Consolidated Edison Energy Massachusetts, Inc., Consolidated Edison Energy Massachusetts, LLC; Notice of Application for Transfer of License, and Soliciting Comments, Motions To Intervene, and Protests, 9109 [E8-2974]
Download as PDF
Federal Register / Vol. 73, No. 33 / Tuesday, February 19, 2008 / Notices
instructions and requirements; (4)
training personnel to respond to a
collection of information; (5) searching
data sources; (6) completing and
reviewing the collection of information;
and (7) transmitting, or otherwise
disclosing the information.
The estimate of cost for respondents
is based upon salaries for professional
and clerical support, as well as direct
and indirect overhead costs. Direct costs
include all costs directly attributable to
providing this information, such as
administrative costs and the cost for
information technology. Indirect or
overhead costs are costs incurred by an
organization in support of its mission.
These costs apply to activities which
benefit the whole organization rather
than any one particular function or
activity.
Comments are invited on: (1) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the Commission,
including whether the information will
have practical utility; (2) the accuracy of
the agency’s estimate of the burden of
the proposed collection of information,
including the validity of the
methodology and assumptions used; (3)
ways to enhance the quality, utility and
clarity of the information to be
collected; and (4) ways to minimize the
burden of the collection of information
on those who are to respond, including
the use of appropriate automated,
electronic, mechanical, or other
technological collection techniques or
other forms of information technology
e.g., permitting electronic submission of
responses.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–2991 Filed 2–15–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2334–044]
mstockstill on PROD1PC66 with NOTICES
Consolidated Edison Energy
Massachusetts, Inc., Consolidated
Edison Energy Massachusetts, LLC;
Notice of Application for Transfer of
License, and Soliciting Comments,
Motions To Intervene, and Protests
February 8, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Transfer of
License.
VerDate Aug<31>2005
16:52 Feb 15, 2008
Jkt 214001
b. Project No.: 2334–044.
c. Date Filed: January 8, 2008.
d. Applicants: Consolidated Edison
Energy Massachusetts, Inc. (transferor)
and Consolidated Edison Energy
Massachusetts, LLC (Transferee).
e. Name and Location of Project:
Gardners Falls Hydroelectric Project is
located on the Deerfield and Monahan
Rivers in Franklin County
Massachusetts.
f. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
g. Applicant Contacts: For the
transferor: Mr. Andrew Scher,
Consolidated Edison Energy
Massachusetts, Inc., 4 Irving Place, New
York, NY 10003.
For the transferee: Mr. Andrew Scher,
Consolidated Edison Energy
Massachusetts, LLC., 4 Irving Place,
New York, NY 10003.
h. FERC Contact: Robert Bell at (202)
502–6062.
i. Deadline for filing comments,
protests, and motions to intervene:
February 25, 2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, SE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the Project Number on
any comments or motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing a document with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the documents
on that resource agency.
j. Description of Application:
Applicants seek Commission approval
to transfer the license for the Gardners
Falls Hydroelectric Project from
Consolidated Edison Energy
Massachusetts, Inc., to Consolidated
Edison Energy Massachusetts, LLC.
k. This filing is available for review at
the Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov using the eLibrary link.
Enter the docket number (P–2334) in the
docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
9109
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the addresses in item g
above.
l. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
m. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
n. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers. Any of the above-named
documents must be filed by providing
the original and eight copies to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicants specified in the particular
application.
o. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicants. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicants’ representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–2974 Filed 2–15–08; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19FEN1.SGM
19FEN1
Agencies
[Federal Register Volume 73, Number 33 (Tuesday, February 19, 2008)]
[Notices]
[Page 9109]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-2974]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2334-044]
Consolidated Edison Energy Massachusetts, Inc., Consolidated
Edison Energy Massachusetts, LLC; Notice of Application for Transfer of
License, and Soliciting Comments, Motions To Intervene, and Protests
February 8, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Transfer of License.
b. Project No.: 2334-044.
c. Date Filed: January 8, 2008.
d. Applicants: Consolidated Edison Energy Massachusetts, Inc.
(transferor) and Consolidated Edison Energy Massachusetts, LLC
(Transferee).
e. Name and Location of Project: Gardners Falls Hydroelectric
Project is located on the Deerfield and Monahan Rivers in Franklin
County Massachusetts.
f. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
g. Applicant Contacts: For the transferor: Mr. Andrew Scher,
Consolidated Edison Energy Massachusetts, Inc., 4 Irving Place, New
York, NY 10003.
For the transferee: Mr. Andrew Scher, Consolidated Edison Energy
Massachusetts, LLC., 4 Irving Place, New York, NY 10003.
h. FERC Contact: Robert Bell at (202) 502-6062.
i. Deadline for filing comments, protests, and motions to
intervene: February 25, 2008.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, SE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the Project
Number on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing a document with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the documents on that resource agency.
j. Description of Application: Applicants seek Commission approval
to transfer the license for the Gardners Falls Hydroelectric Project
from Consolidated Edison Energy Massachusetts, Inc., to Consolidated
Edison Energy Massachusetts, LLC.
k. This filing is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the eLibrary link. Enter the docket number
(P-2334) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the addresses in item
g above.
l. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
m. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
n. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', OR
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and eight
copies to: The Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. A copy of any motion to
intervene must also be served upon each representative of the
Applicants specified in the particular application.
o. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicants.
If an agency does not file comments within the time specified for
filing comments, it will be presumed to have no comments. One copy of
an agency's comments must also be sent to the Applicants'
representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-2974 Filed 2-15-08; 8:45 am]
BILLING CODE 6717-01-P