Public Service Electric and Gas Company; Notice of Filing, 8655 [E8-2718]

Download as PDF Federal Register / Vol. 73, No. 31 / Thursday, February 14, 2008 / Notices INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described applications. A copy of the applications may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E8–2727 Filed 2–13–08; 8:45 am] This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on February 25, 2008. Kimberly D. Bose, Secretary. [FR Doc. E8–2718 Filed 2–13–08; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 943–103] Federal Energy Regulatory Commission Public Service Electric and Gas Company; Notice of Filing Public Utility District No. 1 of Chelan County; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests February 7, 2008. February 7, 2008. Take notice that on February 4, 2008, Public Service Electric and Gas Company submitted an amendment to its December 7, 2007 Petition for Declaratory Order. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No.: 943–103. c. Date Filed: October 5, 2007. d. Applicant: Public Utility District No. 1 of Chelan County, Washington. e. Name of Project: Rock Island Hydroelectric Project. f. Location: The project is located on the Columbia River in Chelan County, Washington. The project does not occupy any Federal or tribal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Michelle Smith, License and Natural Resource Compliance Manager, Public Utility District No. 1 of Chelan County, P.O. Box 1231, Wenatchee, WA 98807–1231. Phone: (888) 663–8121, Ext. 4180. i. FERC Contact: Any questions on this notice should be addressed to Brian Romanek at (202) 502–6175, or e-mail address: Brian.Romanek@ferc.gov. j. Deadline for filing comments, motions to intervene, and protest: February 29, 2008. k. Description of the Application: The Public Utility District No. 1 of Chelan rwilkins on PROD1PC63 with NOTICES [Docket No. EL08–19–000] VerDate Aug<31>2005 16:49 Feb 13, 2008 Jkt 214001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 8655 County, Washington, licensee of the Rock Island Hydroelectric Project, has filed an application seeking authorization from the Federal Energy Regulatory Commission to remove 1.01 acres of land from Wenatchee Riverfront Park, and the hydroelectric project. The land would be conveyed to the City of Wenatchee (City). Also, the licensee proposes to add 0.87 acre of land to the park, and the project. This land exchange, which has been coordinated with the City, would accommodate a roadway corridor modification, consistent with the City’s plans for improving riverfront access for the public. This modification would entail adding approximately 55 parking spaces and 170 linear feet of trails and walkways. In addition, the licensee proposes to remove from the project a 0.47 acre parcel of land that was discovered to be mistakenly included within the project boundary. The City is the fee-title owner of the parcel. It abuts the City’s old water works building. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified E:\FR\FM\14FEN1.SGM 14FEN1

Agencies

[Federal Register Volume 73, Number 31 (Thursday, February 14, 2008)]
[Notices]
[Page 8655]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-2718]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket No. EL08-19-000]


Public Service Electric and Gas Company; Notice of Filing

 February 7, 2008.
    Take notice that on February 4, 2008, Public Service Electric and 
Gas Company submitted an amendment to its December 7, 2007 Petition for 
Declaratory Order.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://
www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on February 25, 2008.

Kimberly D. Bose,
Secretary.
 [FR Doc. E8-2718 Filed 2-13-08; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.