Placer County Water Agency; Notice of Intent To File License Application, Filing of Pre-Application Document, Commencement of Licensing Proceeding, Scoping, Solicitation of Comments on the Pad and Scoping Document, and Identification Issues and Associated Study Requests, 9113-9114 [E8-2989]
Download as PDF
Federal Register / Vol. 73, No. 33 / Tuesday, February 19, 2008 / Notices
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on February 15, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–2971 Filed 2–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2079–061]
Placer County Water Agency; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Commencement of Licensing
Proceeding, Scoping, Solicitation of
Comments on the Pad and Scoping
Document, and Identification Issues
and Associated Study Requests
mstockstill on PROD1PC66 with NOTICES
February 11, 2008.
a. Type of Filing: Notice of Intent to
File License Application for a New
License and Commencing Licensing
Proceeding.
b. Project No.: 2079–061.
c. Dated Filed: December 13, 2007.
d. Submitted By: Placer County Water
Agency.
e. Name of Project: Middle Fork
American River Project.
f. Location: The Middle Fork
American River Project is located in
Placer and El Dorado counties, almost
entirely within the Tahoe and El Dorado
National Forests. The project occupies
3811 acres of United States lands under
the jurisdiction of the Forest Service.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Applicant Contact: David A.
Breninger, General Manager, Placer
County Water Agency, P.O. Box 6570,
Auburn, CA 95604.
VerDate Aug<31>2005
16:52 Feb 15, 2008
Jkt 214001
i. FERC Contact: Jim Fargo at 202–
502–6095 or e-mail
james.fargo@ferc.gov.
j. We are asking Federal, State, local,
and tribal agencies with jurisdiction
and/or special expertise with respect to
environmental issues to cooperate with
us in the preparation of the
environmental document. Agencies who
would like to request cooperating status
should follow the instructions for filing
comments described in paragraph o
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of the environmental
document cannot also intervene. See, 94
FERC 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50 CFR
Part 402 and (b) the State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Placer County Water Agency as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. Placer County Water Agency filed
a Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, of for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
Register online at https://ferc.gov/
esubscribenow.htm to be notified via email of new filing and issuances related
to this or other pending projects. For
assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the PAD and Scoping
Document 1 (SD1), as well as study
requests. All comments on the PAD and
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
9113
SD1, and study requests should be sent
to the address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application (original and
eight copies) must be filed with the
Commission at the following address:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Middle Fork American River
Project) and number (P–2079–061), and
bear the heading ‘‘Comments on PreApplication Document,’’ ‘‘Study
Requests,’’ ‘‘Comments on Scoping
Document 1,’’ ‘‘Request for Cooperating
Agency Status,’’ or ‘‘Communications to
and from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by April 11, 2008.
Comments on the PAD and SD1,
study requests, requests for cooperating
agency status, and other permissible
forms of communications with the
Commission may be filed electronically
via the Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-filing’’ link.
p. Our intent is to prepare an
Environmental Impact Statement (EIS)
for which the planned meetings will
satisfy the NEPA scoping requirements.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Tuesday, March 4,
2008, 9 a.m.
Location: Auburn Recreation DistrictCanyon View Community Center.
E:\FR\FM\19FEN1.SGM
19FEN1
9114
Federal Register / Vol. 73, No. 33 / Tuesday, February 19, 2008 / Notices
Evening Scoping Meeting
Date and Time: Tuesday, March 4,
2008, 6:30 p.m.
Location: Auburn Recreation DistrictCanyon View Community Center.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
mstockstill on PROD1PC66 with NOTICES
Site Visit
Typically, a site visit is held together
with the scoping meeting. However,
because most of the project sites will not
be accessible in March, the licensees
and Commission staff will visit the
project sites on Wednesday, June 25,
2008, starting at 8 AM. All participants
should meet at Auburn Recreation
District Canyon View Community
Center, located at 471 Maidu Drive,
Auburn, California. Placer County Water
Agency will provide transportation for
participants. Anyone interested in
attending the site visit should contact
Mr. Mal Toy of Placer County Water
Agency at (530) 823–4889 by June 11,
2008.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
VerDate Aug<31>2005
16:52 Feb 15, 2008
Jkt 214001
Meeting Procedures
The meetings will be recorded by a
stenographer and will become part of
the formal record of the Commission
proceeding on the project.
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 5, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–2989 Filed 2–15–08; 8:45 am]
Kimberly D. Bose,
Secretary.
[FR Doc. E8–2968 Filed 2–15–08; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. RC08–4–000]
[Docket No. ER08–499–000]
New Harquahala Generating Company,
LLC; Notice of Filing
Pacific Gas and Electric Company;
Notice of Filing
February 8, 2008.
February 8, 2008.
Take notice that on February 4, 2008,
New Harquahala Generating Company,
LLC (Harquahala) submitted a request
for appeal of a NERC decision regarding
Harquahala’s registration as a
Transmission Owner and Transmission
Operator in the NERC Compliance
Registry.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
Take notice that on January 31, 2008,
Pacific Gas and Electric Company
(PG&E) and Sierra Pacific Power
Company tendered for filing a
replacement Interconnection Agreement
between both parties and a Notice of
Termination of PG&E First Revised Rate
Schedule No. 72, the existing
Interconnection Agreement.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
E:\FR\FM\19FEN1.SGM
19FEN1
Agencies
[Federal Register Volume 73, Number 33 (Tuesday, February 19, 2008)]
[Notices]
[Pages 9113-9114]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-2989]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2079-061]
Placer County Water Agency; Notice of Intent To File License
Application, Filing of Pre-Application Document, Commencement of
Licensing Proceeding, Scoping, Solicitation of Comments on the Pad and
Scoping Document, and Identification Issues and Associated Study
Requests
February 11, 2008.
a. Type of Filing: Notice of Intent to File License Application for
a New License and Commencing Licensing Proceeding.
b. Project No.: 2079-061.
c. Dated Filed: December 13, 2007.
d. Submitted By: Placer County Water Agency.
e. Name of Project: Middle Fork American River Project.
f. Location: The Middle Fork American River Project is located in
Placer and El Dorado counties, almost entirely within the Tahoe and El
Dorado National Forests. The project occupies 3811 acres of United
States lands under the jurisdiction of the Forest Service.
g. Filed Pursuant to: 18 CFR Part 5 of the Commission's
Regulations.
h. Applicant Contact: David A. Breninger, General Manager, Placer
County Water Agency, P.O. Box 6570, Auburn, CA 95604.
i. FERC Contact: Jim Fargo at 202-502-6095 or e-mail
james.fargo@ferc.gov.
j. We are asking Federal, State, local, and tribal agencies with
jurisdiction and/or special expertise with respect to environmental
issues to cooperate with us in the preparation of the environmental
document. Agencies who would like to request cooperating status should
follow the instructions for filing comments described in paragraph o
below. Cooperating agencies should note the Commission's policy that
agencies that cooperate in the preparation of the environmental
document cannot also intervene. See, 94 FERC 61,076 (2001).
k. With this notice, we are initiating informal consultation with:
(a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under
section 7 of the Endangered Species Act and the joint agency
regulations thereunder at 50 CFR Part 402 and (b) the State Historic
Preservation Officer, as required by section 106, National Historical
Preservation Act, and the implementing regulations of the Advisory
Council on Historic Preservation at 36 CFR 800.2.
l. With this notice, we are designating Placer County Water Agency
as the Commission's non-federal representative for carrying out
informal consultation, pursuant to section 7 of the Endangered Species
Act and section 106 of the National Historic Preservation Act.
m. Placer County Water Agency filed a Pre-Application Document
(PAD; including a proposed process plan and schedule) with the
Commission, pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's Web site
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, of for TTY,
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in paragraph h.
Register online at https://ferc.gov/esubscribenow.htm to be notified
via e-mail of new filing and issuances related to this or other pending
projects. For assistance, contact FERC Online Support.
o. With this notice, we are soliciting comments on the PAD and
Scoping Document 1 (SD1), as well as study requests. All comments on
the PAD and SD1, and study requests should be sent to the address above
in paragraph h. In addition, all comments on the PAD and SD1, study
requests, requests for cooperating agency status, and all
communications to and from Commission staff related to the merits of
the potential application (original and eight copies) must be filed
with the Commission at the following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. All filings with the Commission must include on
the first page, the project name (Middle Fork American River Project)
and number (P-2079-061), and bear the heading ``Comments on Pre-
Application Document,'' ``Study Requests,'' ``Comments on Scoping
Document 1,'' ``Request for Cooperating Agency Status,'' or
``Communications to and from Commission Staff.'' Any individual or
entity interested in submitting study requests, commenting on the PAD
or SD1, and any agency requesting cooperating status must do so by
April 11, 2008.
Comments on the PAD and SD1, study requests, requests for
cooperating agency status, and other permissible forms of
communications with the Commission may be filed electronically via the
Internet in lieu of paper. The Commission strongly encourages
electronic filings. See 18 CFR 385.2001(a)(1)(iii) and the instructions
on the Commission's Web site (https://www.ferc.gov) under the ``e-
filing'' link.
p. Our intent is to prepare an Environmental Impact Statement (EIS)
for which the planned meetings will satisfy the NEPA scoping
requirements.
Scoping Meetings
Commission staff will hold two scoping meetings in the vicinity of
the project at the time and place noted below. The daytime meeting will
focus on resource agency, Indian tribes, and non-governmental
organization concerns, while the evening meeting is primarily for
receiving input from the public. We invite all interested individuals,
organizations, and agencies to attend one or both of the meetings, and
to assist staff in identifying particular study needs, as well as the
scope of environmental issues to be addressed in the environmental
document. The times and locations of these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Tuesday, March 4, 2008, 9 a.m.
Location: Auburn Recreation District-Canyon View Community Center.
[[Page 9114]]
Evening Scoping Meeting
Date and Time: Tuesday, March 4, 2008, 6:30 p.m.
Location: Auburn Recreation District-Canyon View Community Center.
Scoping Document 1 (SD1), which outlines the subject areas to be
addressed in the environmental document, was mailed to the individuals
and entities on the Commission's mailing list. Copies of SD1 will be
available at the scoping meetings, or may be viewed on the web at
https://www.ferc.gov, using the ``eLibrary'' link. Follow the directions
for accessing information in paragraph n. Based on all oral and written
comments, a Scoping Document 2 (SD2) may be issued. SD2 may include a
revised process plan and schedule, as well as a list of issues,
identified through the scoping process.
Site Visit
Typically, a site visit is held together with the scoping meeting.
However, because most of the project sites will not be accessible in
March, the licensees and Commission staff will visit the project sites
on Wednesday, June 25, 2008, starting at 8 AM. All participants should
meet at Auburn Recreation District Canyon View Community Center,
located at 471 Maidu Drive, Auburn, California. Placer County Water
Agency will provide transportation for participants. Anyone interested
in attending the site visit should contact Mr. Mal Toy of Placer County
Water Agency at (530) 823-4889 by June 11, 2008.
Meeting Objectives
At the scoping meetings, staff will: (1) Initiate scoping of the
issues; (2) review and discuss existing conditions and resource
management objectives; (3) review and discuss existing information and
identify preliminary information and study needs; (4) review and
discuss the process plan and schedule for pre-filing activity that
incorporates the time frames provided for in Part 5 of the Commission's
regulations and, to the extent possible, maximizes coordination of
federal, state, and tribal permitting and certification processes; and
(5) discuss the appropriateness of any federal or state agency or
Indian tribe acting as a cooperating agency for development of an
environmental document.
Meeting participants should come prepared to discuss their issues
and/or concerns. Please review the PAD in preparation for the scoping
meetings. Directions on how to obtain a copy of the PAD and SD1 are
included in item n. of this document.
Meeting Procedures
The meetings will be recorded by a stenographer and will become
part of the formal record of the Commission proceeding on the project.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-2989 Filed 2-15-08; 8:45 am]