Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
to serve a copy of that document on
each person in the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. Description of Project: The
proposed project would utilize the
existing U.S. Army Corps of Engineers’
Wright Patman Dam and would consist
of: (1) A proposed 339-foot-long, 144inch-diameter steel penstock; (2) a
proposed powerhouse containing one
generating unit with an installed
capacity of 5-megawatts; (3) a
switchyard; (4) a proposed 2-mile-long,
25-kV transmission line; and (5)
appurtenant facilities. The proposed
project would have an estimated annual
generation of approximately 16gigawatts and would be sold to a local
utility.
l. Location of Application: A copy of
the application is available for
inspection and reproduction at the
Commission in the Public Reference
Room, located at 888 First Street, NE.,
Room 2A, Washington, DC 20426, or by
calling (202) 502–8371. This filing may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item h
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Competing Preliminary Permit—
Anyone desiring to file a competing
application for preliminary permit for a
proposed project must submit the
competing application itself, or a notice
of intent to file such an application, to
the Commission on or before the
specified comment date for the
particular application (see 18 CFR 4.36).
Submission of a timely notice of intent
allows an interested person to file the
competing preliminary permit
application no later than 30 days after
the specified comment date for the
particular application. A competing
preliminary permit application must
conform with 18 CFR 4.30 and 4.36.
o. Competing Development
Application—Any qualified
development applicant desiring to file a
competing development application
VerDate Aug<31>2005
18:49 Jan 29, 2008
Jkt 214001
must submit to the Commission, on or
before a specified comment date for the
particular application, either a
competing development application or a
notice of intent to file such an
application. Submission of a timely
notice of intent to file a development
application allows an interested person
to file the competing application no
later than 120 days after the specified
comment date for the particular
application. A competing license
application must conform with 18 CFR
4.30 and 4.36.
p. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
an unequivocal statement of intent to
submit, if such an application may be
filed, either a preliminary permit
application or a development
application (specify which type of
application). A notice of intent must be
served on the applicant(s) named in this
public notice.
q. Proposed Scope of Studies Under
Permit—A preliminary permit, if issued,
does not authorize construction. The
term of the proposed preliminary permit
would be 36 months. The work
proposed under the preliminary permit
would include economic analysis,
preparation of preliminary engineering
plans, and a study of environmental
impacts. Based on the results of these
studies, the Applicant would decide
whether to proceed with the preparation
of a development application to
construct and operate the project.
r. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Comments, protests and interventions
may be filed electronically via the
Internet in lieu of paper. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link.
s. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT
TO FILE COMPETING APPLICATION’’,
‘‘COMPETING APPLICATION’’,
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
‘‘PROTEST’’, and ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
Any of the above-named documents
must be filed by providing the original
and the number of copies provided by
the Commission’s regulations to: The
Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426. An additional
copy must be sent to Director, Division
of Hydropower Administration and
Compliance, Federal Energy Regulatory
Commission, at the above-mentioned
address. A copy of any notice of intent,
competing application or motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
t. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–1631 Filed 1–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–52–000]
Caledonia Energy Partners, L.L.C.;
Notice of Application
January 24, 2008.
Take notice that on January 14, 2008,
Caledonia Energy Partners, L.L.C.
(Caledonia), 2001 Timber Creek Road,
Flower Mound, TX 75028, filed in
Docket No. CP08–52–000, an
application under section 7(c) of the
Natural Gas Act (NGA), to expand the
Caledonia Storage Facility by
developing a depleted production
reservoir as an additional gas storage
field; constructing a pipeline lateral to
connect the new field with the existing
storage facility; and installation of a
total of 10,000 Hp of additional
compression which will allow
Caledonia to increase its maximum
allowable operating pressure to 2,518
psia. The expanded facilities will
increase Caledonia’s maximum total
storage capacity from 11.7 Bcf to 16.9
Bcf and its maximum daily withdrawal
E:\FR\FM\30JAN1.SGM
30JAN1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
rate from 330 MMcf/d to 477 MMcf/d,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits,
in the docket number field to access the
document. For assistance, call (202)
502–8659 or TTY, (202) 208–3676.
Any questions regarding this
application should be directed to Jim
Goetz, Caledonia Energy Partners,
L.L.C., 2001 Timber Creek Road, Flower
Mound, Texas 75028, at (972) 691–3332,
or by fax at (972) 874–8743, or
Christopher A. Schindler, Hogan &
Hartson L.L.P., 555 Thirteenth Street,
NW., Washington, DC 20004, at (202)
637–5723, or by fax at (202) 637–5910.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
VerDate Aug<31>2005
18:49 Jan 29, 2008
Jkt 214001
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
5539
Comment Date: February 14, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–1623 Filed 1–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI08–1–000]
City of Aspen; Notice of Declaration of
Intention and Soliciting Comments,
Protests, and/or Motions To Intervene
January 24, 2008.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No: DI08–1–000.
c. Date Filed: January 7, 2008.
d. Applicant: City of Aspen, CO.
e. Name of Project: Castle Creek
Hydroelectric Project.
f. Location: The proposed Castle
Creek Hydroelectric Project will be
located on Castle Creek within the city
of Aspen’s existing water transmission
system, in Pitkin County, in Aspen,
Colorado.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Richard Smart,
Community Hydropower Consulting,
LLC, P. O. Box 1091, Fort Collins, CO
80522; telephone: (970) 221–4474; fax:
(970) 221–0095; e-mail: https://www.r_
smart@communityhydro.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or E-mail
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: February 25,
2008.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Comments, protests, and/or
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling link. Please include the docket
number (DI08–1–000) on any comments,
protests, and/or motions filed.
k. Description of Project: The
proposed Castle Creek Hydroelectric
Project will include: (1) A run-of-river
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 73, Number 20 (Wednesday, January 30, 2008)]
[Notices]
[Pages 5538-5539]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1623]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-52-000]
Caledonia Energy Partners, L.L.C.; Notice of Application
January 24, 2008.
Take notice that on January 14, 2008, Caledonia Energy Partners,
L.L.C. (Caledonia), 2001 Timber Creek Road, Flower Mound, TX 75028,
filed in Docket No. CP08-52-000, an application under section 7(c) of
the Natural Gas Act (NGA), to expand the Caledonia Storage Facility by
developing a depleted production reservoir as an additional gas storage
field; constructing a pipeline lateral to connect the new field with
the existing storage facility; and installation of a total of 10,000 Hp
of additional compression which will allow Caledonia to increase its
maximum allowable operating pressure to 2,518 psia. The expanded
facilities will increase Caledonia's maximum total storage capacity
from 11.7 Bcf to 16.9 Bcf and its maximum daily withdrawal
[[Page 5539]]
rate from 330 MMcf/d to 477 MMcf/d, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. This filing may also be viewed on the Commission's Web site
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits, in the docket number field to
access the document. For assistance, call (202) 502-8659 or TTY, (202)
208-3676.
Any questions regarding this application should be directed to Jim
Goetz, Caledonia Energy Partners, L.L.C., 2001 Timber Creek Road,
Flower Mound, Texas 75028, at (972) 691-3332, or by fax at (972) 874-
8743, or Christopher A. Schindler, Hogan & Hartson L.L.P., 555
Thirteenth Street, NW., Washington, DC 20004, at (202) 637-5723, or by
fax at (202) 637-5910.
Pursuant to Section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit 14 copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: February 14, 2008.
Kimberly D. Bose,
Secretary.