 6, 2008.
Docket Numbers: ER08-565-000.
Applicants: Pacific Gas and Electric Company.
Description: Pacific Gas and Electric Co. submits agreements for
additional capacity with Wellhead Power Panoche, LLC.
Filed Date: 02/15/2008.
Accession Number: 20080219-0147.
Comment Date: 5 p.m. Eastern Time on Friday, March 7, 2008.
Docket Numbers: ER08-566-000.
Applicants: Pacific Gas and Electric Company.
Description: Pacific Gas and Electric Company submits filing and
acceptance two new agreements between PG&E and the Western Area Power
Administration.
Filed Date: 02/15/2008.
Accession Number: 20080219-0096.
Comment Date: 5 p.m. Eastern Time on Friday, March 7, 2008.
Any person desiring to intervene or to protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern time on the specified comment
date. It is not necessary to separately intervene again in a subdocket
related to a compliance filing if you have previously intervened in the
same docket. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant. In reference to filings initiating a new proceeding,
interventions or protests submitted on or before the comment deadline
need not be served on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
[[Page 10241]]
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First St. NE., Washington, DC 20426.
The filings in the above proceedings are accessible in the
Commission's eLibrary system by clicking on the appropriate link in the
above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed dockets(s). For assistance
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov.
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E8-3565 Filed 2-25-08; 8:45 am]