Application To Export Electric Energy; Synergy Power Marketing, Inc., 6171-6172 [E8-1916]
Download as PDF
Federal Register / Vol. 73, No. 22 / Friday, February 1, 2008 / Notices
To use PDF you must have Adobe
Acrobat Reader, which is available free
at this site. If you have questions about
using PDF, call the U.S. Government
Printing Office (GPO), toll free, at 1–
888–293–6498; or in the Washington,
DC, area at (202) 512–1530.
Note: The official version of this document
is the document published in the Federal
Register. Free Internet access to the official
edition of the Federal Register and the Code
of Federal Regulations is available on GPO
Access at: https://www.gpoaccess.gov/nara/
index.html.
Dated: January 29, 2008.
Tracy R. Justesen,
Assistant Secretary for Special Education and
Rehabilitative Services.
[FR Doc. E8–1907 Filed 1–31–08; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–332]
Application To Export Electric Energy;
Nexen Marketing U.S.A. Inc.
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
mstockstill on PROD1PC66 with NOTICES
AGENCY:
SUMMARY: Nexen Marketing U.S.A. Inc.
(Nexen) has applied for authority to
transmit electric energy from the United
States to Canada pursuant to section
202(e) of the Federal Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before March 3, 2008.
ADDRESSES: Comments, protests, or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, 20585–0350 (FAX 202–
586–8008).
FOR FURTHER INFORMATION CONTACT:
Ellen Russell (Program Office) 202–586–
9624 or Michael Skinker (Program
Attorney) 202–586–2793.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the FPA (16 U.S.C. 824a(e)).
On December 17, 2007, the
Department of Energy (DOE) received an
application from Nexen for authority to
transmit electric energy from the United
States to Canada as a power marketer.
VerDate Aug<31>2005
18:22 Jan 31, 2008
Jkt 214001
Nexen, a Delaware corporation with its
principal place of business in Calgary,
Alberta, Canada, has requested an
electricity export authorization with a 5year term. Nexen does not own or
control any electric generation,
transmission, or distribution assets
within the United States, nor does it
have a franchised service area in the
United States. The electric energy which
Nexen proposes to export to Canada
would be surplus energy purchased
from electric utilities, Federal power
marketing agencies, and other entities
within the United States.
Nexen will arrange for the delivery of
exports to Canada over the international
transmission facilities owned by Basin
Electric Power Cooperative, Bonneville
Power Administration, Eastern Maine
Electric Cooperative, International
Transmission Co., Joint Owners of the
Highgate Project, Long Sault, Inc.,
Maine Electric Power Company, Maine
Public Service Company, Minnesota
Power, Inc., Minnkota Power
Cooperative, Inc., New York Power
Authority, Niagara Mohawk Power
Corp., Northern States Power Company,
Vermont Electric Power Company, and
Vermont Electric Transmission Co.
The construction, operation,
maintenance, and connection of each of
the international transmission facilities
to be utilized by Nexen has previously
been authorized by a Presidential permit
issued pursuant to Executive Order
10485, as amended.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the Nexen application
to export electric energy to Canada
should be clearly marked with Docket
No. EA–332. Additional copies are to be
filed directly with Douglas F. John, John
& Hengerer, 1730 Rhode Island Ave.,
NW., Suite 600, Washington, DC 20036–
3116 and Diane Cameron, Director,
Regulatory, Nexen Marketing U.S.A.
INC., 801 7th Avenue, SW., Calgary, AB
T2P 3P7 Canada.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to the National Environmental Policy
Act of 1969, and a determination is
made by DOE that the proposed action
will not adversely impact on the
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
6171
reliability of the U.S. electric power
supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/permitting/
electricity_imports_exports.htm, or by emailing Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on January 29,
2008.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. E8–1917 Filed 1–31–08; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–337]
Application To Export Electric Energy;
Synergy Power Marketing, Inc.
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of application.
AGENCY:
SUMMARY: Synergy Power Marketing,
Inc. (Synergy) has applied for authority
to transmit electric energy from the
United States to Canada pursuant to
section 202(e) of the Federal Power Act.
DATES: Comments, protests, or requests
to intervene must be submitted on or
before February 19, 2008.
ADDRESSES: Comments, protests, or
requests to intervene should be
addressed as follows: Office of
Electricity Delivery and Energy
Reliability, Mail Code: OE–20, U.S.
Department of Energy, 1000
Independence Avenue, SW.,
Washington, DC 20585–0350 (FAX 202–
586–8008).
FOR FURTHER INFORMATION CONTACT:
Ellen Russell (Program Office) 202–586–
9624 or Michael Skinker (Program
Attorney) 202–586–2793.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the FPA (16 U.S.C. 824a(e)).
On January 28, 2008, the Department
of Energy (DOE) received an application
from Synergy for authority to transmit
electric energy from the United States to
Canada as a power marketer. Synergy, a
power marketer with its principal place
of business in Alberta, Canada, has
requested an electricity export
E:\FR\FM\01FEN1.SGM
01FEN1
mstockstill on PROD1PC66 with NOTICES
6172
Federal Register / Vol. 73, No. 22 / Friday, February 1, 2008 / Notices
authorization with a 5-year term.
Synergy does not own or control any
electric generation, transmission, or
distribution assets, nor does it have a
franchised service area. The electric
energy which Synergy proposes to
export to Canada would be surplus
energy purchased from electric utilities,
Federal power marketing agencies, and
other entities within the United States.
Synergy requests that consideration of
the application be expedited so that it
may participate in the Alberta market
that has recently experienced some
supply uncertainty and price volatility.
Specifically, Synergy requests that DOE
rule on its application prior to March 1,
2008.
Synergy will arrange for the delivery
of exports to Canada over the
international transmission facilities
owned by Basin Electric Power
Cooperative, Bonneville Power
Administration, Eastern Maine Electric
Cooperative, International Transmission
Co., Joint Owners of the Highgate
Project, Long Sault, Inc., Maine Electric
Power Company, Maine Public Service
Company, Minnesota Power, Inc.,
Minnkota Power Cooperative, Inc., New
York Power Authority, Niagara Mohawk
Power Corp., Northern States Power
Company, Vermont Electric Power
Company, and Vermont Electric
Transmission Co.
The construction, operation,
maintenance, and connection of each of
the international transmission facilities
to be utilized by Synergy has previously
been authorized by a Presidential permit
issued pursuant to Executive Order
10485, as amended.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
DOE has granted Synergy’s request for
expedited treatment of its application
and shortened the public comment
period to 15 days.
Comments on the Synergy application
to export electric energy to Canada
should be clearly marked with Docket
No. EA–337. Additional copies are to be
filed directly with Randall Dost, Sean
Pinnell, Synergy Power Marketing, Inc.,
Ste 800, 2303 4th Street, Calgary,
Alberta T2S 2S7 and Linda Williams,
518 Carolina Drive, Toccoa, GA 30577.
VerDate Aug<31>2005
18:22 Jan 31, 2008
Jkt 214001
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to the National Environmental Policy
Act of 1969, and a determination is
made by DOE that the proposed action
will not adversely impact on the
reliability of the U.S. electric power
supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/permitting/
electricity_imports_exports.htm, or by emailing Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on January 29,
2008.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. E8–1916 Filed 1–31–08; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Office of Energy Efficiency and
Renewable Energy
Notice of Opportunity for Technical
Assistance (NOTA)—DE–PS36–
08GO98011, Solar America Initiative
(SAI) Market Transformation: Solar
America Showcases, FY 2008
Office of Energy Efficiency and
Renewable Energy, Department of
Energy (DOE).
SUMMARY: The Department of Energy
(DOE) is accepting requests for
Technical Assistance for large-scale,
high-visibility solar installation projects
that have the ability to impact the
market for solar technologies through
large project size, use of a novel solar
technology, and/or use of a novel
application for a solar technology. In
addition, it is desired that the project be
replicable or have replicable
components. It is not expected that all
projects will meet all of these
parameters, but projects would ideally
reflect some or most of these qualities.
Large-scale installations may include
photovoltaic, concentrating solar power,
solar water heating, and solar space
heating applications. Technical
assistance will not be provided for
research, product development, or early
stage testing and evaluation of any
technology or product. Solar America
Showcases focus on providing support
to projects in which a commerciallyready technology is to be installed in a
large-scale application with full
AGENCY:
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
financial project commitment already in
place.
Any legal entity, to include private
sector for-profit and non-profit
organizations, State and local
governments, and trade and other
associations may request DOE Technical
Assistance under this Notice, so long as
the installation proposed by the
organization, and for which the
Technical Assistance will be provided,
is located in the United States. Federal
agencies are not permitted to request
Technical Assistance under this Notice.
Federally Funded Research and
Development Center (FFRDC)
Contractors may not submit a request for
Technical Assistance, may not
participate as a team partner with any
entity requesting Technical Assistance,
and may not assist any entity with their
submission of a request for Technical
Assistance under this Notice. Nonprofit
organizations described in section
501(c)(4) of the Internal Revenue Code
of 1986 that engaged in lobbying
activities after December 31, 1995 are
not permitted to submit a request for
Technical Assistance under this Notice.
Technical Assistance described under
this Notice will be provided via a
Memorandum of Agreement (MOA)
between DOE, the organization selected
to receive the Technical Assistance, and
the Technical Assistance Team Leader
responsible for providing the Technical
Assistance. A MOA is a collaborative
agreement between the Federal
Government and other parties to work
together on a mutually beneficial
activity. The MOA will detail the scope
of the Technical Assistance activities,
the forms of collaboration, the
responsibilities of the partners to the
Agreement, and the treatment of any
potential intellectual property. Federal
funding will not be provided to a
partner under a MOA.
DATES: Requests for Technical
Assistance must be submitted via the
DOE Industry Interactive Procurement
System (IIPS) Web site at
https://e-center.doe.gov/ by 03/12/2008
and 06/12/2008.
ADDRESSES: Note that this posting in the
Federal Register is not the full
announcement. Interested parties must
download and follow the instructions in
the full announcement which is
available on the DOE Industry
Interactive Procurement System (IIPS)
website. To locate the full
Announcement, go to
https://e-center.doe.gov/, click on
‘‘Browse Opportunities’’, scroll down to
view DOE Financial Assistance
Opportunities (Viewing ‘‘Opportunities
by Contracting Activity’’ is
E:\FR\FM\01FEN1.SGM
01FEN1
Agencies
[Federal Register Volume 73, Number 22 (Friday, February 1, 2008)]
[Notices]
[Pages 6171-6172]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1916]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-337]
Application To Export Electric Energy; Synergy Power Marketing,
Inc.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of application.
-----------------------------------------------------------------------
SUMMARY: Synergy Power Marketing, Inc. (Synergy) has applied for
authority to transmit electric energy from the United States to Canada
pursuant to section 202(e) of the Federal Power Act.
DATES: Comments, protests, or requests to intervene must be submitted
on or before February 19, 2008.
ADDRESSES: Comments, protests, or requests to intervene should be
addressed as follows: Office of Electricity Delivery and Energy
Reliability, Mail Code: OE-20, U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585-0350 (FAX 202-586-8008).
FOR FURTHER INFORMATION CONTACT: Ellen Russell (Program Office) 202-
586-9624 or Michael Skinker (Program Attorney) 202-586-2793.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the FPA (16 U.S.C. 824a(e)).
On January 28, 2008, the Department of Energy (DOE) received an
application from Synergy for authority to transmit electric energy from
the United States to Canada as a power marketer. Synergy, a power
marketer with its principal place of business in Alberta, Canada, has
requested an electricity export
[[Page 6172]]
authorization with a 5-year term. Synergy does not own or control any
electric generation, transmission, or distribution assets, nor does it
have a franchised service area. The electric energy which Synergy
proposes to export to Canada would be surplus energy purchased from
electric utilities, Federal power marketing agencies, and other
entities within the United States.
Synergy requests that consideration of the application be expedited
so that it may participate in the Alberta market that has recently
experienced some supply uncertainty and price volatility. Specifically,
Synergy requests that DOE rule on its application prior to March 1,
2008.
Synergy will arrange for the delivery of exports to Canada over the
international transmission facilities owned by Basin Electric Power
Cooperative, Bonneville Power Administration, Eastern Maine Electric
Cooperative, International Transmission Co., Joint Owners of the
Highgate Project, Long Sault, Inc., Maine Electric Power Company, Maine
Public Service Company, Minnesota Power, Inc., Minnkota Power
Cooperative, Inc., New York Power Authority, Niagara Mohawk Power
Corp., Northern States Power Company, Vermont Electric Power Company,
and Vermont Electric Transmission Co.
The construction, operation, maintenance, and connection of each of
the international transmission facilities to be utilized by Synergy has
previously been authorized by a Presidential permit issued pursuant to
Executive Order 10485, as amended.
Procedural Matters: Any person desiring to become a party to these
proceedings or to be heard by filing comments or protests to this
application should file a petition to intervene, comment, or protest at
the address provided above in accordance with Sec. Sec. 385.211 or
385.214 of the Federal Energy Regulatory Commission's Rules of Practice
and Procedures (18 CFR 385.211, 385.214). Fifteen copies of each
petition and protest should be filed with DOE on or before the date
listed above.
DOE has granted Synergy's request for expedited treatment of its
application and shortened the public comment period to 15 days.
Comments on the Synergy application to export electric energy to
Canada should be clearly marked with Docket No. EA-337. Additional
copies are to be filed directly with Randall Dost, Sean Pinnell,
Synergy Power Marketing, Inc., Ste 800, 2303 4th Street, Calgary,
Alberta T2S 2S7 and Linda Williams, 518 Carolina Drive, Toccoa, GA
30577.
A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to the National
Environmental Policy Act of 1969, and a determination is made by DOE
that the proposed action will not adversely impact on the reliability
of the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://www.oe.energy.gov/permitting/
electricity_imports_exports.htm, or by e-mailing Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on January 29, 2008.
Anthony J. Como,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. E8-1916 Filed 1-31-08; 8:45 am]