Dominion Transmission Incorporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Utica 7 Project and Request for Comments on Environmental Issues, 5544-5546 [E8-1622]
Download as PDF
5544
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
be fulfilled through the programmatic
agreement, which the Commission
proposes to draft in consultation with
certain parties listed below. The
executed programmatic agreement
would be incorporated into any Order
issuing a license.
Crisp County Power Commission, as
licensee for Lake Blackshear
Hydroelectric Project No. 659, the
Alabama-Quassarte Tribal Town, and
the Seminole Tribe of Florida have
expressed an interest in this preceding
and are invited to participate in
Don Klima or Representative, Advisory Council on Historic Preservation, The Old Post Office Building, Suite 803, 1100 Pennsylvania Avenue, NW., Washington, DC 20004.
Steve Rentfrow, Manager or Representative, Crisp County Power Commission, 202 7th Street South, P.O. Box 1218, Cordele, GA 31010.
Willard Steele, Seminole Tribe of Florida, Ah-Tah-Thi-Ki Museum, HC
61, Box 21 A, Clewiston, FL 33440.
mstockstill on PROD1PC66 with NOTICES
Any person on the official service list
for the above-captioned proceeding may
request inclusion on the restricted
service list, or may request that a
restricted service list not be established,
by filing a motion to that effect within
15 days of this notice date. In a request
for inclusion, please identify the
reason(s) why there is an interest to be
included. Also please identify any
concerns about historic properties,
including Traditional Cultural
Properties. If historic properties are to
be identified within the motion, please
use a separate page, and label it NONPUBLIC Information.
An original and 8 copies of any such
motion must be filed with Kimberly D.
Bose, the Secretary of the Commission
(888 First Street, NE., Washington, DC
20426) and must be served on each
person whose name appears on the
official service list. Please put the
project name ‘‘Lake Blackshear Project’’
and number ‘‘P–659–014’’ on the front
cover of any motion. Motions may be
filed electronically via the Internet in
lieu of paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the ‘‘eFiling’’ link.
If no such motions are filed, the
restricted service list will be effective at
the end of the 15-day period. Otherwise,
a further notice will be issued ruling on
any motion or motions filed within the
15-day period.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–1637 Filed 1–29–08; 8:45 am]
BILLING CODE 6717–01–P
VerDate Aug<31>2005
18:49 Jan 29, 2008
Jkt 214001
consultations to develop the
programmatic agreement.
For purposes of commenting on the
programmatic agreement, we propose to
restrict the service list for the
aforementioned project as follows:
Tim Bachelder, Devine Tarbell & Associates, 970 Baxter Boulevard,
Portland, ME 04103.
Elizabeth Shirk or Representative, Georgia Department of Natural Resources, Historic Preservation Division, 34 Peachtree Street, NW.,
Suite 1600, Atlanta, GA 30303–2316.
Augustine Asbury, Alabama-Quassarte Tribal Town, P.O. Box 187,
Wetumka, OK 74883.
Dominion Transmission Incorporation;
Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Utica 7 Project and Request
for Comments on Environmental
Issues
and to encourage them to comment on
their areas of concern.
A fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ addresses a number of
typically asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is available for viewing
on the FERC Internet Web site (https://
www.ferc.gov).
January 24, 2008.
Summary of the Proposed Project
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP08–45–000]
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Dominion Transmission
Incorporation (DTI) Project involving
the addition of a compressor unit at its
existing Utica Compressor Stations,
located at New Hartford, Herkimer
County, New York. The EA will be used
by the Commission in its decisionmaking process to determine whether
the project is in the public convenience
and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help determine which
issues need to be evaluated in the EA.
Please note that the scoping period will
close on February 25, 2008. Details on
how to submit comments are provided
in the Public Participation section of
this notice.
This notice is being sent to affected
landowners; federal, state, and local
government agencies; elected officials;
Native American tribes; other interested
parties; and local libraries and
newspapers. State and local government
representatives are asked to notify their
constituents of this proposed project
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
DTI proposes to install an additional
compressor unit at its existing Utica
Compressor Station to provide new firm
transportation service for a new
customer while maintaining reliability
in meeting all existing service
entitlement on the northeastern portion
of DTI’s transmission system. The
project would be located in New
Harford, Herkimer County, New York.
Modification of the Utica Compressor
Station will include the installation of:
• One natural gas-fired, reciprocating
internal combustion engine with a
nominal 2,250 HP rating.
All project activities would be
contained within the property boundary
for DTI’s Utica Compressor Station.
Approximately five acres of this facility
would be utilized for project activities.
The general location of the proposed
facilities is shown in Appendix 1.1
1 The appendices referenced in this notice are not
being printed in the Federal Register. Copies of all
appendices are available on the Commission’s Web
site at the ‘‘eLibrary’’ link or from the Commission’s
Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502–8371. For
instructions on connecting to eLibrary refer to the
‘‘Additional Information’’ section of this notice.
Copies of the appendices were sent to all those
receiving this notice in the mail. Requests for
detailed maps of the proposed facilities should be
made directly to El Paso.
E:\FR\FM\30JAN1.SGM
30JAN1
mstockstill on PROD1PC66 with NOTICES
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
The EA Process
We 2 are preparing this EA to comply
with the National Environmental Policy
Act (NEPA) which requires the
Commission to take into account the
environmental impact that could result
if it authorizes El Paso’s proposal. By
this notice, we are also asking federal,
state, and local agencies with
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA.
With this notice, we are asking
federal, state, and local agencies with
jurisdiction and/or special expertise
with respect to environmental issues to
formally cooperate with us in the
preparation of the EA. These agencies
may choose to participate once they
have evaluated the proposal relative to
their responsibilities. Additional
agencies that would like to request
cooperating agency status should follow
the instructions for filing comments
provided under the Public Participation
section of this notice.
NEPA also requires the FERC to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
Notice of Intent, we are requesting
public comments on the scope of the
issues to address in the EA. All
comments received are considered
during the preparation of the EA.
The EA will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils.
• Land use.
• Water resources, fisheries, and
wetlands.
• Cultural resources.
• Vegetation and wildlife.
• Air quality and noise.
• Endangered and threatened species.
We will also evaluate possible
alternatives to the proposed project or
portions of the project, where necessary,
and make recommendations on how to
lessen or avoid impacts on the various
resource areas.
Our independent analysis of the
issues will be in the EA. Depending on
the comments received during the
scoping process, the EA may be
published and mailed to federal, state,
and local agencies, public interest
groups, interested individuals, affected
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the FERC’s Office of Energy
Projects.
VerDate Aug<31>2005
18:49 Jan 29, 2008
Jkt 214001
landowners, newspapers, libraries, and
the Commission’s official service list for
this proceeding. A comment period will
be allotted for review if the EA is
published. We will consider all
comments on the EA before we make
our recommendations to the
Commission.
To ensure your comments are
considered, please carefully follow the
instructions in the Public Participation
section below.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
By becoming a commentor, your
concerns will be addressed in the EA
and considered by the Commission. You
should focus on the potential
environmental effects of the proposal,
alternatives to the proposal including
alternative compressor station sites, and
measures to avoid or lessen
environmental impact. The more
specific your comments, the more useful
they will be. Please carefully follow
these instructions to ensure that your
comments are received in time and
properly recorded:
• Send an original and two copies of
your letter to: Kimberley D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First St., NE., Room
1A, Washington, DC 20426;
• Label one copy of the comments for
the attention of Gas Branch 2, PJ–11.2;
• Reference Docket No. CP08–45–
000; and
• Mail your comments so that they
will be received in Washington, DC on
or before February 25, 2008.
The Commission encourages
electronic filing of comments. See 18
Code of Federal Regulations
385.2001(a)(1)(iii) and the instructions
on the Commission’s Internet Web site
at https://www.ferc.gov under the
‘‘eFiling’’ link and the link to the User’s
Guide. Prepare your submission in the
same manner as you would if filing on
paper and save it to a file on your hard
drive. Before you can file comments you
will need to create an account by
clicking on ‘‘Login to File’’ and then
‘‘New User Account.’’ You will be asked
to select the type of filing you are
making. This filing is considered a
‘‘Comment on Filing.’’
We may mail the EA for public
comment. If you are interested in
receiving it, please return the
Information Request (Appendix 2). If
you do not return the Information
Request, you will be taken off the
mailing list.
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
5545
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an official party to the
proceeding, or ‘‘intervenor’’. To become
an intervenor you must file a motion to
intervene according to Rule 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214). Intervenors
have the right to seek rehearing of the
Commission’s decision. Motions to
Intervene should be electronically
submitted using the Commission’s
eFiling system at https://www.ferc.gov.
Persons without Internet access should
send an original and 14 copies of their
motion to the Secretary of the
Commission at the address indicated
previously. Persons filing Motions to
Intervene on or before the comment
deadline indicated above must send a
copy of the motion to the Applicant. All
filings, including late interventions,
submitted after the comment deadline
must be served on the Applicant and all
other intervenors identified on the
Commission’s service list for this
proceeding. Persons on the service list
with e-mail addresses may be served
electronically; others must be served a
hard copy of the filing.
Affected landowners and parties with
environmental concerns may be granted
intervenor status upon showing good
cause by stating that they have a clear
and direct interest in this proceeding
which would not be adequately
represented by any other parties. You do
not need intervenor status to have your
environmental comments considered.
Environmental Mailing List
An effort is being made to send this
notice to all individuals, organizations,
and government entities interested in
and/or potentially affected by the
proposed project. This includes all
landowners who own homes within
distances defined in the Commission’s
regulations of certain aboveground
facilities.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at 1–866–208–FERC or on the FERC
Internet Web site (https://www.ferc.gov)
using the ‘‘eLibrary’’ link. Click on the
eLibrary link, then on ‘‘General Search’’
and enter the docket number excluding
the last three digits in the Docket
Number field. Be sure you have selected
an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for
TTY, contact (202) 502–8659. The
E:\FR\FM\30JAN1.SGM
30JAN1
5546
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries and direct links to
the documents. Go to https://
www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at https://www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–1622 Filed 1–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–53–001]
Downeast Pipeline, LLC; Notice of
Amendment
mstockstill on PROD1PC66 with NOTICES
January 24, 2007.
Take notice that on January 16, 2007,
Downeast Pipeline, LLC (Downeast
Pipeline), PO Box 865, Calais, Maine
04619, filed, in Docket No. CP07–53–
001, an application to amend its
pending application for a Certificate of
Public Convenience and Necessity
pursuant to section 7(c) of the Natural
Gas Act (NGA) filed with the
Commission on December 22, 2006.
Downeast Pipeline proposes to amend
its application to reflect a modification
to its originally proposed pipeline route
in order to avoid crossing the
Moosehorn National Wildlife Refuge
which is owned and managed by the
U.S. Fish and Wildlife Service. The
modification proposed by Downeast
Pipeline affects 7.5 miles of the
originally proposed 31-mile-long route
and extends from milepost 10.2 to
milepost 17.7, all as more fully set forth
in the application which is on file with
the Commission and open to public
inspection. The Commission staff will
determine if this amendment will have
an effect on the schedule for the
environmental review of this project. A
Notice of Schedule for Environmental
Review will be issued when
Commission staff has received all the
VerDate Aug<31>2005
18:49 Jan 29, 2008
Jkt 214001
information necessary in order to
complete the draft EIS.
Any questions regarding this
application should be directed to Robert
Wyatt, Downeast LNG, Inc., PO Box 865,
Calais, ME 04619 or Lisa M. Tonery,
Fulbright & Jaworski, 666 Fifth Avenue,
New York, NY 10103–3198, (212) 318–
3009.
This filing is available for review at
the Commission’s Washington, DC
office or may be viewed on the
Commission’s Web site at https://
www.ferc.gov/ using the ‘‘e-Library’’
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC Online Support at
ferconlinesupport@ferc.gov or
Telephone: 202–502–6652; Toll-free: 1–
866–208–3676; or for TTY, contact (202)
502–8659.
There are two ways to become
involved in the Commission’s review of
this Project. First, any person wishing to
obtain legal status by becoming a party
to the proceeding for this project should
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10) by the
comment date, below. A person
obtaining party status will be placed on
the service list maintained by the
Secretary of the Commission and will
receive copies of all documents filed by
the applicant and by all other parties. A
party must submit 14 copies of filings
made with the Commission and must
mail a copy to the applicant and to
every other party in the proceeding.
Only parties to the proceeding can ask
for court review of Commission orders
in the proceeding.
However, a person does not have to
intervene to have comments considered.
The second way to participate is by
filing with the Secretary of the
Commission, as soon as possible, an
original and two copies of comments in
support of or in opposition to this
project and/or associated pipeline. The
Commission will consider these
comments in determining the
appropriate action to be taken, but the
filing of a comment alone will not serve
to make the filer a party to the
proceeding. The Commission’s rules
require that persons filing comments in
opposition to the project provide copies
of their protests only to the party or
parties directly involved in the protest.
Persons who wish to comment only
on the environmental review of this
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Protests and interventions may be
filed electronically via the Internet in
lieu of paper; see 18 CFR
285.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-filing’’ link. The Commission
strongly encourages electronic filings.
Comment Date: February 21, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E8–1621 Filed 1–29–08; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER07–1249–000, ER07–1249–
001, ER07–1249–002, ER07–1249–003]
Lockport Energy Associates, L.P.;
Notice of Issuance of Order
January 23, 2008.
Lockport Energy Associates, L.P.
(Lockport) filed an application for
market-based rate authority, with an
accompanying rate schedule. The
proposed market-based rate schedule
provides for the sale of energy, capacity
and ancillary services at market-based
rates. Lockport also requested waivers of
various Commission regulations. In
particular, Lockport requested that the
Commission grant blanket approval
under 18 CFR part 34 of all future
issuances of securities and assumptions
of liability by Lockport.
On January 23, 2008, pursuant to
delegated authority, the Director,
Division of Tariffs and Market
Development—West, granted the
requests for blanket approval under part
34 (Director’s Order). The Director’s
Order also stated that the Commission
would publish a separate notice in the
E:\FR\FM\30JAN1.SGM
30JAN1
Agencies
[Federal Register Volume 73, Number 20 (Wednesday, January 30, 2008)]
[Notices]
[Pages 5544-5546]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E8-1622]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP08-45-000]
Dominion Transmission Incorporation; Notice of Intent To Prepare
an Environmental Assessment for the Proposed Utica 7 Project and
Request for Comments on Environmental Issues
January 24, 2008.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Dominion Transmission
Incorporation (DTI) Project involving the addition of a compressor unit
at its existing Utica Compressor Stations, located at New Hartford,
Herkimer County, New York. The EA will be used by the Commission in its
decision-making process to determine whether the project is in the
public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help determine which issues
need to be evaluated in the EA. Please note that the scoping period
will close on February 25, 2008. Details on how to submit comments are
provided in the Public Participation section of this notice.
This notice is being sent to affected landowners; federal, state,
and local government agencies; elected officials; Native American
tribes; other interested parties; and local libraries and newspapers.
State and local government representatives are asked to notify their
constituents of this proposed project and to encourage them to comment
on their areas of concern.
A fact sheet prepared by the FERC entitled ``An Interstate Natural
Gas Facility On My Land? What Do I Need To Know?'' addresses a number
of typically asked questions, including the use of eminent domain and
how to participate in the Commission's proceedings. It is available for
viewing on the FERC Internet Web site (https://www.ferc.gov).
Summary of the Proposed Project
DTI proposes to install an additional compressor unit at its
existing Utica Compressor Station to provide new firm transportation
service for a new customer while maintaining reliability in meeting all
existing service entitlement on the northeastern portion of DTI's
transmission system. The project would be located in New Harford,
Herkimer County, New York. Modification of the Utica Compressor Station
will include the installation of:
One natural gas-fired, reciprocating internal combustion
engine with a nominal 2,250 HP rating.
All project activities would be contained within the property
boundary for DTI's Utica Compressor Station. Approximately five acres
of this facility would be utilized for project activities.
The general location of the proposed facilities is shown in
Appendix 1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies of all appendices are
available on the Commission's Web site at the ``eLibrary'' link or
from the Commission's Public Reference Room, 888 First Street, NE.,
Washington, DC 20426, or call (202) 502-8371. For instructions on
connecting to eLibrary refer to the ``Additional Information''
section of this notice. Copies of the appendices were sent to all
those receiving this notice in the mail. Requests for detailed maps
of the proposed facilities should be made directly to El Paso.
---------------------------------------------------------------------------
[[Page 5545]]
The EA Process
We \2\ are preparing this EA to comply with the National
Environmental Policy Act (NEPA) which requires the Commission to take
into account the environmental impact that could result if it
authorizes El Paso's proposal. By this notice, we are also asking
federal, state, and local agencies with jurisdiction and/or special
expertise with respect to environmental issues to formally cooperate
with us in the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the FERC's Office of Energy Projects.
---------------------------------------------------------------------------
With this notice, we are asking federal, state, and local agencies
with jurisdiction and/or special expertise with respect to
environmental issues to formally cooperate with us in the preparation
of the EA. These agencies may choose to participate once they have
evaluated the proposal relative to their responsibilities. Additional
agencies that would like to request cooperating agency status should
follow the instructions for filing comments provided under the Public
Participation section of this notice.
NEPA also requires the FERC to discover and address concerns the
public may have about proposals. This process is referred to as
``scoping.'' The main goal of the scoping process is to focus the
analysis in the EA on the important environmental issues. By this
Notice of Intent, we are requesting public comments on the scope of the
issues to address in the EA. All comments received are considered
during the preparation of the EA.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils.
Land use.
Water resources, fisheries, and wetlands.
Cultural resources.
Vegetation and wildlife.
Air quality and noise.
Endangered and threatened species.
We will also evaluate possible alternatives to the proposed project
or portions of the project, where necessary, and make recommendations
on how to lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
our recommendations to the Commission.
To ensure your comments are considered, please carefully follow the
instructions in the Public Participation section below.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. By becoming a commentor, your
concerns will be addressed in the EA and considered by the Commission.
You should focus on the potential environmental effects of the
proposal, alternatives to the proposal including alternative compressor
station sites, and measures to avoid or lessen environmental impact.
The more specific your comments, the more useful they will be. Please
carefully follow these instructions to ensure that your comments are
received in time and properly recorded:
Send an original and two copies of your letter to:
Kimberley D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First St., NE., Room 1A, Washington, DC 20426;
Label one copy of the comments for the attention of Gas
Branch 2, PJ-11.2;
Reference Docket No. CP08-45-000; and
Mail your comments so that they will be received in
Washington, DC on or before February 25, 2008.
The Commission encourages electronic filing of comments. See 18
Code of Federal Regulations 385.2001(a)(1)(iii) and the instructions on
the Commission's Internet Web site at https://www.ferc.gov under the
``eFiling'' link and the link to the User's Guide. Prepare your
submission in the same manner as you would if filing on paper and save
it to a file on your hard drive. Before you can file comments you will
need to create an account by clicking on ``Login to File'' and then
``New User Account.'' You will be asked to select the type of filing
you are making. This filing is considered a ``Comment on Filing.''
We may mail the EA for public comment. If you are interested in
receiving it, please return the Information Request (Appendix 2). If
you do not return the Information Request, you will be taken off the
mailing list.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding, or ``intervenor''. To
become an intervenor you must file a motion to intervene according to
Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR
385.214). Intervenors have the right to seek rehearing of the
Commission's decision. Motions to Intervene should be electronically
submitted using the Commission's eFiling system at https://www.ferc.gov.
Persons without Internet access should send an original and 14 copies
of their motion to the Secretary of the Commission at the address
indicated previously. Persons filing Motions to Intervene on or before
the comment deadline indicated above must send a copy of the motion to
the Applicant. All filings, including late interventions, submitted
after the comment deadline must be served on the Applicant and all
other intervenors identified on the Commission's service list for this
proceeding. Persons on the service list with e-mail addresses may be
served electronically; others must be served a hard copy of the filing.
Affected landowners and parties with environmental concerns may be
granted intervenor status upon showing good cause by stating that they
have a clear and direct interest in this proceeding which would not be
adequately represented by any other parties. You do not need intervenor
status to have your environmental comments considered.
Environmental Mailing List
An effort is being made to send this notice to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project. This includes all landowners who own
homes within distances defined in the Commission's regulations of
certain aboveground facilities.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at 1-866-208-FERC or on the
FERC Internet Web site (https://www.ferc.gov) using the ``eLibrary''
link. Click on the eLibrary link, then on ``General Search'' and enter
the docket number excluding the last three digits in the Docket Number
field. Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY,
contact (202) 502-8659. The
[[Page 5546]]
eLibrary link also provides access to the texts of formal documents
issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries and direct links to
the documents. Go to https://www.ferc.gov/esubscribenow.htm.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at https://www.ferc.gov/EventCalendar/
EventsList.aspx along with other related information.
Kimberly D. Bose,
Secretary.
[FR Doc. E8-1622 Filed 1-29-08; 8:45 am]