Airworthiness Directives; Saab Model SAAB 2000 Airplanes, 6590-6592 [E8-1812]

Download as PDF 6590 Federal Register / Vol. 73, No. 24 / Tuesday, February 5, 2008 / Rules and Regulations pin restraints have been replaced with new restraints in accordance with paragraph (g)(1) of this AD. (i) As of the effective date of this AD, no Goodrich evacuation system with a part number and serial number identified in paragraphs (c)(3) through (c)(27) of this AD may be installed on any airplane, unless the shear-pin restraints have been inspected and found acceptable in accordance with paragraph (g)(2) of this AD. Credit for Actions Done Using Previous Service Information (j) Replacements and inspections done before the effective date of this AD in accordance with Goodrich Service Bulletin 25–343, dated October 15, 2003; Revision 1, dated January 31, 2005; or Revision 2, dated October 11, 2006; are acceptable for compliance with the requirements of paragraph (g) of this AD. DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA–2007–0299; Directorate Identifier 2007–NM–239–AD; Amendment 39–15358; AD 2008–03–08] RIN 2120–AA64 Airworthiness Directives; Saab Model SAAB 2000 Airplanes Federal Aviation Administration (FAA), Department of Transportation (DOT). ACTION: Final rule. AGENCY: Alternative Methods of Compliance (AMOCs) (k)(1) The Manager, Los Angeles Aircraft Certification Office, FAA, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. (2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. SUMMARY: We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as: Subsequent to accidents involving Fuel Tank System explosions in flight * * * and on ground, the FAA has published Special Federal Aviation Regulation 88 (SFAR88) * * * [which] required * * * [conducting] a design review against explosion risks. Material Incorporated by Reference rmajette on PROD1PC64 with RULES (l) You must use Goodrich Service Bulletin 25–343, Revision 3, dated January 12, 2007, to perform the actions that are required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approved the incorporation by reference of this document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Contact Goodrich, Aircraft Interior Products, ATTN: Technical Publications, 3414 South Fifth Street, Phoenix, AZ 85040–1169, for a copy of this service information. You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202–741–6030, or go to: https://www.archives.gov/federal-register/ cfr/ibr-locations.html. Issued in Renton, Washington, on January 18, 2008. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E8–1724 Filed 2–4–08; 8:45 am] BILLING CODE 4910–13–P VerDate Aug<31>2005 15:28 Feb 04, 2008 Jkt 214001 The unsafe condition is the potential of ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane. We are issuing this AD to require actions to correct the unsafe condition on these products. DATES: This AD becomes effective March 11, 2008. The Director of the Federal Register approved the incorporation by reference of certain publications listed in this AD as of March 11, 2008. ADDRESSES: You may examine the AD docket on the Internet at https:// www.regulations.gov or in person at the U.S. Department of Transportation, Docket Operations, M–30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC. FOR FURTHER INFORMATION CONTACT: Shahram Daneshmandi, Aerospace Engineer, International Branch, ANM– 116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057–3356; telephone (425) 227–1112; fax (425) 227–1149. SUPPLEMENTARY INFORMATION: Discussion We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR PO 00000 Frm 00014 Fmt 4700 Sfmt 4700 part 39 to include an AD that would apply to the specified products. That NPRM was published in the Federal Register on December 10, 2007 (72 FR 69628). That NPRM proposed to correct an unsafe condition for the specified products. The MCAI states: Subsequent to accidents involving Fuel Tank System explosions in flight * * * and on ground, the FAA has published Special Federal Aviation Regulation 88 (SFAR88) in June 2001. In their Letters referenced 04/00/02/07/01– L296 dated March 4th, 2002 and 04/00/02/ 07/03–L024, dated February 3rd, 2003, the JAA (Joint Aviation Authorities) recommended the application of a similar regulation to the National Aviation Authorities (NAA). Under this regulation, all holders of type certificates for passenger transport aircraft with either a passenger capacity of 30 or more, or a payload capacity of 7,500 pounds (3402 kg) or more, which have received their certification since January 1st, 1958, are required to conduct a design review against explosion risks. This Airworthiness Directive (AD), which renders mandatory the modification [6089] of improving the sealing of Fuel Access Doors, is a consequence of the design review. The unsafe condition is the potential of ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane. Saab Modification 6089 includes removing the fuel tank access doors and the old type of clamp rings and gaskets; installing new, improved clamp rings; re-installing the fuel tank access doors; and doing related investigative actions and applicable corrective actions. Related investigative actions and applicable corrective actions include inspecting for corrosion of the wing skin panel and access door areas, and, as applicable, replacing wear protection; contacting Saab and doing repairs if doubler flange is less than specified thickness; replacing any corroded or damaged foil panel; replacing any damaged sealing ring; removing corrosion from the wing skin panel; inspecting the access doors for damage and correct installation of the aluminum panel on the access door; and, as applicable, replacing the aluminum panel or the entire access door. You may obtain further information by examining the MCAI in the AD docket. Comments We gave the public the opportunity to participate in developing this AD. We received no comments on the NPRM or on the determination of the cost to the public. E:\FR\FM\05FER1.SGM 05FER1 Federal Register / Vol. 73, No. 24 / Tuesday, February 5, 2008 / Rules and Regulations Conclusion We reviewed the available data and determined that air safety and the public interest require adopting the AD as proposed. Differences Between This AD and the MCAI or Service Information We have reviewed the MCAI and related service information and, in general, agree with their substance. But we might have found it necessary to use different words from those in the MCAI to ensure the AD is clear for U.S. operators and is enforceable. In making these changes, we do not intend to differ substantively from the information provided in the MCAI and related service information. We might also have required different actions in this AD from those in the MCAI in order to follow our FAA policies. Any such differences are highlighted in a NOTE within the AD. rmajette on PROD1PC64 with RULES Costs of Compliance We estimate that this AD will affect about 6 products of U.S. registry. We also estimate that it will take about 130 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $80 per work-hour. Required parts will cost about $6,400 per product. Where the service information lists required parts costs that are covered under warranty, we have assumed that there will be no charge for these parts. As we do not control warranty coverage for affected parties, some parties may incur costs higher than estimated here. Based on these figures, we estimate the cost of this AD to the U.S. operators to be $100,800, or $16,800 per product. Authority for This Rulemaking Title 49 of the United States Code specifies the FAA’s authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. ‘‘Subtitle VII: Aviation Programs,’’ describes in more detail the scope of the Agency’s authority. We are issuing this rulemaking under the authority described in ‘‘Subtitle VII, Part A, Subpart III, Section 44701: General requirements.’’ Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action. VerDate Aug<31>2005 15:28 Feb 04, 2008 Jkt 214001 Regulatory Findings We determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. For the reasons discussed above, I certify this AD: 1. Is not a ‘‘significant regulatory action’’ under Executive Order 12866; 2. Is not a ‘‘significant rule’’ under the DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and 3. Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. We prepared a regulatory evaluation of the estimated costs to comply with this AD and placed it in the AD docket. Examining the AD Docket You may examine the AD docket on the Internet at https:// www.regulations.gov; or in person at the Docket Operations office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The AD docket contains the NPRM, the regulatory evaluation, any comments received, and other information. The street address for the Docket Operations office (telephone (800) 647–5527) is in the ADDRESSES section. Comments will be available in the AD docket shortly after receipt. List of Subjects in 14 CFR Part 39 Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. Adoption of the Amendment Accordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: I 1. The authority citation for part 39 continues to read as follows: I Authority: 49 U.S.C. 106(g), 40113, 44701. [Amended] 2. The FAA amends § 39.13 by adding the following new AD: I 2008–03–08 SAAB Aircraft AB: Amendment 39–15358. Docket No. FAA–2007–0299; Directorate Identifier 2007–NM–239–AD. Effective Date (a) This airworthiness directive (AD) becomes effective March 11, 2008. PO 00000 Frm 00015 Fmt 4700 Sfmt 4700 Affected ADs (b) None. Applicability (c) This AD applies to Saab Model SAAB 2000 airplanes, all serial numbers, certificated in any category. Subject (d) Air Transport Association (ATA) of America Code 57: Wings. Reason (e) The mandatory continuing airworthiness information (MCAI) states: Subsequent to accidents involving Fuel Tank System explosions in flight * * * and on ground, the FAA has published Special Federal Aviation Regulation 88 (SFAR88) in June 2001. In their Letters referenced 04/00/02/07/01– L296 dated March 4th, 2002 and 04/00/02/ 07/03–L024, dated February 3rd, 2003, the JAA (Joint Aviation Authorities) recommended the application of a similar regulation to the National Aviation Authorities (NAA). Under this regulation, all holders of type certificates for passenger transport aircraft with either a passenger capacity of 30 or more, or a payload capacity of 7,500 pounds (3402 kg) or more, which have received their certification since January 1st, 1958, are required to conduct a design review against explosion risks. This Airworthiness Directive (AD), which renders mandatory the modification [6089] of improving the sealing of Fuel Access Doors, is a consequence of the design review. The unsafe condition is the potential of ignition sources inside fuel tanks, which, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane. Actions and Compliance (f) Within 48 months after the effective date of this AD, unless already done, do Modification 6089 and all related investigative actions and applicable corrective actions, in accordance with the Accomplishment Instructions of Saab Service Bulletin 2000–57–033, dated March 2, 2000; or Revision 01, dated March 31, 2000. Do all applicable related investigative and corrective actions before further flight. FAA AD Differences PART 39—AIRWORTHINESS DIRECTIVES § 39.13 6591 Note 1: This AD differs from the MCAI and/or service information as follows: No differences. Other FAA AD Provisions (g) The following provisions also apply to this AD: (1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM–116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Shahram Daneshmandi, Aerospace Engineer, International Branch, ANM–116, Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., Renton, Washington 98057– E:\FR\FM\05FER1.SGM 05FER1 6592 Federal Register / Vol. 73, No. 24 / Tuesday, February 5, 2008 / Rules and Regulations 3356; telephone (425) 227–1112; fax (425) 227–1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. (2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service. (3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act, the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120–0056. Related Information (h) Refer to MCAI EASA Airworthiness Directive 2007–0167, dated June 15, 2007; Saab Service Bulletin 2000–57–033, dated March 2, 2000; and Saab Service Bulletin 2000–57–033, Revision 01, dated March 31, 2000; for related information. Material Incorporated by Reference (i) You must use Saab Service Bulletin 2000–57–033, dated March 2, 2000; or Saab Service Bulletin 2000–57–033, Revision 01, dated March 31, 2000; to do the actions required by this AD, unless the AD specifies otherwise. (1) The Director of the Federal Register approved the incorporation by reference of this service information under 5 U.S.C. 552(a) and 1 CFR part 51. (2) For service information identified in this AD, contact Saab Aircraft AB, SAAB Aircraft Product Support, S–581.88, ¨ Linkoping, Sweden. (3) You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741–6030, or go to: https:// www.archives.gov/federal-register/cfr/ibrlocations.html. Issued in Renton, Washington, on January 24, 2008. Ali Bahrami, Manager, Transport Airplane Directorate, Aircraft Certification Service. [FR Doc. E8–1812 Filed 2–4–08; 8:45 am] rmajette on PROD1PC64 with RULES BILLING CODE 4910–13–P VerDate Aug<31>2005 15:28 Feb 04, 2008 Jkt 214001 DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA–2007–0249; Directorate Identifier 2007–CE–088–AD; Amendment 39–15361; AD 2008–03–11] RIN 2120–AA64 Airworthiness Directives; Alpha Aviation Design Limited Model R2160 Airplanes Federal Aviation Administration (FAA), Department of Transportation (DOT). ACTION: Final rule. AGENCY: SUMMARY: We are superseding an existing airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as distortion of the rudder bars due to rudder control forces during aerobatic operation and nose wheel steering reaction forces. Rudder bar distortion could result in reduced control or loss of control. This AD requires actions that are intended to address the unsafe condition described in the MCAI. DATES: This AD becomes effective March 11, 2008. As of March 11, 2008, the Director of the Federal Register approved the incorporation by reference of certain publications listed in this AD. ADDRESSES: You may examine the AD docket on the Internet at https:// www.regulations.gov or in person at the Docket Management Facility, U.S. Department of Transportation, Docket Operations, M–30, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue, SE., Washington, DC 20590. FOR FURTHER INFORMATION CONTACT: Karl Schletzbaum, Aerospace Engineer, 901 Locust, Room 301, Kansas City, Missouri 64106; telephone: (816) 329– 4146; fax: (816) 329–4090. SUPPLEMENTARY INFORMATION: published in 1987 and AD 99–01–04, Amendment 39–10971, published in 1999. That NPRM proposed to correct an unsafe condition for the specified products. The MCAI states that rudder control forces during aerobatic operation and nose wheel steering reaction forces may cause rudder bar distortion. Rudder bar distortion could result in reduced control or loss of control. The MCAI requires you to replace the left and right rudder bars with reinforced rudder bars. Comments We gave the public the opportunity to participate in developing this AD. We received no comments on the NPRM or on the determination of the cost to the public. Conclusion We reviewed the available data and determined that air safety and the public interest require adopting the AD as proposed. Differences Between This AD and the MCAI or Service Information We have reviewed the MCAI and related service information and, in general, agree with their substance. But we might have found it necessary to use different words from those in the MCAI to ensure the AD is clear for U.S. operators and is enforceable. In making these changes, we do not intend to differ substantively from the information provided in the MCAI and related service information. We might also have required different actions in this AD from those in the MCAI in order to follow FAA policies. Any such differences are highlighted in a NOTE within the AD. Costs of Compliance We estimate that this AD will affect 9 products of U.S. registry. We also estimate that it will take about 3 workhours per product to comply with basic requirements of this AD. The average labor rate is $80 per work-hour. Required parts will cost about $657 per product. Based on these figures, we estimate the cost of this AD to the U.S. operators to be $8,073 or $897 per product. Discussion Authority for This Rulemaking We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to the specified products. That NPRM was published in the Federal Register on November 27, 2007 (72 FR 66089) and proposed to supersede AD 87–08–01, Amendment 39–5601, Title 49 of the United States Code specifies the FAA’s authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. ‘‘Subtitle VII: Aviation Programs,’’ describes in more detail the scope of the Agency’s authority. PO 00000 Frm 00016 Fmt 4700 Sfmt 4700 E:\FR\FM\05FER1.SGM 05FER1

Agencies

[Federal Register Volume 73, Number 24 (Tuesday, February 5, 2008)]
[Rules and Regulations]
[Pages 6590-6592]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1812]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

14 CFR Part 39

[Docket No. FAA-2007-0299; Directorate Identifier 2007-NM-239-AD; 
Amendment 39-15358; AD 2008-03-08]
RIN 2120-AA64


Airworthiness Directives; Saab Model SAAB 2000 Airplanes

AGENCY: Federal Aviation Administration (FAA), Department of 
Transportation (DOT).

ACTION: Final rule.

-----------------------------------------------------------------------

SUMMARY: We are adopting a new airworthiness directive (AD) for the 
products listed above. This AD results from mandatory continuing 
airworthiness information (MCAI) originated by an aviation authority of 
another country to identify and correct an unsafe condition on an 
aviation product. The MCAI describes the unsafe condition as:

    Subsequent to accidents involving Fuel Tank System explosions in 
flight * * * and on ground, the FAA has published Special Federal 
Aviation Regulation 88 (SFAR88) * * * [which] required * * * 
[conducting] a design review against explosion risks.

    The unsafe condition is the potential of ignition sources inside 
fuel tanks, which, in combination with flammable fuel vapors, could 
result in fuel tank explosions and consequent loss of the airplane. We 
are issuing this AD to require actions to correct the unsafe condition 
on these products.

DATES: This AD becomes effective March 11, 2008.
    The Director of the Federal Register approved the incorporation by 
reference of certain publications listed in this AD as of March 11, 
2008.

ADDRESSES: You may examine the AD docket on the Internet at https://
www.regulations.gov or in person at the U.S. Department of 
Transportation, Docket Operations, M-30, West Building Ground Floor, 
Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC.

FOR FURTHER INFORMATION CONTACT: Shahram Daneshmandi, Aerospace 
Engineer, International Branch, ANM-116, Transport Airplane 
Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; 
telephone (425) 227-1112; fax (425) 227-1149.

SUPPLEMENTARY INFORMATION:

Discussion

    We issued a notice of proposed rulemaking (NPRM) to amend 14 CFR 
part 39 to include an AD that would apply to the specified products. 
That NPRM was published in the Federal Register on December 10, 2007 
(72 FR 69628). That NPRM proposed to correct an unsafe condition for 
the specified products. The MCAI states:

    Subsequent to accidents involving Fuel Tank System explosions in 
flight * * * and on ground, the FAA has published Special Federal 
Aviation Regulation 88 (SFAR88) in June 2001.
    In their Letters referenced 04/00/02/07/01-L296 dated March 4th, 
2002 and 04/00/02/07/03-L024, dated February 3rd, 2003, the JAA 
(Joint Aviation Authorities) recommended the application of a 
similar regulation to the National Aviation Authorities (NAA).
    Under this regulation, all holders of type certificates for 
passenger transport aircraft with either a passenger capacity of 30 
or more, or a payload capacity of 7,500 pounds (3402 kg) or more, 
which have received their certification since January 1st, 1958, are 
required to conduct a design review against explosion risks.
    This Airworthiness Directive (AD), which renders mandatory the 
modification [6089] of improving the sealing of Fuel Access Doors, 
is a consequence of the design review.

The unsafe condition is the potential of ignition sources inside fuel 
tanks, which, in combination with flammable fuel vapors, could result 
in fuel tank explosions and consequent loss of the airplane. Saab 
Modification 6089 includes removing the fuel tank access doors and the 
old type of clamp rings and gaskets; installing new, improved clamp 
rings; re-installing the fuel tank access doors; and doing related 
investigative actions and applicable corrective actions. Related 
investigative actions and applicable corrective actions include 
inspecting for corrosion of the wing skin panel and access door areas, 
and, as applicable, replacing wear protection; contacting Saab and 
doing repairs if doubler flange is less than specified thickness; 
replacing any corroded or damaged foil panel; replacing any damaged 
sealing ring; removing corrosion from the wing skin panel; inspecting 
the access doors for damage and correct installation of the aluminum 
panel on the access door; and, as applicable, replacing the aluminum 
panel or the entire access door. You may obtain further information by 
examining the MCAI in the AD docket.

Comments

    We gave the public the opportunity to participate in developing 
this AD. We received no comments on the NPRM or on the determination of 
the cost to the public.

[[Page 6591]]

Conclusion

    We reviewed the available data and determined that air safety and 
the public interest require adopting the AD as proposed.

Differences Between This AD and the MCAI or Service Information

    We have reviewed the MCAI and related service information and, in 
general, agree with their substance. But we might have found it 
necessary to use different words from those in the MCAI to ensure the 
AD is clear for U.S. operators and is enforceable. In making these 
changes, we do not intend to differ substantively from the information 
provided in the MCAI and related service information.
    We might also have required different actions in this AD from those 
in the MCAI in order to follow our FAA policies. Any such differences 
are highlighted in a NOTE within the AD.

Costs of Compliance

    We estimate that this AD will affect about 6 products of U.S. 
registry. We also estimate that it will take about 130 work-hours per 
product to comply with the basic requirements of this AD. The average 
labor rate is $80 per work-hour. Required parts will cost about $6,400 
per product. Where the service information lists required parts costs 
that are covered under warranty, we have assumed that there will be no 
charge for these parts. As we do not control warranty coverage for 
affected parties, some parties may incur costs higher than estimated 
here. Based on these figures, we estimate the cost of this AD to the 
U.S. operators to be $100,800, or $16,800 per product.

Authority for This Rulemaking

    Title 49 of the United States Code specifies the FAA's authority to 
issue rules on aviation safety. Subtitle I, section 106, describes the 
authority of the FAA Administrator. ``Subtitle VII: Aviation 
Programs,'' describes in more detail the scope of the Agency's 
authority.
    We are issuing this rulemaking under the authority described in 
``Subtitle VII, Part A, Subpart III, Section 44701: General 
requirements.'' Under that section, Congress charges the FAA with 
promoting safe flight of civil aircraft in air commerce by prescribing 
regulations for practices, methods, and procedures the Administrator 
finds necessary for safety in air commerce. This regulation is within 
the scope of that authority because it addresses an unsafe condition 
that is likely to exist or develop on products identified in this 
rulemaking action.

Regulatory Findings

    We determined that this AD will not have federalism implications 
under Executive Order 13132. This AD will not have a substantial direct 
effect on the States, on the relationship between the national 
government and the States, or on the distribution of power and 
responsibilities among the various levels of government.
    For the reasons discussed above, I certify this AD:
    1. Is not a ``significant regulatory action'' under Executive Order 
12866;
    2. Is not a ``significant rule'' under the DOT Regulatory Policies 
and Procedures (44 FR 11034, February 26, 1979); and
    3. Will not have a significant economic impact, positive or 
negative, on a substantial number of small entities under the criteria 
of the Regulatory Flexibility Act.
    We prepared a regulatory evaluation of the estimated costs to 
comply with this AD and placed it in the AD docket.

Examining the AD Docket

    You may examine the AD docket on the Internet at https://
www.regulations.gov; or in person at the Docket Operations office 
between 9 a.m. and 5 p.m., Monday through Friday, except Federal 
holidays. The AD docket contains the NPRM, the regulatory evaluation, 
any comments received, and other information. The street address for 
the Docket Operations office (telephone (800) 647-5527) is in the 
ADDRESSES section. Comments will be available in the AD docket shortly 
after receipt.

List of Subjects in 14 CFR Part 39

    Air transportation, Aircraft, Aviation safety, Incorporation by 
reference, Safety.

Adoption of the Amendment

0
Accordingly, under the authority delegated to me by the Administrator, 
the FAA amends 14 CFR part 39 as follows:

PART 39--AIRWORTHINESS DIRECTIVES

0
1. The authority citation for part 39 continues to read as follows:

    Authority: 49 U.S.C. 106(g), 40113, 44701.


Sec.  39.13  [Amended]

0
2. The FAA amends Sec.  39.13 by adding the following new AD:

2008-03-08 SAAB Aircraft AB: Amendment 39-15358. Docket No. FAA-
2007-0299; Directorate Identifier 2007-NM-239-AD.

Effective Date

    (a) This airworthiness directive (AD) becomes effective March 
11, 2008.

Affected ADs

    (b) None.

Applicability

    (c) This AD applies to Saab Model SAAB 2000 airplanes, all 
serial numbers, certificated in any category.

Subject

    (d) Air Transport Association (ATA) of America Code 57: Wings.

Reason

    (e) The mandatory continuing airworthiness information (MCAI) 
states:

    Subsequent to accidents involving Fuel Tank System explosions in 
flight * * * and on ground, the FAA has published Special Federal 
Aviation Regulation 88 (SFAR88) in June 2001.
    In their Letters referenced 04/00/02/07/01-L296 dated March 4th, 
2002 and 04/00/02/07/03-L024, dated February 3rd, 2003, the JAA 
(Joint Aviation Authorities) recommended the application of a 
similar regulation to the National Aviation Authorities (NAA).
    Under this regulation, all holders of type certificates for 
passenger transport aircraft with either a passenger capacity of 30 
or more, or a payload capacity of 7,500 pounds (3402 kg) or more, 
which have received their certification since January 1st, 1958, are 
required to conduct a design review against explosion risks.
    This Airworthiness Directive (AD), which renders mandatory the 
modification [6089] of improving the sealing of Fuel Access Doors, 
is a consequence of the design review.

The unsafe condition is the potential of ignition sources inside 
fuel tanks, which, in combination with flammable fuel vapors, could 
result in fuel tank explosions and consequent loss of the airplane.

Actions and Compliance

    (f) Within 48 months after the effective date of this AD, unless 
already done, do Modification 6089 and all related investigative 
actions and applicable corrective actions, in accordance with the 
Accomplishment Instructions of Saab Service Bulletin 2000-57-033, 
dated March 2, 2000; or Revision 01, dated March 31, 2000. Do all 
applicable related investigative and corrective actions before 
further flight.

FAA AD Differences

    Note 1: This AD differs from the MCAI and/or service information 
as follows: No differences.

Other FAA AD Provisions

    (g) The following provisions also apply to this AD:
    (1) Alternative Methods of Compliance (AMOCs): The Manager, 
International Branch, ANM-116, Transport Airplane Directorate, FAA, 
has the authority to approve AMOCs for this AD, if requested using 
the procedures found in 14 CFR 39.19. Send information to ATTN: 
Shahram Daneshmandi, Aerospace Engineer, International Branch, ANM-
116, Transport Airplane Directorate, FAA, 1601 Lind Avenue SW., 
Renton, Washington 98057-

[[Page 6592]]

3356; telephone (425) 227-1112; fax (425) 227-1149. Before using any 
approved AMOC on any airplane to which the AMOC applies, notify your 
appropriate principal inspector (PI) in the FAA Flight Standards 
District Office (FSDO), or lacking a PI, your local FSDO.
    (2) Airworthy Product: For any requirement in this AD to obtain 
corrective actions from a manufacturer or other source, use these 
actions if they are FAA-approved. Corrective actions are considered 
FAA-approved if they are approved by the State of Design Authority 
(or their delegated agent). You are required to assure the product 
is airworthy before it is returned to service.
    (3) Reporting Requirements: For any reporting requirement in 
this AD, under the provisions of the Paperwork Reduction Act, the 
Office of Management and Budget (OMB) has approved the information 
collection requirements and has assigned OMB Control Number 2120-
0056.

Related Information

    (h) Refer to MCAI EASA Airworthiness Directive 2007-0167, dated 
June 15, 2007; Saab Service Bulletin 2000-57-033, dated March 2, 
2000; and Saab Service Bulletin 2000-57-033, Revision 01, dated 
March 31, 2000; for related information.

Material Incorporated by Reference

    (i) You must use Saab Service Bulletin 2000-57-033, dated March 
2, 2000; or Saab Service Bulletin 2000-57-033, Revision 01, dated 
March 31, 2000; to do the actions required by this AD, unless the AD 
specifies otherwise.
    (1) The Director of the Federal Register approved the 
incorporation by reference of this service information under 5 
U.S.C. 552(a) and 1 CFR part 51.
    (2) For service information identified in this AD, contact Saab 
Aircraft AB, SAAB Aircraft Product Support, S-581.88, 
Link[ouml]ping, Sweden.
    (3) You may review copies at the FAA, Transport Airplane 
Directorate, 1601 Lind Avenue SW., Renton, Washington; or at the 
National Archives and Records Administration (NARA). For information 
on the availability of this material at NARA, call (202) 741-6030, 
or go to: https://www.archives.gov/federal-register/cfr/ibr-
locations.html.

    Issued in Renton, Washington, on January 24, 2008.
Ali Bahrami,
Manager, Transport Airplane Directorate, Aircraft Certification 
Service.
[FR Doc. E8-1812 Filed 2-4-08; 8:45 am]
BILLING CODE 4910-13-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.