Green Wave Energy Solutions, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene, Protests, and Comments, 5533-5534 [E8-1634]
Download as PDF
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
k. Description of Project: The
proposed project would consist of the
following six developments:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Nehalen Development
[Project No. 13047–000]
Green Wave Energy Solutions, LLC;
Notice of Application Accepted for
Filing and Soliciting Motions To
Intervene, Protests, and Comments
mstockstill on PROD1PC66 with NOTICES
January 24, 2008.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: 13047–000.
c. Date Filed: October 1, 2007.
d. Applicant: Tillamook
Intergovernmental Development Entity.
e. Name of Project: Oregon Coastal
Wave Energy Project.
f. Location: The project would be
located in the Pacific Ocean in
Tillamook County, Oregon.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contacts: Patrick Ashby,
Tillamook Intergovernmental
Development Entity, C/O Tillamook
People’s Utility District, 1115 Pacific
Avenue, Tillamook, OR 97141, phone:
(503)–842–2535.
i. FERC Contact: Robert Bell, (202)
502–6062.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
13047–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
VerDate Aug<31>2005
18:49 Jan 29, 2008
Jkt 214001
(1) 5 to 90 wave buoys generators
having a total installed capacity of 20 to
180 megawatts, (2) a proposed 24.9
kilovolt transmission line, and (3)
appurtenant facilities. The project is
estimated to have an average annual
generation from 87.5 to 790 gigawatthours, which would be sold to a local
utility.
Kockaway Development
(1) 5 to 90 wave buoys generators
having a total installed capacity of 20 to
180 megawatts, (2) a proposed 24.9
kilovolt transmission line, and (3)
appurtenant facilities. The project is
estimated to have an average annual
generation from 87.5 to 790 gigawatthours, which would be sold to a local
utility.
Garibaldi Development
(1) 5 to 90 wave buoys generators
having a total installed capacity of 20 to
180 megawatts, (2) a proposed 24.9
kilovolt transmission line, and (3)
appurtenant facilities. The project is
estimated to have an average annual
generation from 87.5 to 790 gigawatthours, which would be sold to a local
utility.
Netarts Development
(1) 5 to 90 wave buoys generators
having a total installed capacity of 20 to
180 megawatts, (2) a proposed 24.9
kilovolt transmission line, and (3)
appurtenant facilities. The project is
estimated to have an average annual
generation from 87.5 to 790 gigawatthours, which would be sold to a local
utility.
Nectucci Development
(1) 5 to 90 wave buoys generators
having a total installed capacity of 20 to
180 megawatts, (2) a proposed 24.9
kilovolt transmission line; and (3)
appurtenant facilities. The project is
estimated to have an average annual
generation from 87.5 to 790 gigawatthours, which would be sold to a local
utility.
Neskowin Development
(1) 5 to 90 wave buoys generators
having a total installed capacity of 20 to
180 megawatts, (2) a proposed 24.9
kilovolt transmission line; and (3)
appurtenant facilities. The project is
estimated to have an average annual
generation from 87.5 to 790 gigawatthours, which would be sold to a local
utility.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
5533
l. Locations of Applications: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30(b) and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30(b) and 4.36.
p. Notice of Intent: A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
E:\FR\FM\30JAN1.SGM
30JAN1
mstockstill on PROD1PC66 with NOTICES
5534
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper; See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under ‘‘efiling’’ link. The Commission strongly
encourages electronic filing.
s. Filing and Service of Responsive
Documents: Any filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’,
‘‘PROTEST’’,‘‘COMPETING
APPLICATION’’ OR ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
t. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
VerDate Aug<31>2005
18:49 Jan 29, 2008
Jkt 214001
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–1634 Filed 1–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12972–000]
Little River Hydro, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
January 24, 2008.
Take notice that the following
hydroelectric applications have been
filed with the Commission and are
available for public inspection:
a. Type of Application: Preliminary
Permit.
b. Project No.: P–12972–000.
c. Date Filed: August 31, 2007.
d. Applicant: Little River Hydro, LLC.
e. Name of the Project: Millwood Dam
Hydroelectric.
f. Location: The project would be
located on the Little River in Little River
County, Arkansas. The Millwood Dam is
owned and maintained by the U.S.
Army Corps of Engineers.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a—825r.
h. Applicant Contact: Mr. Brent
Smith, Symbiotics, LLC, P.O. Box 535,
Rigby, ID 83442, Phone (208) 745–0834.
i. FERC Contact: Patricia W. Gillis,
(202) 502–8735.
j. Deadline for filing comments,
protests, and motions to intervene: 60
days from the issuance date of this
notice.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and interventions
may be filed electronically via the
Internet in lieu of paper; see 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. The Commission
strongly encourages electronic filings.
Please include the project number (P–
12972–000) on any comments or
motions filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person in the official service list
PO 00000
Frm 00041
Fmt 4703
Sfmt 4703
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would utilize the
existing U.S. Army Corps of Engineers’
Millwood Dam and would consist of: (1)
Three proposed 300-foot-long, 144-inchdiameter steel penstocks; (2) a proposed
powerhouse containing two generating
units with a total installed capacity of
18-megawatts; (3) a proposed
switchyard; (4) a proposed 0.1-milelong, 25-kV transmission line; and (5)
appurtenant facilities. The proposed
project would have an estimated annual
generation of approximately 39gigawatts and would be sold to a local
utility.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit:
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
o. Competing Development
Application: Any qualified development
applicant desiring to file a competing
development application must submit to
the Commission, on or before a
specified comment date for the
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 73, Number 20 (Wednesday, January 30, 2008)]
[Notices]
[Pages 5533-5534]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1634]
[[Page 5533]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13047-000]
Green Wave Energy Solutions, LLC; Notice of Application Accepted
for Filing and Soliciting Motions To Intervene, Protests, and Comments
January 24, 2008.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: 13047-000.
c. Date Filed: October 1, 2007.
d. Applicant: Tillamook Intergovernmental Development Entity.
e. Name of Project: Oregon Coastal Wave Energy Project.
f. Location: The project would be located in the Pacific Ocean in
Tillamook County, Oregon.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contacts: Patrick Ashby, Tillamook Intergovernmental
Development Entity, C/O Tillamook People's Utility District, 1115
Pacific Avenue, Tillamook, OR 97141, phone: (503)-842-2535.
i. FERC Contact: Robert Bell, (202) 502-6062.
j. Deadline for filing comments, protests, and motions to
intervene: 60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426. Comments, protests, and
interventions may be filed electronically via the Internet in lieu of
paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site under the ``e-Filing'' link. The Commission
strongly encourages electronic filings. Please include the project
number (P-13047-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person in the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
k. Description of Project: The proposed project would consist of
the following six developments:
Nehalen Development
(1) 5 to 90 wave buoys generators having a total installed capacity
of 20 to 180 megawatts, (2) a proposed 24.9 kilovolt transmission line,
and (3) appurtenant facilities. The project is estimated to have an
average annual generation from 87.5 to 790 gigawatt-hours, which would
be sold to a local utility.
Kockaway Development
(1) 5 to 90 wave buoys generators having a total installed capacity
of 20 to 180 megawatts, (2) a proposed 24.9 kilovolt transmission line,
and (3) appurtenant facilities. The project is estimated to have an
average annual generation from 87.5 to 790 gigawatt-hours, which would
be sold to a local utility.
Garibaldi Development
(1) 5 to 90 wave buoys generators having a total installed capacity
of 20 to 180 megawatts, (2) a proposed 24.9 kilovolt transmission line,
and (3) appurtenant facilities. The project is estimated to have an
average annual generation from 87.5 to 790 gigawatt-hours, which would
be sold to a local utility.
Netarts Development
(1) 5 to 90 wave buoys generators having a total installed capacity
of 20 to 180 megawatts, (2) a proposed 24.9 kilovolt transmission line,
and (3) appurtenant facilities. The project is estimated to have an
average annual generation from 87.5 to 790 gigawatt-hours, which would
be sold to a local utility.
Nectucci Development
(1) 5 to 90 wave buoys generators having a total installed capacity
of 20 to 180 megawatts, (2) a proposed 24.9 kilovolt transmission line;
and (3) appurtenant facilities. The project is estimated to have an
average annual generation from 87.5 to 790 gigawatt-hours, which would
be sold to a local utility.
Neskowin Development
(1) 5 to 90 wave buoys generators having a total installed capacity
of 20 to 180 megawatts, (2) a proposed 24.9 kilovolt transmission line;
and (3) appurtenant facilities. The project is estimated to have an
average annual generation from 87.5 to 790 gigawatt-hours, which would
be sold to a local utility.
l. Locations of Applications: A copy of the application is
available for inspection and reproduction at the Commission in the
Public Reference Room, located at 888 First Street, NE., Room 2A,
Washington DC 20426, or by calling (202) 502-8371. This filing may also
be viewed on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item h
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Competing Preliminary Permit: Anyone desiring to file a
competing application for preliminary permit for a proposed project
must submit the competing application itself, or a notice of intent to
file such an application, to the Commission on or before the specified
comment date for the particular application (see 18 CFR 4.36).
Submission of a timely notice of intent allows an interested person to
file the competing preliminary permit application no later than 30 days
after the specified comment date for the particular application. A
competing preliminary permit application must conform with 18 CFR
4.30(b) and 4.36.
o. Competing Development Application: Any qualified development
applicant desiring to file a competing development application must
submit to the Commission, on or before a specified comment date for the
particular application, either a competing development application or a
notice of intent to file such an application. Submission of a timely
notice of intent to file a development application allows an interested
person to file the competing application no later than 120 days after
the specified comment date for the particular application. A competing
license application must conform with 18 CFR 4.30(b) and 4.36.
p. Notice of Intent: A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit, if such an application may be filed, either a preliminary
permit application or a development application (specify which type of
application). A notice of intent must be
[[Page 5534]]
served on the applicant(s) named in this public notice.
q. Proposed Scope of Studies under Permit: A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
r. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper; See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under ``e-filing'' link.
The Commission strongly encourages electronic filing.
s. Filing and Service of Responsive Documents: Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'',``COMPETING APPLICATION'' OR
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number
of copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
t. Agency Comments: Federal, State, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-1634 Filed 1-29-08; 8:45 am]
BILLING CODE 6717-01-P